Good articleMidland Main Line upgrade has been listed as one of the Engineering and technology good articles under the good article criteria. If you can improve it further, please do so. If it no longer meets these criteria, you can reassess it.
Article milestones
DateProcessResult
August 5, 2024Good article nomineeListed
Did You Know
A fact from this article appeared on Wikipedia's Main Page in the "Did you know?" column on September 23, 2024.
The text of the entry was: Did you know ... that although the electrification of the Midland Main Line was designated as a high priority in 1981, work to electrify the northern part of the line did not begin until more than 30 years later?

Untitled

[edit]

I propose a series of articles on various UK railway upgrades. This is one. Making a start GRALISTAIR (talk) 22:20, 19 February 2021 (UTC)Reply

Needs a complete rewrite

[edit]

This article needs a complete rewrite. It doesn't even mention things like when electric services started from Corby, and everything's confusingly ordered. Eldomtom2 (talk) 19:31, 27 May 2023 (UTC)Reply

Be bold. Get editing then GRALISTAIR (talk) 22:02, 28 May 2023 (UTC)Reply
I am flagging an issue for the benefit of other editors. My time to edit Wikipedia is limited.--Eldomtom2 (talk) 18:00, 1 June 2023 (UTC)Reply

GA Review

[edit]

The following discussion is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.


This review is transcluded from Talk:Midland Main Line upgrade/GA1. The edit link for this section can be used to add comments to the review.

Nominator: JuniperChill (talk · contribs) 12:56, 24 June 2024 (UTC)Reply

Reviewer: DimensionalFusion (talk · contribs) 10:44, 1 August 2024 (UTC)Reply

Rate Attribute Review Comment
1. Well-written:
1a. the prose is clear, concise, and understandable to an appropriately broad audience; spelling and grammar are correct. Lots of sentences need improvement.
  • Done
1b. it complies with the Manual of Style guidelines for lead sections, layout, words to watch, fiction, and list incorporation. LEAD: Article has all elements for the lead, provides an accessible overview and adequately describes what the project is, and its current phases. Article also appropriately includes contextual links early on, and lead is appropriately sized.

LAYOUT: Sections are appropriately ordered, no applicable specialised order. Images are appropriately sized. Article also uses emdash or endash where appropriate
WORDS TO WATCH: None used in the article.
FICTION: N/A
LISTS: Lists used thrice in article - once to list phases of the project, once as timeline, and once in further reading. Appropriate usage here.
However, Article does not have MOS:BOLDLEAD where it would be fairly easy to include, such as:

The Midland Main Line upgrade is a programme to upgrade the Midland Main Line, a major railway line in the United Kingdom.

This might, however, violate MOS:REDUNDANT.
2. Verifiable with no original research, as shown by a source spot-check:
2a. it contains a list of all references (sources of information), presented in accordance with the layout style guideline.
2b. reliable sources are cited inline. All content that could reasonably be challenged, except for plot summaries and that which summarizes cited content elsewhere in the article, must be cited no later than the end of the paragraph (or line if the content is not in prose). Following spot-check of 10/70 sources, sources are reliable.
2c. it contains no original research. All claims are cited inline
2d. it contains no copyright violations or plagiarism. Using the copyvio tool, result of 15.3%. Of which is just phrases and important info
3. Broad in its coverage:
3a. it addresses the main aspects of the topic. Addresses main aspects of the topic
3b. it stays focused on the topic without going into unnecessary detail (see summary style). Article occasionally goes into unnecessary detail Following further inspection, article goes into apporpriate amount of detail considering the article subject
4. Neutral: it represents viewpoints fairly and without editorial bias, giving due weight to each. Article does not express any specific point of view
5. Stable: it does not change significantly from day to day because of an ongoing edit war or content dispute. No edit warring on this page
6. Illustrated, if possible, by media such as images, video, or audio:
6a. media are tagged with their copyright statuses, and valid non-free use rationales are provided for non-free content. Images are tagged appropriately with copyright status, OGL and CC4.
6b. media are relevant to the topic, and have suitable captions. Image 1 may need replacing as it is from 2012 and it's for "by 2019" - which was 5 years ago. Is a more recent DfT image available? In other regards, Both images are relevant to the topic and placed in each section appropriately.
7. Overall assessment.

Discussion

[edit]
I looked into that too, but MOS:LEADCITE is pretty vague about whether or not to have citations in the lead.
Since that is an MOS, only a few are applicable to the GA criteria. MOS:LEADCITE is not one of them. If this was an FAC, then that would apply (since FAs have to comply with almost all the MOS). See also: WP:GANOTJuniperChill (talk) 19:27, 4 August 2024 (UTC)Reply
The discussion above is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.

Merge

[edit]

I have now merged in the article Wellingborough Aggregates Terminal. GRALISTAIR (talk) 19:10, 15 August 2024 (UTC)Reply

RS1

[edit]

is there any sourced information available as to why RS1 only reaches Wigston South, rather than Leicester Station or just north of there? Furthermore can the new trains switch from overhead supply to diesel power while moving or will the switch have to take place at Kettering or Market Harborough stops or an unadvertised and non-revenue producing stop to the south of Wigston North Junction? Spinney Hill (talk) 11:02, 23 September 2024 (UTC)Reply

Midland mainline traffic

[edit]

This line used to be the main artery for freight and especially coal traffic up to the late 70s. Once goods lines were ripped out and the mines closed this line over the years was treated just like a branch line. Whist other parts of the rail network were electrified only the London end of this line was deemed important enough to upgrade. 2001:8A0:7841:9C01:6CAB:39BD:33FB:AA30 (talk) 10:29, 9 November 2024 (UTC)Reply

Electric trains

[edit]

The electric wires are up and are switched on all the way from St Pancras to Wigston but the only electric trains on the line are those from St Pancras to Corby. There are none on the Main line north of Glendon Junction. The dual-system trains were expected to arrive early in 2025 but have not arrived. I have seen no information as to the reasons for this delay or to when we can expected to see them running. Can anyone assist and add this information and source to the article? . Spinney Hill (talk) 14:57, 8 July 2025 (UTC)Reply

Well, the article on British Rail Class 810 states TBA so it doesn't even specify a year. It also currently says following multiple delays, the fleet was planned to enter service in early 2025, but this did not happen. So this joins the new DLR trains and 701s. JuniperChill (talk) 15:34, 8 July 2025 (UTC)Reply