Pier 57
Pier 57 | |
| Location | 25 Eleventh Avenue, Manhattan, New York, US |
|---|---|
| Coordinates | 40°44′37″N 74°00′38″W / 40.74361°N 74.01056°W |
| Built | 1950–1954[1] |
| Architect | Emil Praeger |
| NRHP reference No. | 04000821 |
| NYSRHP No. | 06101.001535 |
| Significant dates | |
| Added to NRHP | August 11, 2004 |
| Designated NYSRHP | May 9, 2004[2] |
Pier 57 is a pier and building on the east bank of the Hudson River, along the West Side of Manhattan in New York City, New York, United States. Opened in 1954, it sits at the end of 15th Street on Eleventh Avenue (West Side Highway). Pier 57 was designed by Emil H. Praeger and constructed by engineering firm Madigan-Hyland. It includes a headhouse facing the street and a pier shed facing the river, which are arranged to form a two-story, T-shaped building. The pier is underpinned by three submerged, buoyant concrete caissons, which contain the building's basement. The first and second stories contain office space and a food court, and there is a roof garden above. The building is on the National Register of Historic Places.
The original Pier 57, built in 1907, was leased to the Grace Line before it burned down in 1947. Madigan-Hyland, which conducted engineering studies for a replacement pier, found that it was infeasible to reuse the original pier's pilings, so Praeger drew up plans for a floating pier. Construction on the replacement pier began on August 30, 1950, and the caissons were installed in 1952; the new pier was dedicated on March 5, 1954. Though the terminal formally opened in December 1954, it was not used by ships until early 1955. It was originally used by the Grace Line, which vacated the building and pier in 1967, after which the pier remained idle for several years.
From 1972 to 2003, Pier 57 housed the Hudson Pier Bus Depot for the New York City Transit Authority (NYCTA). It was then briefly used as a detention facility during the 2004 Republican National Convention. Cipriani S.A. and Steven C. Witkoff were selected to redevelop the pier as part of Hudson River Park in 2005, but their bid failed. Another developer, Young Woo & Associates (YWA), was selected in 2009 and initially proposed redeveloping the pier as a business incubator and retail space. YWA and RXR Realty began renovating the building with office space for Google, a food hall, a rooftop park, and entertainment venues. The pier reopened in stages between 2020 and 2023.
Site
[edit]Pier 57 is located on the east bank of the Hudson River, on 11th Avenue at 15th Street, along the West Side of Manhattan in New York City, New York, United States.[3][4] Adjacent to it are Little Island at Pier 55 to the south and Chelsea Piers to the north.[3][5] The Merchants Refrigerating Company Warehouse, an 11-story warehouse listed on the National Register of Historic Places,[6] is immediately across 11th Avenue.[5] Also nearby to the east and southeast are the High Line and Gansevoort Market.[5][7] The pier, part of a series of sequentially-numbered Hudson River piers, was originally adjoined by Pier 56 to the south and Pier 58 to the north.[1]
The pier is surrounded by a walkway on all sides, except for the north and south elevations of the headhouse at the pier's east end. The walkway on the east side of the building is part of Hudson River Park.[8] This walkway, measuring 14 or 15 feet (4.3 or 4.6 m) wide,[9][8] was originally a truck-loading apron.[9] Wooden pilings surround the pier, functioning as fenders,[9] and rubber buffers are also installed.[10] The pier is flanked by the Hudson River bulkhead wall, a granite-and-concrete structure extending north to 59th Street and south to Battery Park.[8]
Architecture
[edit]Pier 57 is the second pier of that name on the site, replacing a structure destroyed in 1947.[11] It was designed by Emil H. Praeger of the engineering firm Madigan-Hyland[11][12] and was constructed by Madigan-Hyland.[11][13] It extends 725 feet (221 m) westward into the river.[4][13] The superstructure of Pier 57 consists of a T-shaped building with two sections: the pier shed facing the water to the west, and the bulkhead shed (or headhouse) facing the street to the east.[13] The pier shed is 725 by 150 feet (221 m × 46 m) across and runs east–west, and the headhouse is 150 by 375 feet (46 m × 114 m) across and runs north–south.[13][14][a] Both sections have a concrete basement resting on the riverbed, along with two above-water levels.[8][16]
Exterior
[edit]Facade
[edit]The headhouse has a steel frame and a brick exterior.[8][16] The eastern elevation faces 11th Avenue and is divided into three vertical sections, all with door openings at the ground floor. At the central section are tall window openings, along with stainless-steel signage reading "MARINE & AVIATION" and "PIER 57". The outer sections of the eastern elevation have horizontal ribbons of windows.[11][16] The northern and southern elevations of the headhouse are blank and are clad with stucco or cement plaster; at the time of construction, they adjoined directly onto other buildings on the Hudson River.[17]

The pier shed is a two-story structure with a basement. Its longer north and south elevations are divided vertically into 32 bays.[8][16] Within these bays were originally 126 vertical-lift truck doors[18][9] on the first and second stories, along with steel sash windows.[8][16] The doors were each divided into four sections and operated manually by chains,[9] and had a total surface area of 45,360 square feet (4,214 m2).[18] Following a 2020s renovation, the bays were infilled with 25,000 square feet (2,300 m2) of steel-and-glass facade panels,[19] which slant inward at the top.[20] The bays are each topped with a line of continuous "burton" cargo-handling frames, which allowed freight to be easily transferred to and from ships docked at the pier.[8][21][22]
The pier shed's western elevation has a curved, Art Deco-style metal facade with similar stainless-steel signage to the headhouse.[8][16] The western elevation also had colored lights and a balcony where people could see departing passengers off.[18]
Roof
[edit]The roof was originally used as a heliport, parking lot, and cargo-transfer area,[16][8] which was used by vehicles and cargo awaiting shipment.[9][18] At the time of completion in 1954, the pier was the only one in New York City with a parking lot on the roof,[9][23] although the roof lot was not open for public use.[24] In 2022, a 2.5-acre (1.0 ha) public roof garden opened atop Pier 57,[25][26] accessible via stairs and elevators from the food hall inside.[27][28] The roof garden contains lawns and bleacher seats.[25][27] In addition to serving as a park, the rooftop space collects rainwater and reduces the urban heat island effect caused by nearby buildings.[29] The roof also has a performance venue for screenings of the Tribeca Festival.[26]
Interior
[edit]The entire interior is made of steel and concrete and, from the outset, had a sprinkler system to limit fire damage.[30] Pier 57 is variously cited as having 480,000 square feet (45,000 m2),[31] 560,000 square feet (52,000 m2),[32][33] or 633,000 square feet (58,800 m2) of space in total.[25][34] Each story has a 25-foot-high (7.6 m) ceiling.[32] The interior reopened in stages between 2020 and 2023, with a food hall, office space, entertainment venues, and educational facilities.[35]
Original configuration
[edit]Originally, the headhouse's first floor had offices to the east, facing the street,[16] in addition to 14 loading docks for trucks.[36][37] A stair ascended to the second floor, where there were offices and a hallway.[16] Another passenger-vehicle ramp led between the first and second floors,[9] for people wishing to bid farewell to passengers, avoiding the potential for congestion caused by idling cars.[38] A driveway allowed taxi drivers to drop off and pick up passengers in the headhouse's basement. There were also a baggage conveyor and escalator leading between the basement and first floor.[36][37][16]
The pier shed's interior was an open space with steel columns and concrete floors.[16] It also had offices, truck ramps, and freight elevators;[16][9] the truck ramps were the first to be installed at a pier in the Port of New York.[23] Large trucks were required to use the headhouse's loading docks, while smaller trucks could use the elevators and truck ramps inside.[9] Midway along the pier shed's length, two elevators connected each level.[36] On the second story was a passenger waiting room for the original tenant, Grace Line.[9][36] The pier shed also had a cafeteria for Grace Line employees, along with a large bathroom for dockworkers.[9] As designed, the basement contained storage warehouses,[18][30] along with utilities, a garage, pumps, and heating system.[14][36] Elevators throughout the building served the basement.[16]
