Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

Trade date

From Wikipedia, the free encyclopedia

Trade date is the date on which a security trade occurs. A trade done very early or very late falls on the previous or following trade date.

This occurs because in the international market a trade conducted in (e.g.) Japanese equities at 3 pm in London needs to effectively be considered as the following day for Japanese stock exchange reporting requirements.

In London and the US, the settlement period from trade date is 2 days.[1][2][3]

See also

[edit]

References

[edit]
  1. "Introduction of T+2 standard settlement period" (PDF). London Stock Exchange. 2 December 2013. Archived (PDF) from the original on 1 December 2018. Retrieved September 6, 2017.
  2. Plaehn, Tim; LeDona Withaar (30 April 2019). "Settlement Date Vs. Purchase Date". Finance - Zacks. Archived from the original on 27 January 2021.
  3. Chen, James. "Trade Date". Investopedia. Archived from the original on 27 November 2020.