Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

Montclair Transit Center

Montclair
Montclair Transit Center in 2025
General information
Location5091 Richton Street
Montclair, California
United States
Coordinates34°05′38″N 117°41′46″W / 34.0940°N 117.6962°W / 34.0940; -117.6962
Owned byCity of Montclair, State of California, San Bernardino County Transportation Authority
LineSCRRA San Gabriel Subdivision[1]
Platforms2 side platforms
Tracks2
Connections
Construction
Parking1,600 spaces, 32 accessible spaces[2]
AccessibleYes
History
OpenedFebruary 22, 1993 (1993-02-22)[3]
Services
Preceding station Metrolink Following station
Claremont San Bernardino Line Upland
Preceding station Foothill Transit Following station
Pomona Transit Center
(stops en route)
Silver Streak Terminus
Location
Map

The Montclair Transit Center (also known as the Montclair Transcenter)[4] is an intermodal transit center located at 5091 Richton Street in Montclair, California. It is located between Central and Monte Vista Avenues on Richton Street, just north of the Montclair Plaza shopping center.

Montclair Transit Center is served by 44 Metrolink San Bernardino Line trains (22 in each direction) each weekday, with trains arriving every 30 minutes for most of the day, and every 60 minutes in the early morning and evening. Weekend service consists of 16 trains (8 in each direction) on both Saturday and Sunday, evenly spaced throughout the day.[5]

The transit center is jointly owned by the City of Montclair, Caltrans, and the San Bernardino County Transportation Authority. Caltrans owns all of the parking spaces, while Montclair and SBCTA jointly own the transit center and Metrolink platform.[6][7] Omnitrans, Foothill Transit, and the Riverside Transit Agency all provide bus service, with Foothill and RTA providing express service, Foothill providing bus rapid transit service via the Silver Streak, and Foothill and Omnitrans providing local service. It is also a station on the Metrolink San Bernardino Line.

The station serves as the dividing line between Foothill's service area to the west, and Omnitrans' service area to the east. Both agencies accept each other's passes for one transfer outbound from the station.

Greyhound moved to the transit center in 2022 from a location in neighboring Claremont, as part of its transition away from company-operated facilities.[8] The move caused controversy on the Montclair City Council, with one member falsely claiming that the Claremont Greyhound station was a magnet for crime, which was refuted by the city manager and rebuked by other council members.[9] A child care center also operated at the transit center, until it was closed during the COVID-19 pandemic.[7]

The FlixBus boards from the nearby Montclair Plaza mall, at Moreno Street and Lindero Avenue.

Phase 2B of the Foothill Extension project proposes to eventually extend the Los Angeles Metro Rail system east to the Montclair Transit Center. In 2017, Los Angeles Metro board of directors initially approved to extend the A Line (then the Gold Line) to Claremont station in Claremont.[10] However, officials in San Bernardino County convinced planners to further continue the extension east to the Montclair Transit Center, saying the transit center made for a natural terminus for the line.[11] By 2024, SBCTA set aside $80 million in funding to directly fund the construction of the segment of the extension within San Bernardino County.[12] However, at a board meeting on September 3, 2025, the SBCTA board of directors voted to divest what it had allocated, redirecting the funds to other uses due to rising costs and limited local input.[13][14][15] The decision placed the Claremont–Montclair segment on indefinite hold.[16][17] At its January 14, 2026 meeting, Metro's Construction Committee approved $94 million in funding for design and engineering on the Pomona–Claremont segment.[18]

References

[edit]
  1. SMA Rail Consulting (April 2016). "California Passenger Rail Network Schematics" (PDF). California Department of Transportation. p. 19.
  2. "Montclair Train Station". Metrolink. Retrieved June 13, 2023.
  3. Napoles, Marianne (February 24, 1993). "Metrolink trains whistling into Montclair station". South Ontario News. p. 8. Retrieved July 6, 2019 via Newspapers.com.
  4. "Local Transportation". Montclair, CA. Retrieved November 5, 2025.
  5. "San Bernardino Line Schedule Updates". Metrolink. Retrieved January 20, 2025.
  6. "State-owned parking at Montclair transit center eyed for housing". Daily Bulletin. October 6, 2021. Retrieved November 5, 2025.
  7. 1 2 Successor Agency to the City of Montclair Redevelopment Agency (November 4, 2013). "LONG-RANGE PROPERTY MANAGEMENT PLAN" (PDF).
  8. "Greyhound moves to Montclair TransCenter from Claremont". Daily Bulletin. April 19, 2022. Retrieved November 5, 2025.
  9. "Montclair adds Greyhound bus lines to its transit center". Daily Bulletin. December 23, 2021. Retrieved November 5, 2025.
  10. "Metro Gold Line Extension to Claremont Montclair". Curbed L.A. June 23, 2017. Archived from the original on June 23, 2017.
  11. Stockstill, Mason. "Ontario courts Gold Line extension". Inland Valley Daily Bulletin. Digital First Media. San Gabriel Valley Tribune. Retrieved September 11, 2010.
  12. Scauzillo, Steve (November 1, 2024). "LA Metro awards funding to extend light-rail line into San Bernardino County". Los Angeles Daily News. MediaNews Group. Retrieved November 2, 2024.
  13. Alonzo, Andrew (September 4, 2025). "Gold Line bombshell: Claremont to Montclair segment in limbo". Claremont Courier. Retrieved September 21, 2025.
  14. Yarbrough, Beau (September 3, 2025). "San Bernardino County transportation agency votes down Montclair light-rail extension". Inland Valley Daily Bulletin. MediaNews Group. Retrieved September 4, 2025.
  15. Sharp, Steven (September 9, 2025). "Foothill extension to Montclair dealt a setback". Urbanize LA. Urbanize Media. Retrieved September 12, 2025.
  16. Levy Buch, Lisa (September 12, 2025). "Claremont and Montclair Segments to Be Built Separately" (PDF) (Press release). Foothill Gold Line. Retrieved September 24, 2025.
  17. Scauzillo, Steve (September 17, 2025). "Why did San Bernardino County kill the A Line extension to Montclair?". Los Angeles Daily News. MediaNews Group. Retrieved September 21, 2025.
  18. Linton, Joe (January 14, 2026). "Metro Committee Approves Sepulveda Rail Alignment, Postpones Torrance Rail Approval". Streetsblog LA. OpenPlans. Retrieved January 16, 2026.
[edit]