Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

Eurus Wind Farm

Eurus Wind Farm
Map
CountryMexico
LocationJuchitán de Zaragoza, Oaxaca, Mexico
Coordinates16°32′25″N 94°57′14″W / 16.54028°N 94.95389°W / 16.54028; -94.95389
StatusOperational
Construction costUS$550 million
Wind farm
TypeOnshore
Power generation
Units operational167
Nameplate capacity250.5 MW

The Eurus Wind Farm is a wind farm located in Juchitán de Zaragoza, Oaxaca, Mexico. The largest wind farm in Latin America, the partnership between Cemex and Acciona Energia cost US$550 million to build. Its 167 wind turbines combine to generate 250.5 megawatts (MW), sufficient power to supply about half a million people. By contrast with traditional means of power, it may reduce annual carbon dioxide emissions by 600,000 metric tons.[1][2][3]

See also

[edit]

References

[edit]