Dashiba station

Dashiba

大石坝
Line 5 platform
General information
LocationHongshi Road
Liangjiang New Area, Chongqing
China
Coordinates29°34′21.79″N 106°29′28.25″E / 29.5727194°N 106.4911806°E / 29.5727194; 106.4911806
SystemChongqing Rail Transit
Operated byChongqing Rail Transit Corp., Ltd
Lines     Line 4
     Line 5
Platforms4 (2 island platforms)
Tracks4
Construction
Structure type
Underground
Platform levels
2
AccessibleYes
Other information
Station code
4
/
5
5
/
17
History
Opened24 December 2018 (2018-12-24) (Line 5)[1]
10 February 2026 (2026-02-10) (Line 4)
Services
Preceding station Chongqing Rail Transit Following station
Panxi Line 4 Daqingcun
towards Huangling
Dalongshan
towards Yuegangbeilu
Line 5 Zhongshutuo
towards Tiaodeng
Location
Map

Dashiba Station is a station on Line 4 and Line 5 of Chongqing Rail Transit[2] in Chongqing municipality, China, which is located in Liangjiang New Area. Line 5 began its service on 2018 and Line 4 began on 2026.[1][3][4]

Station structure

[edit]

Line 4

[edit]
1F Ground level Exits
B1 Concourse Tickets, Service Center
B2      Line 4 towards Shimahelijiao (Panxi)
Island platform, doors open on the left
     Line 4 towards Huangling (Daqingcun)

Line 5

[edit]
1F Ground level Exits
B1 Concourse Tickets, Service Center
B2      Line 5 towards Yuegangbeilu (Dalongshan)
Island platform, doors open on the left
     Line 5 towards Tiaodeng (Zhongshutuo)

References

[edit]
  1. 1 2 "轨道5号线大石坝站投用". 2018-12-24. Archived from the original on 2021-01-27. Retrieved 2022-04-27.
  2. "重庆轨道交通运营线网图". cqmetro.cn. Archived from the original on 2019-05-11. Retrieved 2022-04-27.
  3. "轨道交通4号线西延伸段,今日开通!". 重庆住建微信公众号. 2026-02-10. Retrieved 2026-02-10.
  4. "轨道交通4号线西延伸段,今日开通初期运营". 两江新区官网. 2026-02-10. Retrieved 2026-02-10.