Post-redevelopment
[edit]
Following the 2020s redevelopment, the building has contained a food hall, which was built with 15[39] or 17 stalls.[40] The food hall, spanning 16,000 square feet (1,500 m2), includes a culinary education and demonstration venue called Platform; both spaces are operated by James Beard Foundation.[41] At the west end of the pier shed is a black box theater known as Horizon Hall.[42][43] A second theater is located in the former passenger waiting room on the pier shed's second floor.[43] There is a 32,000-square-foot (3,000 m2) restaurant and performance space for City Winery,[44] which contains beams salvaged from the venue's previous location.[45] Next to the food hall is a 7,400-square-foot (690 m2) "living room" facing the southern elevation.[46] Also within Pier 57 is a double-height atrium called the Visitor Landing, with 54 skylights,[42] along with a series of interactive activities known as Discovery Tank.[47]
Google also occupies about 350,000 square feet (33,000 m2) of office space,[25] which includes lounges, a dining terrace, meeting spaces, and workspaces across three floors.[42][43] Google operates three environmental technology classrooms, which are leased out to nonprofit and neighborhood groups.[46] One of the former vehicular ramps is used as a incline elevator;[42] this makes Pier 57 one of two locations in New York City with incline elevators, along with the New York City Subway's 34th Street–Hudson Yards station.[48]
Caissons
[edit]The original pier had been supported by 3,000 pilings made of timber.[11][49][b] The pilings had not descended to bedrock and could not support the weight of the replacement pier. They could also not be removed because the resulting holes would have destabilized the silt in the riverbed.[11] The underlying bedrock is between 100 and 400 feet (30 and 122 m) below the riverbed, so it was also infeasible to drill a conventional pile down to bedrock.[52] The current pier is instead supported by three submerged buoyant concrete caissons[11][1] (also referred to as pontoons[53] or concrete boxes[54]). Before the caissons were built, the old pilings were severed above the level of the riverbed,[1][14] approximately 34 feet (10 m) beneath mean low water.[50][51] The tips of the pilings were covered with a layer of gravel.[1][21][51] The only pilings used in the current pier are the fenders around the caissons.[9]
The caissons are laid out in a T-shape, with the two caissons of equal dimensions laid out from west to east, and the third from north to south.[1][55] The two largest concrete caissons by volume are 360 feet (110 m) long, 82 feet (25 m) wide, and 33 feet (10 m) high and sit under the pier shed. The third, underneath the headhouse, is 375 feet (114 m) long, 82 feet (25 m) wide, and 25 feet (7.6 m) high.[11][1][21][c] Inside each caisson are interior girders measuring up to 3.5 feet (1.1 m) thick. The two larger caissons also have 3-inch-thick (7.6 cm) steel meshes embedded into their concrete foundations.[57] Each caisson's roof has massive girders measuring 150 by 2 by 9 feet (45.72 by 0.61 by 2.74 m) across, spaced every 20 feet (6.1 m), which support the first-floor deck above.[9] The caisson walls measure 2 feet (0.61 m) thick[57][58] and are attached to the riverbed using steel dowels that are spaced every 40 feet (12 m).[16] Each dowel measures 30 inches (760 mm) across and is driven into the riverbed.[16] The caissons' interiors accommodate all of the pier's subaquatic spaces, including storage areas, ramps, elevators, and driveways.[58]
The design principle is based on similar structures created as part of the American military effort in World War II, including temporary breakwaters that were used during the D-Day invasion in Normandy.[11][1] The caissons weigh up to 27,000 short tons (24,000 long tons; 24,000 t), but they float because they weigh less than the 47,000 short tons (43,000 t) of water that they displace.[59] They are capable of supporting weights of about 97,000 short tons (87,000 long tons; 88,000 t).[14][60] Their buoyancy supports 90% of the pier's weight,[d] while the riverbed supports the rest.[11][1][61]
History
[edit]The first Pier 57, built in 1907 for $1.2 million,[I][21][1][63] was made of wood and measured 1,000 feet (300 m) long.[64][65] It had what the Scientific American described as a "fireproof" metal shed, which measured 100 by 800 feet (30 by 244 m) across.[66] The original pier was part of the Chelsea Piers complex between piers 54 and 62, served by ocean liners.[67] Pier 57 was occupied by the French Line before being leased to the Grace Line in 1936.[68]
Development
[edit]1947 fire
[edit]On September 29, 1947, a six-alarm fire engulfed the pier, destroying both the pier itself and the cargo loaded there; at the time, no one was on the pier.[64][65][69] Originating in the structure's wooden support piles, the fire caused damage estimated at $5 million,[II][64][69] far more than what the pier's $2 million[III] insurance policy covered.[70] The conflagration was variously attributed to the use of creosote or another oil substance as coating for the pilings, or the accumulation of fuel in the wooden beams,[71] and may have been set accidentally by a passing tugboat dumping ashes into the river.[72] Over 200 firefighters were dispatched to the blaze, along with numerous fireboats including the John J. Harvey, and over a hundred firemen were injured.[63][73]
The fire lasted several days,[74] and only about 75 feet (23 m) of the original pier remained standing afterward.[65] While the fire was being extinguished, part of the pier structure collapsed on the firefighting boat William L. Strong.[75] Part of the facade collapsed onto the street on October 1, injuring multiple people,[1][76] including a marine surveyor who lost his leg and subsequently received the highest-ever personal-injury judgment returned by the Manhattan Supreme Court at the time.[77] A safe from the pier fell intact into the water, but its contents were later stolen.[72][78] Following the fire, the Grace Line was forced to relocate to Pier 45, then to Pier 56.[79] As a direct result of the fire, the city government devised ways to make the city's other piers more fire-resistant,[80] including the creation of fire-hose openings within the floors of existing piers.[81]
Design
[edit]
After the fire, the city government also began looking into rebuilding Pier 57,[80] and work on demolishing the old pier continued through 1948.[82][83] The city originally anticipated that the Grace Line would fund the total cost of reconstruction,[80] estimated at about $5 million.[II][84][83] In June 1948, the New York City Board of Estimate agreed to cancel Grace Line's lease on the old pier, provided the company pay a $1.72 million settlement for the new pier.[IV][85] This amount included $240,000 to clear debris from the site.[V][85] The city also allocated $1.36 million for the pier,[VI] and other sources would provide another $1.6 million.[VII][84] This was part of a wider-ranging initiative to reconstruct several piers in the Port of New York.[84][86]
Due to municipal staffing shortages, the city hired an outside firm, Madigan-Hyland, to conduct engineering studies for the new pier.[49] In August 1949, Madigan-Hyland was hired to design the pier for $175,000.[VIII][87] Madigan-Hyland calculated that the existing pilings could not be reused,[49] and one of its employees, Emil Praeger, drew up plans for a pier floated onto fireproof concrete caissons.[1][14][15] Gustave Birger Andreen, another engineer at Madigan-Hyland, helped draw up the specifications for the caissons.[88] The design changes increased the reconstruction cost to $5.7 million,[IX][49] though Marine and Aviation Commissioner G. Joseph Minetti said this was still less than what a rebuilt pier of conventional design would have cost.[15]
Plans for the floating pier, containing a T-shaped building with a bulkhead to the east and a pier shed to the west, were announced in January 1950.[14][60][15] As proposed, the pier was to include 175 parking spaces underground and 450 spots above,[14][15] along with a series of truck ramps.[53][60] A heliport was later added to the design;[89][90] Marine and Aviation Commissioner Edward F. Cavanagh Jr. said the roof was strong enough to accommodate helicopters of all sizes.[91] Cavanagh approved preliminary plans for the new pier in March 1950, allowing Madigan-Hyland to proceed with the final plans.[92][93] By then, the United States Army Corps of Engineers had also granted a permit for Pier 57's construction.[93]
Construction
[edit]
