Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

Port Vera

Port Vera, or Vera Port Coal Terminal as it is colloquially known, is a coal terminal in Russia's Far East. It is located across the bay from Vladivostok.[1][2][3] It cost more than $1 billion in Rubles to build.[4] The terminal is to have a capacity of to 20 million tonnes per year.[5]

History

[edit]

Port Vera project began in 2014. It was subsidized by Rostec and designed by Rosengineering.[4]

In August 2022, the port was completed with a draft of 12.11 meters. The berth is 246 meters long.[5]

In 2023, the port was sold to the Sibanthracite Group. [6]

In February 2025, North American Company, Inc. made a purchase offer for Port Vera and its assets of $5 billion in Rubles. No other information is known about this offer.

References

[edit]
  1. ↑ "Glavgosexpertiza approves construction of coal terminal Port "Vera" in Primorye".
  2. ↑ https://en.topcor.ru/35271-morskoj-terminal-port-vera-operedivshij-sankcii.html. {{cite news}}: Missing or empty |title= (help)
  3. ↑ "Roing".
  4. 1 2 "Construction of coal port Vera to require $1 billion of investment".
  5. 1 2 "Construction of coal terminal Port Vera completed with positive conclusion obtained from ad hoc regulator". 26 August 2022.
  6. ↑ "The owner of Sibanthracite Group is to buy a port in Primorsky Krai | the Coal Hub". 29 June 2024.

42°57′27″N 132°17′37″E / 42.95750°N 132.29361°E / 42.95750; 132.29361