Chigang station
Line 8 platform | ||||||||||||||||
| Chinese name | ||||||||||||||||
| Simplified Chinese | 赤岗站 | |||||||||||||||
| Traditional Chinese | 赤崗站 | |||||||||||||||
| Literal meaning | Red Stone Hill station | |||||||||||||||
| ||||||||||||||||
| General information | ||||||||||||||||
| Location | Northeast side of the intersection of Xingang Middle Road (新港中路) and Jianghai Avenue (江海大道) Chigang Subdistrict, Haizhu District, Guangzhou, Guangdong China | |||||||||||||||
| Coordinates | 23°5′57.31″N 113°19′45.19″E / 23.0992528°N 113.3292194°E | |||||||||||||||
| Operator | Guangzhou Metro Co. Ltd. | |||||||||||||||
| Lines | ||||||||||||||||
| Platforms | 4 (2 island platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | 824 1219 | |||||||||||||||
| History | ||||||||||||||||
| Opened | ||||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Chigang Station (simplified Chinese: 赤岗站; traditional Chinese: 赤崗站; Jyutping: cek3 gong1 zaam6; Cantonese Yale: Cěkgōng Jaahm) is an interchange station between Line 8 and Line 12 of the Guangzhou Metro. The Line 8 station started operations on 28 June 2003. It is located to the northeast of the junction of Xingang Middle Road (新港中路) and Jiangnan Avenue (江海大道) in the Haizhu District.[1] It became an interchange station with Line 12 on 13 February 2026 when it started operations at this station.
Before the extension to both lines 2 and 8 opened in September 2010, this station ran as part of Line 2 as a single line from Wanshengwei to Sanyuanli.[2]
Station layout
[edit]- Line 8
The Line 8 station has two levels, the ground level is the exit, and it is surrounded by Xingang Middle Road, Guangdong Second People's Hospital and the nearby commercial complex, the first basement level is the concourse, and the second basement level is the platform.
| G | Street level | Exits C1, C2 |
| L1 Concourse |
8 Concourse | Customer Service, Ticket Machines, Shops, Security Facilities, transfer to 12 |
| L2 Platforms |
Platform 1 | |
| Island platform, doors will open on the left | ||
| Platform 2 | 8 towards Wanshengwei (Modiesha) | |
- Line 12
The Line 12 station has four levels, with the deepest point being 39.8m, making it the deepest station on Line 12.[3] The ground level is the exit, the first basement level is the concourse and transfer concourse and passageways with Line 8, the second and third floors are equipment floors, and the fourth basement level is the platform. This section of the station adopts the same white and light green glass curtain wall decoration as the standard stations on Line 12.
| L1 | Transfer concourse | Paid-area transfer to Line 8 |
| Line 12 Concourse | Ticket Vending Machines, Customer Service Center, Security Facilities | |
| Transfer passage | Toilets, Nursery, Police Station, Security Facilities, Non-paid area transfer to Line 8 | |
| L2 | Mezzanine | Station Equipment |
| L3 | Mezzanine | Station Equipment |
| L4 Platforms |
Platform 4 | |
| Island platform, doors will open on the left | ||
| Platform 3 | 12 towards Higher Education Mega Center South (Chisha North) | |
Concourse
[edit]Both the Line 8 and Line 12 concourses are located on the first basement level. The paid areas of the two concourses are connected by a transfer concourse, while the unpaid areas are connected by a connecting passageway on the east side of the two station buildings. The concourse has a column-free design, making it more spacious. There are escalators and stairs in the fare-paid areas for passengers to reach the platforms. The elevator connecting the Line 8 platform and the concourse requires the assistance of the station staff because the elevator door on the side of the concourse is located in the non-paid area on the west side.
In addition, both the Line 8 and Line 12 stations have duck neck shops, as well as automatic vending machines, smart lockers and other facilities.
- Line 8 concourse
- Line 12 concourse
- Transfer passage
- Transfer interface
- Non-paid area transfer passage
- The concourse connecting passage has toilets and a nursery near the Line 8 concourse
Platform
[edit]Both Line 8 and Line 12 have an underground island platform each. The Line 8 platform is located under Xingang Middle Road. The Line 12 platform is located below the approach bridge of Liede Bridge, underground on the west side of Huangpu Canal. Line 8 is on the upper level, and Line 12 is on the lower level.
In addition, there is a storage line at the east end of the Line 8 station. When there is a fault on Line 8 east of this station, trains bound for Wanshengwei will turn back through this storage line and use this station as the temporary terminus.