Construction began on August 30, 1950, after O'Brien Brothers Inc. and Quist Construction Company received a $528,000 contract[X] to cut off the tops of the existing pilings.[51][94] By November 1950, the city government was soliciting bids for the three concrete caissons.[95] The city received only two offers, both of which came more than a million dollars over the city's budget.[96] After several rounds of negotiations, in February 1951, the Board of Estimate approved a $5.6 million contract[XI] with a joint venture of Corbetta Construction Company and Merritt–Chapman & Scott.[97] The board also approved an additional $1.1 million appropriation to fund the contract,[XII][97] which the companies signed later that month.[98] In conjunction with Pier 57's development, the facades of existing piers 53 through 62 (dating from 1910) were also rebuilt to complement the new pier's design.[99]
Corbetta and Merritt–Chapman & Scott leased a lake at Grassy Point near Haverstraw, New York,[89][100] north of the city, in April 1951.[e][54] The lake had either 210 million US gallons (790×106 L)[52][54] or 350 million US gallons (1,300×106 L) of water and needed to be drained.[56] The contractors built a dike separating the lake from the river, drained the lake, flattened the bottom of the resulting pit, and built the caissons within the pit.[54][57] It took three weeks to drain the lake,[89] in part because fish were either stranded in the pit or clogged the drainage pipes; a sewage system also had to be installed to prevent the lake from refilling.[103] The caisson contractors built the caissons in assembly line fashion, installing two cranes to handle the delivery of steel and concrete. A steel yard was set up adjacent to the under-construction caissons.[57] Marine and Aviation engineer Raymond C. Wood, who had been overseeing the reconstruction of the Staten Island Ferry's Whitehall Terminal, was reassigned to oversee Pier 57's caissons in mid-1951.[104]
City officials viewed models of the new pier in late 1951,[89][105] and the caissons were nearing completion by June 1952.[106] The pit in Grassy Point was flooded beginning on July 17,[107] and the dike was torn out the next week, allowing tugboats to tow the caissons down the river.[108] Due to the difficulty of navigating the caissons through the Hudson River's shallow waters, they were towed one at a time, at two-week intervals.[106] The first caisson was floated down starting on July 29, 1952,[52][109] and was set in place on August 5.[110][111] The process of installation involved floating the caissons into place at high tide, then locking the caissons to the riverbed using cables.[111] Work was delayed slightly after laborers went on strike to demand wage increases,[112] and the last caisson was not floated down until September 30.[101] The contractors then re-drained the pit so they could construct caissons for the Tappan Zee Bridge.[113]
Pier 57's pier shed and headhouse were built after the caissons had been towed into place.[100] Corbetta received a $3.9 million[XIII] contract in December 1952 to erect the pier shed and headhouse.[114] Slightly over a month later, the Board of Estimate voted in January 1953 to lease the new pier to the Grace Line for eight years at a cumulative $2 million.[115] A flash fire in one caisson that March, ignited by gasoline fumes, killed two workers and injured a third.[116][117] By July 1953, almost all substructure work on the caissons was complete, and the superstructure's construction was about to begin.[118][119] The city also solicited bids for the installation of utilities at Pier 57.[119] By then, it was one of two new city-operated piers under construction (out of nine that city officials proposed in 1950),[120] and Pier 57 accounted for nearly all of the $12.75 million[XIV] spent on these piers to date.[121] The superstructure's construction was delayed by five months due to steel delivery issues.[36] By January 1954, the superstructure was nearly complete;[36][37] interior work began the next month.[116]
1950s and 1960s: Maritime use
[edit]Opening and early years
[edit]
The pier was dedicated on March 5, 1954, at a ceremony attended by Cavanagh and Mayor Robert F. Wagner Jr.,[55][122] and the Concrete Industry Board held a luncheon in the center caisson that June to celebrate the caissons' completion.[58][123] The official opening was postponed while finishing touches were installed.[9] The pier officially opened on December 29, 1954, with a ceremony attended by Marine and Aviation commissioner Vincent O'Connor; Grace Line president Cassius C. Mallory; and Wagner.[18][124][125] O'Connor and Mallory inaugurated the heliport at the opening ceremony.[18][125] Final construction costs totaled $12 million,[XV][18][55][125] making Pier 57 the largest dock-building effort the New York City government had ever carried out.[11][53] The rooftop parking lot allowed the Grace Line to give up four existing parking lots in the area.[30]
The pier was originally supposed to begin receiving vessels in mid-January 1955,[125][126] as its electrical work was incomplete; in the meantime, the structure was used only for storage.[127] The opening was delayed several weeks because the International Longshoremen's Association (ILA) and the Grace Line could not agree on who to appoint as the pier's hiring agent.[128] The opening, rescheduled for March 7,[129] was delayed again when ILA-affiliated dockworkers briefly went on strike to protest the selection of hiring agent.[130] The terminal ultimately opened on March 8, 1955, when the liner Santa Barbara became the first vessel to dock there.[126][131] Even after Pier 57 opened, labor disputes continued over the Grace Line's decision to hire non-ILA members.[132]
The pier functioned as a terminal for shipping and storage of cargo.[22][133] However, increases in containerization and the concurrent Jet Age-era rise of commercial aviation had decreased the Hudson River piers' traditional passenger and freight business, to the extent that the historian Marc Levinson called Pier 57 "obsolete before it opened".[133] In September 1955, the television personality Arthur Godfrey landed a helicopter on Pier 57 as a stunt; he received a scroll commemorating him as the first person to land a helicopter at the West Side Airlines Terminal, over 1 mile (1.6 km) away.[134] The pier's presence prompted the Italian Line, which occupied Pier 56 to the south, to cancel its lease at that pier, citing the narrowness of the berth between the two piers.[135] Pier 57 was also initially not financially self-sustaining.[136] In November 1956, Grace Line officials rededicated Pier 57 as part of the Grace Line Terminal, which also included Pier 58 immediately to the north.[137] The pier had so much unused space that, in 1958, the Grace Line built a 34-by-16-by-1-foot (10.36 by 4.88 by 0.30 m) tank in the center caisson to test out model ships.[138]
Abandonment and reuse proposals
[edit]
By the 1960s, the city government was considering proposals to redevelop the piers along the Hudson River.[139] All of the Grace Line Terminal's Central American and western South American services were relocated from the neighboring Pier 58 to the Port Newark–Elizabeth Marine Terminal in New Jersey in December 1966. At the time, the Grace Line was still operating cargo services and Caribbean services from Pier 57.[140] The Grace Line ultimately sold its shipping business in 1967,[1] and by later that year, the company was out of Pier 57 as well, having relocated the pier's remaining passenger services to Pier 40.[141] By then, with the rise of containerization, shipping activity in the Port of New York was increasingly moving to New Jersey,[142] and there was little demand for a traditional freight pier such as Pier 57.[31][133]
The rock band Blue Cheer recorded an LP at the unused pier in 1968.[143] The next year, the production studio Feller Scenic Studio contemplated leasing Pier 57 for productions, but the city rejected the agreement, reportedly because of pressure from the ILA.[144] At the time, the ILA anticipated that the pier could still be reactivated for maritime use if needed.[144] In September 1970, as part of a cultural festival involving multiple abandoned piers, Mayor John Lindsay proposed converting Pier 57 into a temporary theater.[145] The ILA picketed the festival,[146] as did neighborhood residents;[147] Lindsay eventually moved the festival to Central Park.[148] By then, Manhattan's meatpacking industry was considering converting the unused pier into a refrigeration facility for meats from Oceania.[147]
1970s to early 2000s: Bus depot
[edit]
