Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a246dd3dcdbc2c82

Jump to content

// Workers AI · dad joke modeWhat did the Kwar Hydroelectric Project say? I'm current-ly under construction.

Kwar Hydroelectric Project
Kwar Hydroelectric Project is located in Jammu and Kashmir
Kwar Hydroelectric Project
Kwar Hydroelectric Project
Location within Jammu and Kashmir
Kwar Hydroelectric Project is located in India
Kwar Hydroelectric Project
Kwar Hydroelectric Project
Location within India
Official nameKwar HE Project
CountryIndia
LocationKishtwar, Jammu and Kashmir
Coordinates33°21′17″N 75°53′02″E / 33.354609°N 75.884012°E / 33.354609; 75.884012
PurposePower
StatusUnder Construction
Construction began2022
Construction cost₹4526.12 Cr (September 2020 Price Level)[1]
OwnerChenab Valley Power Projects Limited[2]
Dam and spillways
Type of damGravity
ImpoundsChenab River
Height109 m (358 ft)
Kwar Hydroelectric Project
Coordinates33°21′17″N 75°53′02″E / 33.354609°N 75.884012°E / 33.354609; 75.884012
Turbines4 x 135 MW
Installed capacity540 MW

Kwar HE Project, is an under construction Hydroelectric power plant with 540 MW capacity in Kishtwar District of Jammu and Kashmir.[3] The plant is expected to generate 1975 million units of electricity once operational.[4] During a review meeting in January 2026, headed by Union Power Minister Manohar Lal Khattar at Kishtwar, it was stated that the project is expected to be completed by March 2028.[5] In January 2024, the flow of Chenab river was diverted to felicitate the main dam construction.[6] The construction of this power project was fast tracked by India after Indus Waters Treaty was put in abeyance in the aftermath of 2025 Pahalgam attack.[7] In November 2025, a major fire incident happened inside one of the tunnels of the project when a load carrier caught fire. 39-50 workers were rescued.[8][9]

See also

[edit]

References

[edit]
  1. "Kwar HE Project/About Project". CVPPL.
  2. "Chenab Valley Power Project Limited(CVPPL)/Company Overview". CVPPL.
  3. "Kwar HE Project/About Project". CVPPL.
  4. "Cabinet approves construction of 540 Megawatt Kwar Hydro Electric project through M/s. Chenab valley Power Projects Private Limited". Press Information Bureau. Retrieved 22 April 2022.
  5. "Power Minister Manohar Lal reviews key hydropower projects during two-day J&K visit". DD News. Retrieved 6 January 2026.
  6. "Govt seeks ₹3,119 crore loan to accelerate Kwar Dam, tightens grip on Chenab". CNBC TV18. Retrieved 11 July 2025.
  7. "Indus treaty in abeyance, India fast-tracks four Chenab hydropower projects with tight deadlines". Firstpost. Retrieved 6 January 2026.
  8. "Several Workers Rescued After Truck Catches Fire Inside Kwar Hydroelectric Project Tunnel In Jammu Kashmir". ETV Bharat. Retrieved 17 November 2025.
  9. "Major tragedy averted at Kwar HEP project". Greater Kashmir. Retrieved 17 November 2025.