The calligraphy of the station name of this site was written by Zhang Biaozhi, then vice chairman of the Guangzhou Calligraphers Association.[4]
- Line 8 platform
- Platform 3 (Line 12 towards HEMC South)
- Platform 4 (Line 12 towards Xunfenggang)


Entrances/exits
[edit]The station has 5 points of entry/exit. When the station was initially opened, Exits C1, C2 and D2 were set up. Due to the construction of Line 12 station, Exit D2 was closed since 10 October 2021.[5] When the Line 12 station opened, Exits B, D and E, were added. Exit C1 is equipped with a stairlift, and Exit D is equipped with an elevator.
- B: Xingang Middle Road
- C1: Xingang Middle Road, Guangdong Provincial Second People's Hospital, Southern Medical University Hospital of Integrated Traditional Chinese and Western Medicine

- C2: Xingang Middle Road
- D: Xingang Middle Road

- E: Jianghai Avenue
- Entrance B
- Entrance C1
- Entrance C2
- Entrance D
- Entrance E
History
[edit]Line 2 (now Line 8)
[edit]In the 1988 subway network plan, this station appeared as the terminal station of Line 2 in Haizhu District. Later, in 1997, in Plan A, this station became an intermediate station of Line 5 (now Line 8), which was dismantled from Line 2, and also interchanged with other lines. In later plans, this station was designated as an intermediate station on Line 8 and was no longer an interchange station. Subsequently, this station became one of the stations of the first phase of the old Line 2, which was built first, and the method of pre-emptive long-term split was adopted. Construction of the first phase of Line 2 officially started on 10 October 1999.
The storage line on the east side of the station was originally not planned. Since Kecun station to the west of this station was suddenly designated as a future interchange station with Line 3, the planned intermediate terminus needed to be moved east from Lujiang to cover Kecun Station. However, Kecun Station did not add a storage line during construction, so it was changed to this station as the intermediate terminus. At the same time, a storage line was added to the east of the station to provide a small intersection turnback condition.[6]
On 28 June 2003, the station was opened with the first phase of Line 2 from Xiaogang to Pazhou.[7] From 22 to 24 September 2010, the station was suspended along with the old Line 2 and the line was dismantled. In the early morning of 25 September, the service of this site was restarted with the new Line 8.[8]
Lines 12 and 19
[edit]In the latest plan in 2014, Line 12 was changed to have a transfer at this station[9] and was implemented with the launch of Line 12 in the first quarter of 2017. According to the relevant information of the 2019 Line 12 supervision bidding, Line 19 changed the planned alignment and added a planned transfer at this station.[10]
The Line 12 station site began to be enclosed on 14 March 2020.[11] Main structure construction began in April 2022,[12] and the station was topped out in October 2024.[3] Construction on the connection to the Line 8 station concourse began in October 2025.[13] Due to the lag in the construction progress, the station could not be opened with the initial section of Line 12, but the station platform has completed civil works and decorations, and has been equipped with screen doors, escalators and elevators, as well as the necessary equipment. However, this station, like Sun Yat-sen University South Gate of Line 10, does not have a covered-up screen door, and passengers can see the platform when their train passes the station.[14]
On 31 December 2025, the Line 12 station completed the "three rights" transfer, and operational testing began immediately.[15] On 10 February 2026, the station passed the pre-opening safety assessment and officially opened on 13 February with the first train.[16]
Operation
[edit]During COVID-19 pandemic control rules at the end of 2022, due to the impact of prevention and control measures, station service was suspended from 09:00 on 5 November 2022 to the afternoon of 30 November 2022.[17] During that time, it served candidates for college entrance examinations and other examinations, and normal services were still provided until 09:00 on the 5th and 6th.[18]
Future development
[edit]According to the latest plan, Line 19 will set up a station located east of Liede Bridge, allowing transfers to the existing Lines 8 and 12. Line 19 is a long-term line, and a transfer node was reserved on the sixth underground floor during construction of Line 12.[19]
References
[edit]- ↑ Chigang
- ↑ "Canton Metro stations". Archived from the original on 29 March 2007. Retrieved 16 December 2008.
- 1 2 李天研 (5 October 2020). "攻克多个"全线之最",广州两条在建地铁新线刷新进度条" [Conquering many "bests of the whole line", the two new subway lines under construction in Guangzhou refreshed the progress bar]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 7 October 2024. Retrieved 10 July 2025.
- ↑ 广东书法名家墨宝:地铁二号线站名纪念册 [Guangdong Calligraphy Masterpieces: Metro Line 2 Station Name Album] (in Simplified Chinese). Guangzhou: Guangzhou Metro. 29 December 2002. p. 13.
