Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

Talk:1:5:200

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 11 years ago by 202.86.164.242 in topic Missing

Further reading

[edit]

You might be interested in: { Hughes, W.P.; Ancell, D; Gruneberg, S; Hirst, L (2004). "Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings". Proceedings of the 20th Annual ARCOM Conference. Heriot-Watt University: 373–381. Retrieved 7 November 2013. {{cite journal}}: Check |authorlink1= value (help); External link in |authorlink1= (help)

This paper claims that 1:5:200 is more of a marketing buzz with few evidence from a scientific point of view.  Preceding unsigned comment added by 86.59.105.184 (talkcontribs) 06:45, 8 February 2007

Missing

[edit]

The article forgot to mention whether run cost is 200x build cost or 1/200th build cost —The preceding unsigned comment was added by Tabby (talkcontribs) 01:06:48, August 19, 2007 (UTC). The article also forgot to use skyscraper as a study subject. Normal life cost calculation are based on 35 years instead of 25 years. For eg. the International Commerce Centre (ICC) of Hong Kong. It's 108 levels rented by 3 investment banks, Morgan Stanley, Swiss Financial Bank and Deutsche Bank. The ratio may well over 1:5:200. — Preceding unsigned comment added by 202.86.164.242 (talk) 04:50, 22 August 2014 (UTC)Reply