The Metropolitan Transportation Authority (MTA) was also interested in using Pier 57 as a bus depot by c. 1970,[142] and MTA subsidiary New York City Transit Authority (NYCTA) reached an agreement in December 1971 to lease the pier.[149] In response, ILA picketers blockaded the pier.[150][142] NYCTA workers with the Transport Workers Union, who refused to break a picket line, followed suit until both the New York Supreme Court and a mediator ruled that the NYCTA could use the pier.[149] Local residents protested the garage as well, citing environmental concerns,[150][142] and City Council President Sanford Garelik claimed the bus depot would endanger pedestrian safety and make it difficult to reuse the pier for maritime purposes.[151] The ILA unsuccessfully attempted to secure an alternate use for the pier, and in September 1972, the NYCTA took over, converting Pier 57 into the Hudson Pier Bus Depot.[152] As configured, the pier could fit 225 buses.[152][153] The NYCTA promised to vacate the pier if a maritime tenant was found,[152] and as such, it operated the pier under a series of short-term leases.[150][154][155]
Though the NYCTA wanted to renovate Pier 57 to make it more suitable for bus storage,[150] the Board of Estimate vetoed a $2.6 million appropriation intended for that purpose in late 1972.[XVI][153] Manhattan borough president Percy Sutton claimed that the NYCTA was trying to obtain a permanent agreement for Pier 57 by not giving up the site of the Amsterdam Depot in Manhattanville, where a hospital had been proposed.[154] By the late 1970s, the pier was proposed for demolition or abandonment as part of the Westway highway project, which would have cut through the pier's site.[156][157] As part of Westway, a replacement bus depot would have been constructed elsewhere in Manhattan,[156] funded by the federal government.[158] By 1982, the MTA was considering the new bus depot on 11th Avenue above the West Side Yard.[157] Westway was ultimately canceled in 1985.[159] Pier 57 and its neighbors were severely dilapidated during the 1980s, and the adjacent piers sat empty.[67] The pier lacked sufficient storage space for buses,[160] and it was still occupied under a short-term lease.[155]
The MTA contemplated replacing the Pier 57 depot in 1987 with a floating bus depot, which would have been supported by several pontoons and cost $50 million.[XVII][155][160] By then, vandals frequently threw materials and equipment from Pier 57 in the water.[161] In the 1990s and early 2000s, there were proposals to move Midtown Manhattan's flower district (centered on Sixth Avenue and 28th Street) to Pier 57.[162] Ultimately Pier 57 continued to house a bus depot until 2003,[1][163] at which point the MTA was legally obligated to find a new bus depot.[164] The final buses were relocated on September 7, 2003.[163][165] Pier 57 had remained little-changed since the 1970s, even while neighboring piers had been redeveloped.[163] Asbestos and other unsafe conditions remained in the pier,[165][166] and some of the building's windows had been boarded up.[167]
Mid- and late 2000s
[edit]When the bus depot closed, the adjacent Hudson River Park was being created on the waterfront.[32][168][169] The park's operator, the Hudson River Park Trust (HRPT), had been selected to redevelop the pier.[163] The redevelopment of Pier 57 and nearby Pier 40 were intended to produce income for Hudson River Park,[169][170] which received no city or state funds.[171] Income from the two piers and the Chelsea Piers sports complex was to pay for expansions and other expenses.[171][172][173] Pier 57 sat between the neighborhoods of Chelsea and Greenwich Village, so the trust saw Pier 57's redevelopment as a major part of its plan.[174] The Hudson River Park Act, the 1998 legislation that had established the park, initially limited what types of commercial development could take place at Pier 57,[172][175] and the trust did not allow most commercial uses or any residential or hotel space within its parkland.[173]
2004 RNC detention center
[edit]
In June 2004, the Port Authority Police Department (PAPD) requested permission to make "relatively minimal modifications" to use Pier 57 as a makeshift detention and processing center for the 2004 Republican National Convention (RNC). The HRPT approved the PAPD's request the next month.[165] Chain-link fences, toilets, and benches were added to accommodate the detention center,[176] and 10-by-20-foot (3.0 by 6.1 m) pens were set up to fit tens of detainees at once.[177] Oil and chemicals remained on the floor,[165][178] but testing found no evidence of airborne asbestos particles.[166]
Over 1,800 were arrested during the RNC, which ran from August 30 to September 2, 2004.[177][179] Many detainees complained of inhumane conditions, giving rise to the nickname "Guantanamo on the Hudson".[176][165] The pens were so small that people had to take turns resting.[167][179] Detainees were made to sleep on the floor, where dozens of them contracted rashes.[166][167][176] Many detainees reported receiving little food or water while waiting to be processed,[167][176] and in some cases, detainees were held for more than 24 hours.[166][180] Lawyers also claimed that they were denied the chance to see their clients.[180] Lawsuits over the detention facility, including several against the HRPT, continued for years after the RNC;[165] most of these would eventually be settled in 2014.[177][181]
Initial bidding and Cipriani proposal
[edit]The Hudson River Park Trust opened a request for proposals (RFP) for Pier 57 in October 2003[163][182] and received eight bids, four of which were eliminated in May 2004.[183] Two additional bids from community groups were rejected that September due to insufficient funds, leaving two bids for the site.[184] One of the remaining proposals—submitted by Roland W. Betts, who owned the Chelsea Piers complex—called for tennis facilities, swimming, art galleries, and radio broadcast studio for WNYC. The other bid, submitted by the event-venue operator Cipriani S.A., and the developer Steven C. Witkoff, called for an Italian cultural center known as "Leonardo at Pier 57", with a rooftop park, event space, marina, and museum.[185][186] Supporters of each bid accused the other bid's promoters of bribery and nepotism.[186]
Cipriani and Witkoff won the bidding process in 2005.[187] Subsequently, an anonymous tip prompted the Manhattan District Attorney's office to investigate financial irregularities in Cipriani's bid.[188][189] The tipster also alleged that former HRPT and Manhattan Republican Party chairman James Ortenzio had used his influence to secure the bid for Cipriani.[190][191] Cipriani withdrew from the bid in 2006,[189][192] after the city government sought to interview Giuseppe Cipriani of Cipriani S.A. about the corruption allegations.[193] Several members of the Cipriani family and Ortenzio later pleaded guilty to allegations of tax and insurance fraud that arose from the investigation.[191] Witkoff initially intended to continue pursuing the redevelopment on his own,[192] but that effort also stalled.[194] Witkoff ultimately quit in early 2008, prompting the HRPT to restart the RFP process for Pier 57.[194][195]
2010s to present: Young Woo redevelopment
[edit]New plans and revisions
[edit]
The HRPT reopened the bidding process[170][196] and identified three finalist bids that November: those of Young Woo & Associates (YWA), the Durst Organization, and the Related Companies.[197] The next year, the HRPT selected YWA to redevelop the site.[198][199] YWA beat out the two other bidders, who were reluctant to work with the restrictions placed by the HRPT.[198] YWA initially proposed a shopping center at the pier,[175] and LOT-EK, Beyer Blinder Belle, and West 8 were hired to design the renovation.[200][201] Inside was to be 425,000 square feet (39,500 m2) of mixed event, retail, and office space,[202] including a business incubator housed in salvaged steel shipping containers.[174] The architects planned to add intermediate mezzanine levels, stairs, ramps, and a wooden escalator.[32] The Tribeca Film Festival (later Tribeca Festival) also leased the rooftop space for an entertainment venue.[203][202] The pier was also planned to include a marina and a water taxi dock.[202] The city government initiated the land-use approval process for Pier 57 in November 2011.[174][204] In the interim, the pier was used for several galas, fashion shows,[205] fundraisers,[206] and pop-up shops.[207]
