Kiakkai Bridge

Kiakkai Bridge
Kiakkai Bridge viewed from the south
Coordinates13°47′58″N 100°30′57″E / 13.799373°N 100.515765°E / 13.799373; 100.515765
CrossesChao Phraya River
LocaleBangkok, Thailand
Characteristics
DesignExtradosed bridge
Location
Map
Interactive map of Kiakkai Bridge

The Kiakkai Bridge is an under-construction extradosed bridge crossing the Chao Phraya River in Kiakkai, Thanon Nakhon Chai Si Subdistrict, Dusit District, Bangkok, Thailand.[1][2][3][4]

The part of the bridge that crosses the river will be 165 meters. With access roadways on either side, the total length will be 320 metres. The crossing will have two lanes in each direction.[5]

Construction will involve the creation of an elevated road that will connect bridge on the west side of the Chao Phraya River connecting to Charan Sanit Wong Rd.

Construction will involve the creation of an elevated road linking the bridge to Charan Sanit Wong Road on the west side of the Chao Phraya River. On the east side, access ramps will be built and the bridge will connect to Thahan Road and the intersection at Saphan Daeng.[6]

The total cost is expected to be $475.6 million with a planned completion date of 2026. The project is under the management of the Bangkok Metropolitan Administration (BMA).

References

[edit]
  1. ↑ "Speeding $475.6 million bridge and road project for Bangkok". Globalhighways.com. Retrieved 13 September 2026.
  2. ↑ "Kiakkai Bridge fast-tracked to 2026". Bangkok Post. 17 March 2025.
  3. ↑ "hao Phraya River Crossing Bridge Project at Kiakkai Intersection – Phase 3". Itd.co.th. Retrieved 13 September 2026.
  4. ↑ "Bridge over troubled water: BMA's Bangkok river crossing race". Thethaiger.com. 17 March 2025.
  5. ↑ "กทม.อัปเดต 'สะพานเกียกกาย' เผยเส้นตาย 2 ตอนแรก พ.ย. 2568" [Bangkok Metropolitan Administration (BMA) provides update on ‘Kiakkakai Bridge’ project, revealing deadlines for the first two phases: November 2025.] (in Thai). Archived from the original on 2025-01-15.
  6. ↑ "เช็กสะพานเกียกกาย 3 สัญญา ลุ้นเสร็จหมด ส.ค. 70 'เวนคืน-ย้ายสาธารณูปโภค' อุปสรรคสำคัญ". สำนักข่าวอิศรา. September 12, 2026.