Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a25c58eb09061528

Jump to content

Kiru Hydroelectric Project

Kiru Hydroelectric Project
Kiru Hydroelectric Project is located in Jammu and Kashmir
Kiru Hydroelectric Project
Kiru Hydroelectric Project
Location within Jammu and Kashmir
Kiru Hydroelectric Project is located in India
Kiru Hydroelectric Project
Kiru Hydroelectric Project
Location within India
Official nameKiru HE Project
CountryIndia
LocationKishtwar, Jammu and Kashmir
Coordinates33°20′43″N 75°57′21″E / 33.345309°N 75.955718°E / 33.345309; 75.955718
PurposePower
StatusUnder Construction
Construction began2019
OwnerChenab Valley Power Projects Limited
Dam and spillways
Type of damGravity
ImpoundsChenab River
Height135 m (443 ft)
Kiru Hydroelectric Project
Coordinates33°20′43″N 75°57′21″E / 33.345309°N 75.955718°E / 33.345309; 75.955718
Turbines4 x 156 MW
Installed capacity624 MW

Kiru HE Project, is an under construction Hydroelectric plant with 624 MW capacity in Kishtwar District of Jammu and Kashmir.[1] The run-of-river system, being developed by Chenab Valley Power Projects Limited, a joint venture between NHPC (51 percent) and J&K State Power Development Corporation (49 percent). It is designed to generate 2272 million units annually once operational. Its foundation stone was laid in March 2019, following environmental clearance and the Cabinet approval granted in 2016.[2][3] It has a 135 m high concrete gravity dam. Its power house is underground with 4 units of 156 MW each making total capacity of 624 MW. The project was originally scheduled for commissioning in September 2023, it underwent first revision to July 2025 before the latest postponement to the end of 2026.[4][5] In April 2026, it achieved completion of 10 lakh cubic meters of dam concreting, out of a total target of 12 lakh cubic meters.[6]

See also

[edit]

References

[edit]
  1. "Kiru HE Project/About Project". CVPPL.
  2. "Chenab Valley Power Project Limited(CVPPL)/Company Overview". CVPPL.
  3. "Kiru Hydro Project delayed to Dec 2026, costs surge to Rs 5409 crore". Greater Kashmir. Retrieved 15 January 2026.
  4. "Kiru HE Project/About Project". CVPPL.
  5. "Khattar reviews Pakal Dul, Kiru, Kwar hydropower projects in Kishtwar dist". The Tribune (India). Retrieved 6 January 2026.
  6. "Kiru hydroelectric project moves closer to completion with major construction milestone". The Statesman (India). Retrieved 14 April 2026.