Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

Talk:Sarah Mildred Long Bridge

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 3 years ago by 331dot in topic So... How does the *new* bridge work?

Tracks

[edit]

Is the railroad portion of this bridge just a single track wide? JNW2 (talk) 03:58, 6 December 2007 (UTC)Reply

Yes Ereuter (talk) 14:03, 5 December 2008 (UTC)Reply

Some history

[edit]

You may find what the Interstate Commerce Commission had to write in the late 1910s useful: Wikipedia:WikiProject Trains/ICC valuations/Proprietors of Portsmouth Bridge --NE2 04:46, 20 July 2009 (UTC)Reply

So... How does the *new* bridge work?

[edit]

The old bridge is described as having a lift portion for highway traffic, and some (not quite completely described) retractable span for rail.

However, the new bridge appears to similarly have a lower deck for rail and an upper deck for highway traffic, but the lift span appears to be single-level, so how does this bridge operate?72.43.88.221 (talk) 11:24, 28 April 2023 (UTC)Reply

This is not the forum to ask general questions about the operation of the bridge- however, to answer you, this article states " The result is a dual-purpose single 300-foot (91 m) lift span[24] with an integrated set of rails, which lowers to railroad level when rail traffic must cross." 331dot (talk) 12:17, 28 April 2023 (UTC)Reply