The New York City Council approved YWA's plans in early 2013.[202][208] Shortly afterward, YWA commissioned the artist Josemaría de Churtichaga to create the artwork Magic Carpet, consisting of 36 containers hanging from the pier's ceiling, as a proof of concept for the redevelopment.[209] That September, the Pier 57 redevelopment was rebranded the SuperPier,[210][211] after an early nickname for the pier.[211] YWA's first three tenants were announced at that time.[210][212] By then, the redevelopment was planned to cost $200 million.[212][213] At that point, YWA planned to lease out about 430 shipping containers.[32][212] YWA also planned to lease out 20 larger office spaces measuring 3,000 to 20,000 square feet (280 to 1,860 m2) each, in addition to space on the roof and in the caissons.[212] In response, Tribeca Film Festival sued YWA for breach of contract regarding the rooftop space.[203] The plans to develop the SuperPier as a retail and incubator complex were ultimately unsuccessful,[175] and the Hudson River Park Act was amended to permit a greater range of commercial uses, including office space.[35][214]
YWA partnered with the developer RXR Realty in September 2014, announcing plans to convert part of the pier to offices.[215] Handel Architects, which was hired to draw up the new plans,[27][216] scrapped the original shipping-container proposal.[217] Google signed a letter of intent for 250,000 square feet (23,000 m2) at Pier 57 in May 2015,[33][218] and the TV chef Anthony Bourdain announced plans later that year for Bourdain Market, a food marketplace at Pier 57 with over 100 stalls.[219][219] That December, Google signed a lease to become Pier 57's primary tenant,[214][220][221] and Bourdain signed a letter of intent for the market.[222][223] The state government also approved the development, which by then was to have a rooftop park with a performance venue for the Tribeca Film Festival;[223] this rooftop park was to be designed by the landscape architecture firm !Melk.[216] By then, the project was scheduled to cost $350 million.[214][221] To finance the redevelopment, RXR obtained a $225 million loan in early 2016.[224]
Renovation and opening
[edit]Work on the pier's renovation began in May 2016.[225] Bourdain Market had still not finalized a lease,[226] prompting Bourdain to postpone the market's opening by two years to 2019.[227] The market had issues attracting vendors, some of whom had difficulties obtaining American work visas,[228] and YWA and RFR continued negotiating with other food market operators in the meantime.[229] RXR also considered relocating an ocean liner, such as SS United States, to be adjacent to the pier.[230] By early 2017, new glass panels were being added along the pier shed,[20] at which point the pier was scheduled to reopen the next year.[231] The structure topped out in June 2017.[232] Plans for Bourdain Market were scrapped that December, without Bourdain ever having signed a lease.[228][233] In February 2018, Google leased another 70,000 square feet (6,500 m2) of offices within the space that had been reserved for Bourdain Market.[234][235] Google also leased 50,000 square feet (4,600 m2) for public uses and agreed to open a ferry pier there, and the food market was reduced to 40,000 square feet (3,700 m2).[235] By that time, Pier 57 was expected to open in 2019.[234]
City Winery leased a 32,000-square-foot (3,000 m2) food and entertainment space at Pier 57 in April 2019,[44] and YWA and RXR received a $375 million loan that year to refinance the redevelopment.[236] City Winery's space at Pier 57 cost $20 million to renovate,[237] but its opening was delayed due to the onset of the COVID-19 pandemic in 2020.[238] The venue finally opened in October 2020, though due to social distancing measures, it initially imposed capacity restrictions[239] and sold COVID-19 rapid antigen tests to attract indoor diners.[240] Google's offices in the building were still incomplete during the early 2020s, even as the firm concurrently acquired and renovated St. John's Terminal farther south.[241] In January 2022, Google selected the James Beard Foundation to operate Pier 57's food marketplace,[242] reviving the Bourdain Market concept.[35][40] The Beard Foundation leased the food stalls to minority- and woman-owned businesses,[39][46] and it also created a culinary demonstration venue, Platform, within the food hall.[41]
The cost of the renovation ultimately totaled $410 million.[25][27] Pier 57's rooftop park opened on April 18,[25][26][243] and the Google offices opened that month, with space for 450 employees.[34][243] At the time, Pier 57 was one of several properties occupied by Google's parent company Alphabet Inc. between 15th and 16th streets; the company also had space at Chelsea Market and 111 Eighth Avenue immediately to the east.[33][244] The food market, Market 57, opened on April 1, 2023,[46][245] and in the months after the market opened, pedestrian traffic into Hudson River Park more than doubled.[246] City Winery leased additional space at Pier 57 in 2024,[247] opening two restaurants there the next year.[248]
Reception and legacy
[edit]The caissons were dubbed "Cheeseboxes" during construction.[61] The pier itself, branded as "The World's Most Modern Pier"[55] and the "Superpier",[21][211] was hailed as an innovative structure, being fireproof, extremely durable and immune to many of the problems that had historically plagued wooden waterfront construction.[1][21] The New York Times dubbed the structure "a place where concrete floats",[3] and the New York Herald Tribune called it "one of the world's outstanding ship terminals" in 1954.[30] The Herald Tribune proclaimed that the pier "had many firsts to its credit", including its roof parking lot and its steel-and-concrete frame.[30] Pier 57 was also one of New York City's first buildings to use prestressed concrete.[249]
By the 2010s, The Wall Street Journal wrote that the pier had "had an unglamorous past" but that its development was helping revive the Hudson River waterfront.[214] The New York Times wrote of the structural engineering in 2017: "The pier was dedicated in 1954. It is still without equal."[59] After the pier's 2020s redevelopment, one observer for Curbed wrote that the rooftop park was extremely difficult to find and that, unlike the nearby High Line, the park did not lend itself easily to exploration.[27] The Financial Times dubbed the building as Google's "massive tech-campus on the water".[250]
While the pier was being built, the American Society of Civil Engineers named Praeger its "metropolitan engineer of the year" in 1953, in part because of Pier 57's design.[12][251] Praeger and Madigan-Hyland were awarded the Architectural League of New York's Gold Medal in Engineering for their caisson design in 1955.[252] In 2023, the New York Landmarks Conservancy awarded Handel Architects the Lucy G. Moses Preservation Award for its restoration work on the building.[253]
The structure was placed on the New York State and National Registers of Historic Places in 2004.[254][32] The designation was granted because of the unconventional caisson design, rather than the headhouse's Art Deco-inspired design features.[32] At the time, no other piers with floating caissons were believed to exist in the US.[32][59]
See also
[edit]References
[edit]Notes
[edit]Explanatory notes
[edit]- ↑ These are the figures given in National Park Service 2004, p. 3, and cited in a New York Times article from January 2, 1950.[14] A New York Herald Tribune article from that date gives conflicting dimensions of 700 by 125 feet (213 by 38 m) for the pier shed and 120 by 375 feet (37 by 114 m) for the headhouse.[15]
- ↑ Figures of 2,300[1][50][51] or 4,000 pilings have also been cited.[14]
- ↑ The caissons are variously cited as measuring 350 ft × 150 ft × 74 ft (107 m × 46 m × 23 m) across.[56]
- ↑ A 1954 article in New York Herald Tribune cites a different figure of 80% for the proportion of the pier's weight supported by the caissons.[9]
- ↑ Sources disagree on whether the lake was 30 miles (48 km),[54][11] 35 miles (56 km),[100][101] or 38 miles (61 km) north of the city; the distance varies based on whether it is calculated from Pier 57 itself or elsewhere in the city.[102]
Inflation figures
[edit]- ↑ Equivalent to $29.4 million in 2024[62]
- 1 2 Equivalent to $55 million in 2024[62]
- ↑ Equivalent to $22 million in 2024[62]
- ↑ Equivalent to $17.9 million in 2024[62]
- ↑ Equivalent to $2.6 million in 2024[62]
- ↑ Equivalent to $14.2 million in 2024[62]
- ↑ Equivalent to $16.6 million in 2024[62]
- ↑ Equivalent to $1.8 million in 2024[62]
- ↑ Equivalent to $59.4 million in 2024[62]
- ↑ Equivalent to $5.5 million in 2024[62]
- ↑ Equivalent to $54.1 million in 2024[62]
- ↑ Equivalent to $10.6 million in 2024[62]
- ↑ Equivalent to $36.9 million in 2024[62]
- ↑ Equivalent to $119 million in 2024[62]
- ↑ Equivalent to $11.1 million in 2024[62]
- ↑ Equivalent to $14.7 million in 2024[62]
- ↑ Equivalent to $118.1 million in 2024[62]
Citations
[edit]- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Doswell, John (September 24, 2003). "Pier 57's Construction Was an Engineering Marvel". The Villager. Archived from the original on November 29, 2009. Retrieved July 16, 2009.