- ↑ Guangzhou Metro (9 October 2021). "悠播报:八号线赤岗站D2出口因施工需要临时封闭" [News from Youbo: Exit D2 of Chigang Station on Line 8 is temporarily closed due to construction.]. Archived from the original on 9 October 2021. Retrieved 20 February 2026.
- ↑ Guangzhou Metro Corporation; Guangzhou Metro Design and Research Institute (2005). 广州地铁二号线设计总结 [Guangzhou Metro Line 2 Design Summary] (in Simplified Chinese). Beijing: Science Press. pp. 18, 75. ISBN 7-03-015241-7. Archived from the original on 11 April 2023. Retrieved 8 April 2023.
- ↑ 邓恒 (23 June 2003). "三元里到琶洲仅需半小时" [It only takes half an hour to get from Sanyuanli to Pazhou]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 8 April 2023. Retrieved 10 July 2025 – via Sina News.
- ↑ 叶平生 (17 September 2010). "广州地铁二号线中秋期间停运3天" [Guangzhou Metro Line 2 will be suspended for 3 days during the Mid-Autumn Festival]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 8 April 2023. Retrieved 10 July 2025 – via Sina News.
- ↑ "我院启动广州市2015-2025年轨道交通建设规划编制工作" [Our institute has started the preparation of Guangzhou's 2015-2025 rail transit construction plan] (PDF). Metro Design Newsletter (in Simplified Chinese). No. 56. 27 October 2014. p. 13. Archived from the original (PDF) on 15 December 2014.
- ↑ "广州市轨道交通十二号线及同步实施工程监理招标公告" [Guangzhou Metro Line 12 and Simultaneous Implementation Project Supervision Tender Announcement]. Guangzhou Public Resources Trading Center (in Simplified Chinese). Archived from the original on 8 June 2019.
- ↑ 李天研 (4 March 2020). "十二号线赤岗站今天开始围蔽施工,绕行方案在此" [Line 12 Chigang Station started enclosure construction today, detour plan is here]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 24 November 2022.
- ↑ "赤岗站完成工序转换" [Chigang Station completed process conversion]. CCCC First Harbor Engineering Bureau Urban Transportation Company (in Simplified Chinese). 21 April 2022. Archived from the original on 4 September 2025. Retrieved 10 July 2025 – via Official WeChat Account.
- ↑ "悠播报:赤岗站部分区域围蔽施工" [Broadcast: Partial construction enclosure at Chigang Station]. Guangzhou Metro (in Simplified Chinese). 20 October 2025. Archived from the original on 20 October 2025. Retrieved 9 September 2026 – via Sina Weibo.
- ↑ 李天研 (24 April 2025). "十二号线东西两段年内率先开通,中段及赤岗站今年无法开通" [The east and west sections of Line 12 will be opened first this year, while the middle section and Chigang Station will not be opened this year]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 24 April 2025. Retrieved 10 July 2025.
- ↑ 李天研 (Li Tianyan) (22 January 2026). "地铁十二号线赤岗站,有望春节前开通" [Chigang Station on Metro Line 12 is expected to open before the Spring Festival.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 22 January 2026. Retrieved 9 September 2026.
- ↑ 郑慧梓 (Zheng Huizi) (12 February 2026). "广州地铁12号线赤岗站2月13日开通,可换乘8号线" [Chigang Station on Guangzhou Metro Line 12 opened on 13 February, allowing transfers to Line 8.]. Nanfang Daily (in Simplified Chinese). Archived from the original on 14 February 2026. Retrieved 9 September 2026.
- ↑ "广州市内所有地铁站逐步恢复正常运营" [All subway stations in Guangzhou gradually resume normal operations]. Daily Economic News. 30 November 2022. Archived from the original on 30 November 2022.
- ↑ 谭超 (4 November 2022). "11月5日海珠所有地铁车站和有轨电车暂停服务,换乘站内可换乘" [All subway stations and trams in Haizhu will be suspended on 5 November. Transfers are allowed at transfer stations.]. Southern Network. Archived from the original on 4 November 2022.
- ↑ "双线织城脉,活力启新程!广州地铁设计研究院承担总体总包设计的广州地铁十号线、十二号线东西段开通运营" [Double lines weave the city's pulse, vitality starts a new journey! The east and west sections of Guangzhou Metro Line 10 and Line 12, designed by Guangzhou Metro Design Institute, are put into operation]. Guangzhou Metro Design and Research Institute (in Simplified Chinese). 29 June 2025. Archived from the original on 20 September 2025. Retrieved 10 July 2025 – via Official WeChat Account.