Talk:Hammersmith Bridge

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 8 months ago by Chiswick Chap in topic 2019–24 closure copied

File:Hammersmith Bridge 1, London, UK - April 2012.jpg to appear as POTD soon

[edit]

Hello! This is a note to let the editors of this article know that File:Hammersmith Bridge 1, London, UK - April 2012.jpg will be appearing as picture of the day on August 22, 2013. You can view and edit the POTD blurb at Template:POTD/2013-08-22. If this article needs any attention or maintenance, it would be preferable if that could be done before its appearance on the Main Page. Thanks!  Crisco 1492 (talk) 00:00, 4 August 2013 (UTC)Reply

Hammersmith Bridge
Hammersmith Bridge is a suspension bridge which crosses the River Thames in west London. The second permanent bridge on the site, the current bridge was designed by Sir Joseph Bazalgette and rests upon its predecessor's pier foundations. Bombings and an increase in traffic have led to the bridge being repaired and refurbished several times.Photograph: David Iliff

Correcting a sentence in the section on Structural problems

[edit]

This is the communications team at Hammersmith Council - we own Hammersmith Bridge and would like to correct a line that says previous works to the bridge were delayed by a dispute between us and Transport for London over funding. This claim is based on an erroneous headline in a BBC news article. The work wasn't held up by a funding dispute. Please can you permit the change I am making to the text to make this correction?

The BBC headline appears to summarise the contents of their news story accurately. It quotes LBHF leader Steven Cowan as follows: ""There's no way that this council is going to spend anything like that money, the majority of this issue is the responsibility of TfL and we will work with them to make sure the bridge is fit for public purpose.". --- Asteuartw (talk) 16:05, 15 May 2019 (UTC)Reply

Recentism and WP:COATRACK in 'Structural problems'

[edit]

The post-2019 'Structural problems' chapter has largely taken over the article with absurdly detailed, blow-by-blow he-said she-said narrative of political shenanigans which have more to do with the rifts between local, city, and central government than this particular bridge. I suggest we cut it down to describe the basic facts of the structural problems (per the chapter's title), and ensure its length is in keeping with the rest of the article. If folks think that much political detail is necessary, then we could split out the chapter to Protracted negotiations over the structural problems of Hammersmith Bridge, of course. Chiswick Chap (talk) 08:30, 21 April 2025 (UTC)Reply

2019–24 closure copied

[edit]

the section 2019–24 closure is copied and pasted can a user please help by rewriting it not to be copied Theknoledgeableperson (talk) 20:22, 14 November 2025 (UTC)Reply

I've run the article through all the checks that Earwig can do, and the section certainly does not appear to have been copied and pasted en bloc: indeed, it's reliably cited to multiple sources, and it derives as expected from those sources. Earwig did find some possible copyvios, mostly not in this section, and I've edited all of them. There remain a couple of directly-quoted bits of reported speech, which is fine as they are not overly long, in quotation marks, attributed, and cited. Chiswick Chap (talk) 21:11, 14 November 2025 (UTC)Reply