- ↑ "Cultural Resource Information System (CRIS)". New York State Office of Parks, Recreation and Historic Preservation. November 7, 2014. Archived from the original on April 4, 2019. Retrieved July 20, 2023.
- 1 2 3 LaFarge, Annik (2024). On the High Line: The Definitive Guide. Fordham University Press. p. 1942. ISBN 978-1-5315-0612-4. Retrieved September 12, 2026.
- 1 2 Stern, Fishman & Tilove 2025, p. 237.
- 1 2 3 "NYCityMap". NYC.gov. New York City Department of Information Technology and Telecommunications. Archived from the original on June 10, 2015. Retrieved March 20, 2020.
- ↑ Pier 57 EIS 2013, pp. 7.4, 7.5.
- ↑ Pier 57 EIS 2013, p. 7.5.
- 1 2 3 4 5 6 7 8 9 10 Pier 57 EIS 2013, p. 7.4.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Hamshar, Walter (November 11, 1954). "New $12 Million Pier To Be Completed Dec. 1". New York Herald Tribune. p. 13. ISSN 1941-0646. ProQuest 1318576857.
- ↑ Horne, George (January 15, 1954). "City Eyes New Type of Ferry Slip Using Rubber and Steel Bumpers; Concrete Stanchions, a Part of Cavanagh Theory, Would Replace Wood Pilings at Terminals on Staten Island Run". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 3 4 5 6 7 8 9 10 11 12 Pier 57 EIS 2013, p. 7.3.
- 1 2 "Capt Praeger is Honored". U.S. Navy Civil Engineer Corps Bulletin. Bureau of Yards and Docks, Navy Department. 1953. p. 23. Retrieved September 12, 2026.
- 1 2 3 4 National Park Service 2004, p. 3.
- 1 2 3 4 5 6 7 8 9 Horns, George (January 2, 1950). "New $5,000,000 Pier, First of Its Type, Is Planned by City; Proposed Pier Which Will Be a Sharp Departure From Present Type". The New York Times. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 3 4 5 Braynard, Frank O. (January 2, 1950). "175 Cars to Park Under New Pier City Will Build at West 15th St". New York Herald Tribune. p. 1. ISSN 1941-0646. ProQuest 1327161072.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 National Park Service 2004, p. 4.
- ↑ Pier 57 EIS 2013, pp. 7.3, 7.4.
- 1 2 3 4 5 6 7 8 Perfall, Art (December 29, 1954). "'Most Modern Pier' Open for Business". Newsday. p. 26. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "Facade Design Engineering & Fabrication". Neme Design Studio. Retrieved September 13, 2026.
- 1 2 Cohen, Michelle (January 24, 2017). "Glass and progress arrive at Pier 57 Google NYC expansion". 6sqft. Retrieved September 15, 2026.
- 1 2 3 4 5 6 ""Superpier" Almost Floats". Popular Mechanics: 114–115. February 1952. Archived from the original on April 21, 2023. Retrieved September 10, 2016.
- 1 2 "Once-Neglected Pier 57 Prepares for Its SuperPier Moment". Curbed. January 17, 2014. Archived from the original on May 30, 2016. Retrieved August 4, 2014.
- 1 2 "Mayor Will Open New Pier Tuesday; 1,200 Are Expected to Attend Ceremony at 15th St. Dock Leased by Grace Line". The New York Times. December 26, 1954. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Pier and Parking Area Going Up at W. 23d St". New York Herald Tribune. November 30, 1955. p. 26. ISSN 1941-0646. ProQuest 1327247235.
- 1 2 3 4 5 6 Hickman, Matt (April 19, 2022). "New York City's largest rooftop park opens atop historic Pier 57 in Chelsea". The Architect's Newspaper. Retrieved August 20, 2024.
- 1 2 3 Rosendale, Gus (April 18, 2022). "NYC's Largest Rooftop Park Now Officially Open at Pier 57, Over the Hudson River". NBC New York. Retrieved September 17, 2026; Rahmanan, Anna (April 19, 2022). "A giant new public rooftop park just opened at Pier 57". Time Out. Retrieved September 17, 2026.
- 1 2 3 4 5 Hagberg, Eva (June 16, 2022). "How I Found the New Roof Park at Pier 57". Curbed. Retrieved September 17, 2026.
- ↑ Frishberg, Hannah (July 10, 2026). "Hit these free NYC rooftops for an eagle-eye view on a budget". Gothamist. Retrieved September 17, 2026.
- ↑ Beckstrom, Dani (August 16, 2024). "Green space on roof of Pier 57 in Manhattan helps combat urban heat island effect". ABC7 New York. Retrieved August 20, 2024.
- 1 2 3 4 5 Hamshar, Walter (December 26, 1954). "New Pier To Be Opened By Wagner on Tuesday". New York Herald Tribune. p. A1. ISSN 1941-0646. ProQuest 1318084627.
- 1 2 Strand, Oliver (October 21, 2016). "From the Archives: Anthony Bourdain on Authenticity, Expectations, and Opening the Country's Most Ambitious Food Hall". Vogue. Vol. 206, no. 11. ProQuest 1846495010. Retrieved September 17, 2026.
- 1 2 3 4 5 6 7 8 Stern, Fishman & Tilove 2025, p. 238.
- 1 2 3 Geiger, Daniel (May 18, 2015). "Google expands NY footprint with move to 'SuperPier': Search giant to anchor mixed-use project on Hudson". Crain's New York Business. Vol. 31, no. 20. p. 14. ProQuest 1682251174.
- 1 2 Elias, Jennifer (April 21, 2022). "Check out Google's new Hudson River campus in Manhattan, a magnet for New York talent". CNBC. Retrieved September 17, 2026.
- 1 2 3 Stern, Fishman & Tilove 2025, p. 239.
- 1 2 3 4 5 6 7 "Pier 57 Frame Nears Completion; Interior Work Is to Begin Feb. 15; $12,000,000 Structure at West 15th Street Is Slated for Use by Grace Line in 1955 – Special Ramp for Vehicles Set". The New York Times. January 6, 1954. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 3 "New Pier 57 Near Start of Interior Work". New York Daily News. January 31, 1954. p. 121. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Friedlander, Paul J. C. (September 19, 1954). "Delays at the Dock; U.S. and Ship Officials Are Still at Sea On Ways to Speed Passengers Ashore". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 Petre, Holly (February 3, 2023). "New York City's newest food hall features lineup focused on female, BIPOC vendors". Nation's Restaurant News. Retrieved September 17, 2026; Orlow, Emma (February 1, 2023). "A Food Hall Cherry-Picked by the James Beard Foundation Is Coming to Manhattan". Eater NY. Retrieved September 17, 2026.
- 1 2 Fabricant, Florence (February 8, 2022). "El Quijote in the Hotel Chelsea Reopens". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026.
- 1 2 Thorn, Bret (March 17, 2023). "James Beard Foundation to shift programming to a larger event space". Restaurant Hospitality. ProQuest 3126098235; "James Beard Foundation Announces Platform by The James Beard Foundation and Good to Go by JBF at Pier 57 in Partnership with Google and Jamestown". City Life Org. March 26, 2023. Retrieved September 17, 2026.
- 1 2 3 4 "Google's New York office: Iconic pier transformed through adaptive reuse". Construction Specifier. November 14, 2023. Retrieved September 14, 2026.
- 1 2 3 "Google Pier 57". DS+R. Retrieved September 14, 2026.
- 1 2 McGill, Lucas (May 2, 2019). "These were the top 10 NYC retail leases in April". The Real Deal. Retrieved September 17, 2026; Mims, Taylor (April 15, 2019). "New York's City Winery Announces Relocation to Pier 57 in Hudson River Park". Billboard. Retrieved September 17, 2026; Tuder, Stefanie (April 15, 2019). "City Winery Lands a Huge New Home on the Hudson River". Eater NY. Retrieved September 17, 2026.
