Trivia Trens
| Overview | |
|---|---|
| Main regions | São Paulo, Brazil |
| Fleet |
|
| Stations called at | 29 |
| Parent company | Grupo |
| Key people | Claudio Andrade (CEO) |
| Dates of operation | 2026–present |
| Predecessor | Companhia Paulista de Trens Metropolitanos |
| Technical | |
| Track gauge | 1,600 mm (5 ft 3 in) |
| Electrification | Overhead line, 3,000 V DC |
| Operating speed | 80 km/h (50 mph) |
| Other | |
| Website | www |
Trivia Trens is a company in Brazil belonging to Grupo Comporte, that has been responsible for the operation, maintenance and investments in lines 11-Coral, 12-Sapphire and 13-Jade through a public-private concession contract in partnership with the State Government of São Paulo.[1]
History
[edit]On 28 March 2025, Grupo Comporte won an international bidding for the concession of CPTM Lines 11, 12 and 13, named by the State Secretariat of Partnerships and Investments as "Lote Alto Tietê" (Allotment Higher Tietê). A ceremony was held on the headquarters of B3 in São Paulo, with the presence of governor Tarcísio de Freitas.[2]
The concession will last for a period of 25 years, with projected investments of R$ 14.3 billion (US$ 2.5 billion in 2025) by Trivia, besides R$ 10 billion (US$ 1.78 billion) of contributions from the State Government of São Paulo for the construction of 10 new stations, renovation of the existing 24 stations and the removal of all level crossings, replacing with alternative access routes.[3]
Operation
[edit]Trivia Trens assumed officially the commuter lines in July 2026, after a year of transition from state-owned company CPTM, to ensure the safety and effectiveness of the system.[4][5]
The rolling stock will be composed by 2500, 7000, 8000, 8500 and 9000 Series trains, acquired by CPTM, which will be transferred to the new operator during the concession period. A loan of 15 7000 Series trains will be made to Line 10-Turquoise in the proposed "Lote ABC-Guarulhos" plan (concession of Line 10 and construction of Line 14-Onyx), scheduled to be returned until 2031 and general overhaul made by CPTM.[6]
Line 11-Coral will operate with 8000 and 8500 Series trains (predominantly 8000 Series), Line 12-Sapphire with 7000, 8500 and 9000 Series (predominantly 8500 Series) and Line 13-Jade only with 2500 Series trains.[7]
Lines
[edit]| Line | Color | Termini | Length | Stations | Daily ridership (Apr 2019)[8] |
|---|---|---|---|---|---|
| Line 11 | Coral | Palmeiras-Barra Funda ↔ Estudantes | 54.1 km (33.6 mi) | 17 | 752,800 |
| Line 12 | Sapphire | Brás ↔ Calmon Viana | 38.8 km (24.1 mi) | 13 | 272,000 |
| Line 13 | Jade | Engenheiro Goulart ↔ Aeroporto-Guarulhos | 12.2 km (7.6 mi) | 3 | 13,300 |
Express services
[edit]| Line | Color | Termini | Length | Stations |
|---|---|---|---|---|
| Line 13 | Airport Express[9] | Palmeiras-Barra Funda ↔ Aeroporto-Guarulhos | 31.1 km (19.3 mi) | 5 |
Future developments
[edit]| Line | Color | Termini | Length | Stations |
|---|---|---|---|---|
| Line 11 | Coral | Penha | N/a | 1 |
| Line | Color | Termini | Length | Stations |
|---|---|---|---|---|
| Line 11 | Coral (Expansion) | Estudantes ↔ César de Sousa | 4.3 km (2.7 mi) | 1 |
| Coral | Bom Retiro | N/a | 1 | |
| Cerealista | N/a | 1 | ||
| Lajeado | N/a | 1 | ||
| Line 12 | Sapphire (Expansion) | Calmon Viana ↔ Suzano | 2.6 km (1.6 mi) | 1 |
| Sapphire | Gabriela Mistral | N/a | 1 | |
| Cangaíba | N/a | 1 | ||
| União de Vila Nova | N/a | 1 | ||
| Line 13 | Jade (Expansion) | Aeroporto-Guarulhos ↔ Bonsucesso | 10.5 km (6.5 mi) | 4 |
| Engenheiro Goulart ↔ Gabriela Mistral | 4.3 km (2.7 mi) | 2 |
See also
[edit]References
[edit]- ↑ "Grupo Comporte vence leilão de linhas da CPTM que atendem o Alto Tietê". G1 (in Brazilian Portuguese). 28 March 2025. Retrieved 20 July 2026.
- ↑ "Grupo Comporte, do fundador da Gol, vence leilão e assume linhas 11, 12 e 13 de trem por 25 anos em SP". G1 (in Brazilian Portuguese). 28 March 2025. Archived from the original on 14 March 2026. Retrieved 20 July 2026.
- ↑ Rodrigues, Rodrigo (31 March 2025). "Empresa vencedora do leilão das linhas 11, 12 e 13 da CPTM deve assinar contrato de concessão ainda no 1° semestre de 2025". G1 (in Brazilian Portuguese). Archived from the original on 23 July 2025. Retrieved 20 July 2026.
- ↑ Meier, Ricardo (21 May 2026). "Trivia Trens estreia hoje nas linhas 11-Coral, 12-Safira e 13-Jade em fase de transição operacional". Metrô CPTM (in Brazilian Portuguese). Retrieved 20 July 2026.
- ↑ Barone, Vanessa (20 July 2026). "Trivia Trens assumae linhas 11, 12 e 13 da CPTM nesta terça (21)". Veja São Paulo (in Brazilian Portuguese).
- ↑ Meier, Ricardo (21 October 2025). "Linha 10-Turquesa terá apenas novos trens dentro da concessão do Lote ABC Guarulhos". Metrô CPTM (in Brazilian Portuguese). Archived from the original on 21 October 2025. Retrieved 20 July 2026.
- ↑ Lobo, Renato (3 December 2024). "Volta do 8500 e saída do 2070: como ficará a frota das linhas 11, 12 e 13". Via Trólebus (in Brazilian Portuguese). Archived from the original on 10 March 2026. Retrieved 20 July 2026.
- ↑ "A Companhia". CPTM (in Brazilian Portuguese). 2019-10-15. Retrieved 2019-10-15.
- ↑ "CPTM oferece três diferentes opções para chegar ao Aeroporto de Guarulhos | CPTM". cptm.sp.gov.br. Retrieved 2020-05-21.
External links
[edit]- Official website (in Portuguese)