Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

EOS-05

From Wikipedia, the free encyclopedia

GISAT-1A
GISAT-1A in the clean room before encapsulation
NamesEOS-05 / GISAT-1A
Mission typeEarth observation
OperatorISRO
COSPAR ID2026-202A Edit this at Wikidata
SATCAT no.100607Edit this on Wikidata
Websitehttps://www.isro.gov.in/Mission_GSLVF17.html
Spacecraft properties
SpacecraftGISAT
BusI-2K
ManufacturerISRO
Launch mass2,367 kg (5,218 lb)
Start of mission
Launch date3 September 2026, 21:25 UTC
RocketGSLV Mk II (F17)
Launch siteSatish Dhawan Space Centre, SLP
ContractorISRO
Orbital parameters
Reference systemGeocentric orbit
RegimeGeosynchronous orbit
← EOS-N1
← GISAT-1
GISAT-2 →

EOS-05 (also known as GISAT-1A) is an Indian Earth observation satellite. It is the second satellite in the GISAT series produced by ISRO.[1] The satellite aims to improve the existing remote sensing capabilities.[2][3][4]

GISAT-1A in deployed configuration

Objectives

[edit]

GISATs image in multi-spectral and hyper-spectral bands to provide near real-time pictures of large areas of India, under cloud-free conditions, at frequent intervals which is, selected field image in every 5 minutes and entire Indian landmass image every 30 minutes at 42 metres (138 ft) spatial resolution.[5]

These near real-time observations serve for monitoring of natural disasters like cyclones, floods, cloudbursts, and forest fires, as well as for agricultural assessment and security surveillance.[6]

Instruments

[edit]
Imaging capabilities of GISAT-1A
Band Channels Ground Resolution(m) Range(μm)
Multispectral (VNIR) 6 42 0.45 – 0.875
Hyperspectral (VNIR) 158 318 0.375 – 1.0
Hyperspectral (SWIR) 256 191 0.9 – 2.5

Launch

[edit]

GISAT-1A was launched from Launchpad 2 of the Satish Dhawan Space Centre aboard the GSLV-F17 mission at 2:55 am IST on 4 September 2026. The satellite was placed at the intended Sub-Geosynchronous Transfer Orbit (Sub-GTO) about 18 minutes after lift-off. At 2,637 kg, the satellite is the heaviest satellite launched by GSLV.[7][8]

On 5 and 6 September, the satellite fired its Liquid Apogee Motor (LAM) engine twice for 5,406.4 seconds (about 90 minutes) until 8:19 pm IST and 5 minutes to reach orbits at 20,000 km × 31,129 km and 35,786 km, respectively. The satellite was originally present at an altitude of 171 km.[9][10]

On 7 September, the third and final orbit raising manoeuvre to reach its intended geosynchronous orbit with altitudes ranging between 34,903 km × 35,884 km. The LAM engine fired for 1247 seconds until 8:47 pm IST. The health and systems of the satellite will be monitored for the next few days after which the imaging systems will be activated.[11][12]

References

[edit]
  1. ↑ Mukunth, Vasudevan (19 August 2026). "All eyes on GISAT-1A mission as ISRO aims to mend faulty launch streak". The Hindu. ISSN 0971-751X. Retrieved 3 September 2026.
  2. ↑ "GISAT-1, 2 (EOS-03, 05)". Gunter's Space Page. Retrieved 2 February 2026.
  3. ↑ "CEOS EO Handbook – AGENCY SUMMARY - ISRO". CEOS. October 2022. Retrieved 1 December 2022.
  4. ↑ "WMO OSCAR | Satellite: GISAT". space.oscar.wmo.int. Retrieved 26 November 2025.
  5. ↑ "GSLV-F17/EOS-05 MISSION". www.isro.gov.in. Retrieved 30 August 2026.
  6. ↑ "The GISAT-1A Mission". INSIGHTS IAS - Simplifying UPSC IAS Exam Preparation. 20 August 2026. Retrieved 3 September 2026.
  7. ↑ C.S, Hemanth (4 September 2026). "ISRO successfully launches Earth observation satellite EOS-05". The Hindu. ISSN 0971-751X. Retrieved 6 September 2026.
  8. ↑ "'Smart boy' GSLV delivers GISAT-1 into orbit, India gets new eyes in space". India Today. 4 September 2026. Retrieved 6 September 2026.
  9. ↑ "EOS-05 satellite completes orbit manoeuvres en route to GEO". BusinessLine. 6 September 2026. Retrieved 6 September 2026.
  10. ↑ Singh, Gurpreet (6 September 2026). "171 km to 20,000 km: ISRO EOS-05 completes first orbit raise on journey to 35,786 km orbit". Moneycontrol. Retrieved 6 September 2026.
  11. ↑ "New 'eye in the sky': Isro's EOS-05 satellite settles into geosynchronous orbit". The Indian Express. 8 September 2026. Retrieved 8 September 2026.
  12. ↑ "ISRO's EOS-05 Mission: Final Orbit-Raising Manoeuvre Successful, Satellite Now In Geostationary Orbit". ETV Bharat News. 8 September 2026. Retrieved 8 September 2026.