- ↑ Hughes, C. J. (March 3, 2020). "With Disney, a Manhattan Neighborhood Reinvents Itself". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026.
- 1 2 3 4 Ginsburg, Aaron (March 31, 2023). "See the waterfront food hall opening at Hudson River Park's Pier 57". 6sqft. Retrieved September 17, 2026.
- ↑ Barron, James (March 28, 2025). "A Mostly Microscopic Sign of Spring". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026; Izzo, Christina (May 5, 2023). "Hudson River Park celebrates 25 years with 400-plus free events". Time Out. Retrieved September 17, 2026.
- ↑ Kadinsky, Sergey (February 8, 2026). "Fabulous Pier 57". Forgotten New York. Retrieved February 27, 2026.
- 1 2 3 4 "City to Build $445,000 Pier, To Fireproof 13: To Replace Grace Line Dock Burned in 1947". New York Herald Tribune. July 28, 1949. p. 24. ISSN 1941-0646. ProQuest 1327241924; "Cost of New Pier Increases $700,000; Replacement at West 15th St. Will Go Above the Original Estimate of $5,000,000". The New York Times. July 28, 1949. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 "Events of Interest in Shipping World; Work on the New $7,000,000 Pier 57 at West 15th Street Will Begin Tomorrow". The New York Times. August 28, 1950. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 3 4 Hamshar, Walter (August 30, 1950). "Dredge Begins Job of Building A New Pier 57: Cavanagh Speaks at Brief Ceremony; W ork to Take 2 Years, Cost 7 Million". New York Herald Tribune. p. 22. ISSN 1941-0646. ProQuest 1326051282.
- 1 2 3 National Park Service 2004, p. 7.
- 1 2 3 "City's New Pier at Haverstraw to Rest on Concrete Pontoons". Brooklyn Eagle. October 15, 1951. p. 10. Retrieved September 13, 2026 – via Newspapers.com.
- 1 2 3 4 5 "Pier 57 Caissons Will Be Built 30 Mi. Up River: 350-Ft. Concrete Boxes To Be Floated to Site for Base". New York Herald Tribune. April 23, 1951. p. 23. ISSN 1941-0646. ProQuest 1322424974; "Last Barrier Gone in New Pier's Path; Lease Arrangements Are Made for Site on Which to Build 3 Concrete Box Bases Below Mean Water Level". The New York Times. April 23, 1951. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 3 4 "Cold, Error Mar Pier Dedication: Few Stay to Brave Wind at City Ceremony-Name Is Misspelled on Plaque" (PDF). The New York Times. March 5, 1954. Archived from the original on August 27, 2023. Retrieved September 10, 2016.
- 1 2 "Gotham to Build Pier in a New Way". Buffalo Courier Express. Associated Press. May 30, 1951. p. 52. Retrieved September 13, 2026 – via Newspapers.com.
- 1 2 3 4 "Work on Pier Substructure Well on Way". The Journal News. February 2, 1952. pp. 1, 3. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 3 "150 Eat Luncheon in Sub-Hudson Box; Concrete Industry Meeting Is Held in Chamber at Base of New Pier 57". The New York Times. June 11, 1954. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 3 Dunlap, David W. (August 8, 2016). "Pier 57 Goes Down in History as a Place Where Concrete Floats". The New York Times. ISSN 0362-4331. Retrieved September 12, 2026.
- 1 2 3 "Fireproof Pier to Get Concrete-Float Base". New York Daily News. January 2, 1950. p. 370. Retrieved September 13, 2026 – via Newspapers.com.
- 1 2 "First of 360-Foot Pier 'Cheeseboxes' Floated As Skeptical Residents of Haverstraw Gawk" (PDF). The New York Times. July 22, 1952. Archived from the original on August 27, 2023. Retrieved September 10, 2016.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
- 1 2 "Big Pier Burns On; 140 Firemen Hurt" (PDF). The New York Times. September 30, 1947. Archived from the original on August 27, 2023. Retrieved September 10, 2016.
- 1 2 3 "5 Million Fire Wrecks Pier On Hudson: Grace Line Dock at 15th Street Burns; Borough Alarm Is Turned 0 In 6 Firehoats Called, 24 Firemen Injured 800 Bales of Cotton Lost; Flames Spurt Through Roof; No Ship at Pier". New York Herald Tribune. September 29, 1947. p. 1. ISSN 1941-0646. ProQuest 1326960317.
- 1 2 3 "Pier 57 Destroyed In New York Fire". The Christian Science Monitor. September 29, 1947. p. 10. ISSN 0882-7729. ProQuest 516066418.
- ↑ "Harbor and Dock Improvements". Scientific American. Vol. xcix, no. 28. December 5, 1908. p. 408. ProQuest 126808406.
- 1 2 Miller, William H. (October 11, 1980). "At Chelsea Docks, Memories Float At Anchor". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Shipping News and Detailed Marine Intelligence Reports From All Parts of the World: Grace Line Gets Second Pier on Hudson River Lease of No. 57 From City to Bring All Company Vessels to One Waterfront". New York Herald Tribune. July 8, 1936. p. 24. ISSN 1941-0646. ProQuest 1237478572; "New North River Pier Leased by Grace Line; Ship Company Transfers Its Operating Base From the Brooklyn Dock". The New York Times. July 8, 1936. ISSN 0362-4331. Retrieved September 12, 2026.
- 1 2 "Hudson Pier Razed by $5,000,000 Fire; Grace Liner Saved; Flames Spread to Next Dock, Menace a Third as Loaded Ship Is Towed Away 19 Firemen Are Injured 80 Pieces of Apparatus, Six Boats Called on 8 Alarms – 400 Tons of Cargo Burn $5,000,000 Fire Razes Pier 57; Liner Is Saved, Highway Blocked". The New York Times. September 29, 1947. ISSN 0362-4331. Retrieved September 12, 2026.
- ↑ Hamshar, Walter (April 2, 1950). "Cavanagh: A Fire Buff on the Job: New Commissioner of Marine Safeguards the City's Piers". New York Herald Tribune. p. A8. ISSN 1941-0646. ProQuest 1325145545.
- ↑ "Pilings Not Creosoted: Engineer Reports on Protection of Pier Wrecked by Fire" (PDF). The New York Times. October 4, 1947. Archived from the original on August 27, 2023. Retrieved September 10, 2016.
- 1 2 "Safe, in River Since Pier Fire, Is Found With $15,000 Gone". New York Herald Tribune. October 23, 1948. p. 11. ISSN 1941-0646. ProQuest 1336491844.
- ↑ National Park Service 2004, p. 6.
- ↑ Arm, Walter (September 30, 1947). "Pier Still Afire, Falls in Hudson; Facade May Topple on Highway: 5 Million Blaze, Most Costly in Waterfront History, Razes Grace Line Dock at 15th St.; 141 Firemen Hurt in Land and Water Battle Against Flames The Most Costly Pier Fire in New York City's History". New York Herald Tribune. p. 1. ISSN 1941-0646. ProQuest 1318083627; "End of Pier Fire Today Predicted: Facade of Ruined Structure to Be Razed-City Has Plas for Rebuilding" (PDF). The New York Times. October 1, 1947. Archived from the original on August 27, 2023. Retrieved September 10, 2016.
- ↑ Reycraft, Jack (January 13, 1948). "Fireboat William L. Strong, to Be 50 This Spring, Has Had Many Narrow Escapes Battling Blazes". Staten Island Advance. p. 18. Retrieved September 13, 2026 – via Newspapers.com.
- ↑ "Facade Topples In Fire Ruins of Pier, 3 Injured: Sixty-Foot Wall Collapses at Dock of Grace Line; Firemen Warned in Time". New York Herald Tribune. October 2, 1947. p. 4. ISSN 1941-0646. ProQuest 1318262250.
- ↑ "Lost Leg in Wall Collapse, Wins $230,000 Judgment". New York Herald Tribune. May 18, 1954. p. 12. ISSN 1941-0646. ProQuest 1318404111; "LI Village Trustee Wins 230 Gs in Record Court Damage Award". Newsday. May 18, 1954. p. 4. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "Safe Found in River; $15,000 Cash Missing". The New York Times. October 23, 1948. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ "Grace Line Sailing Put Off by Strike: Walkout Poses Problem for Longshoremen's Union". New York Herald Tribune. March 23, 1951. p. 21. ISSN 1941-0646. ProQuest 1322422690.
- 1 2 3 "New York Seeks Ways to Improve Its Piers; Recent Fire Stirs Interest in Plans for More Efficient, Safer Structures". The New York Times. October 12, 1947. ISSN 0362-4331. Retrieved September 12, 2026.
- ↑ "City Shows New Attack on Pier Fires". Staten Island Advance. September 21, 1950. p. 2. Retrieved September 13, 2026 – via Newspapers.com.
- ↑ Horne, George (December 23, 1948). "City Set to Start Pier Improvement; Ambitious Program Will Get Under Way Immediately Under $10,400,000 Outlay". The New York Times. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 "Fire Protection Plan for City Piers Is Ready: Marine and Aviation Dept. Schedules Other Work Under the New Budget". New York Herald Tribune. December 23, 1948. p. 22. ISSN 1941-0646. ProQuest 1335366117.
- 1 2 3 Potter, Robert W. (July 13, 1948). "City Gets Pier Plan to Cost $58,268,000; 10-Year Waterfront Program Is Part of Larger One Given to Mayor by Minetti". The New York Times. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 "Estimate Board Paves Way for A New Pier 57: Approves Cancellation o Grace Line Louse Upon Payment of $1,720,000". New York Herald Tribune. June 18, 1948. p. 40. ISSN 1941-0646. ProQuest 1336422478; "Shipping News and Notes; Capt. Granville Conway Gets 2 Decorations From Foreign Governments". The New York Times. June 18, 1948. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ "City Weighs Own Plan for Modernizing Port". Brooklyn Eagle. July 13, 1948. p. 3. Retrieved September 13, 2026 – via Newspapers.com.
- ↑ "Shipping News and Notes; City Awards Contract for New Pier 57, First Major Step in $58,000,000 Rehabilitation". The New York Times. August 12, 1949. ISSN 0362-4331. Retrieved September 13, 2026; "Hall Attacks Cassidy on Engineers". Staten Island Advance. August 16, 1949. pp. 11, 15. Retrieved September 13, 2026 – via Newspapers.com.
- ↑ "G. B. Andreen, Civil Engineer, Is Dead at 73: Worked on Caisson Plans for New Pier 57, Designs for Tappan Zee Bridge". New York Herald Tribune. December 25, 1952. p. 14. ISSN 1941-0646. ProQuest 1322473031.
- 1 2 3 4 "City Officials View Work on Heliport Pier: Structure to Handle Ships and Bus-Size Helicopters at 15th St. and Hudson". New York Herald Tribune. October 17, 1951. p. 17. ISSN 1941-0646. ProQuest 1319893643.
- ↑ Kline, Art (November 26, 1951). "Aviation News". Staten Island Advance. p. 19. Retrieved September 13, 2026 – via Newspapers.com.
- ↑ Fulton, William (June 22, 1953). "Copter Travel Making Rapid Strides in N.Y.: 9 New Heliports Built Last Year". Chicago Tribune. p. B9. ISSN 1085-6706. ProQuest 178566323.
- ↑ "Preliminary Pier 57 Plans Approved by Cavanagh". New York Herald Tribune. March 31, 1950. p. 30. ISSN 1941-0646. ProQuest 1326047529.
- 1 2 "Shipping News and Notes; Preliminary Plans for New Pier Approved; Revolutionary Structure Designed". The New York Times. March 31, 1950. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ "Work on New Pier Gets Under Way; Starting Work on a New Pier in the North River". The New York Times. August 30, 1950. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ "City to Ask Bids In 2 Weeks for Work on Pier 57: Substructure Contract Includes 3 Caissons". New York Herald Tribune. November 4, 1950. p. 17. ISSN 1941-0646. ProQuest 1336769205; "City Hopes to Rush Pier Substructure; New Terminal to Rest on 3 Concrete Boxes, 80 Feet Wide, 360 Feet Long". The New York Times. November 4, 1950. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ "City Is Forced To Delay Plans For New Pier: Low Construction Bid Exceeds Appropriation". New York Herald Tribune. January 11, 1951. p. 26. ISSN 1941-0646. ProQuest 1318538044; "All Bids Too High for New City PieR; 2 Offers Made for Base Job on Hudson Structure—Low $1,700,000 Above Fund". The New York Times. January 11, 1951. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 "Estimate Board Acts to Begin Work on Pier 57: Votes $1,181,000 More, Approves Caisson Bid". New York Herald Tribune. February 9, 1951. p. 23. ISSN 1941-0646. ProQuest 1318411687; "$1,181,000 Added for New Pier 57; Board Appropriates Fund to Meet Reduced Low Bid for North River Replacement Change in Girder Plan To Get Site for Building Bases". The New York Times. February 9, 1951. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ "Signing Contract for Pier 57 Substructure". New York Herald Tribune. February 17, 1951. p. 15. ISSN 1941-0646. ProQuest 1327567591; "Events of Interest in Shipping World; E.C.A. Request for Removal of Reserve Fleet Tonnage Is Approved by Maritime Board". The New York Times. February 17, 1951. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ Hamshar, Walter (December 17, 1950). "8 Hudson Piers Will Get New Facades Soon: Fronts to Cost $214,000; Design To Be Modern". New York Herald Tribune. p. A8. ISSN 1941-0646. ProQuest 1346188380; "Piers on West Side to Get New Facing; Chelsea Structures Completed in 1910 to Have Simple Lines in Revised Facades". The New York Times. December 17, 1950. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 3 "Building New York's Mulberry Pier: The Substructure Under Construction Thirty-Five Miles From New York". The Sphere. Vol. 207, no. 2707. December 29, 1951. p. 522. ProQuest 1692995429.
- 1 2 "Last Huge Concrete Box Off to Pier 57 Tomorrow". New York Herald Tribune. September 30, 1952. p. 23. ISSN 1941-0646. ProQuest 1319920204; "Pontoons Awaited". New York Daily News. September 30, 1952. p. 3. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "Caisson Put in Place at Pier 57 on Hudson". The New York Times. August 5, 1952. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ Eisen, David (December 1, 1954). "Pier 57 Project at an End, so Tottenville's Ray Wood, Versatile City Engineer, Wonders What's Next Test". Staten Island Advance. p. 12. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Eisen, David (December 1, 1954). "Pier 57 Project at an End, so Tottenville's Ray Wood, Versatile City Engineer, Wonders What's Next Test". Staten Island Advance. p. 12. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "City Aides View Concrete Box Pier, Believed to Be First of Its Type; Three 28,000-Ton Shells, Being Built on Bed of Pumped-Out Lake, Are to Be Floated Down the Hudson in Spring". The New York Times. October 17, 1951. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 "First Casement Of New Pier 57 Ready in Month: Concrete Box To Be Floated 35 Miles Down Hudson". New York Herald Tribune. June 5, 1952. p. 33. ISSN 1941-0646. ProQuest 1319999049; "Base for Pier 57 Nears Completion; First of 3 Sections Built at Grassy Point to Be Floated Down the Hudson in July". The New York Times. June 5, 1952. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ Molleson, John (July 17, 1952). "Hudson Is Put To Work to Help Build New Pier: Will Float Huge Concrete Substructure Built 35 Miles North of 17th St A Strange 25,000-Ton Craft Ready to Sail Down the Hudson". New York Herald Tribune. p. 1. ISSN 1941-0646. ProQuest 1322257382; Farrell, William M. (July 17, 1952). "Water Turned on to Lift Pier Bases; Opening of Valve Spills Hudson Into Pit at Grassy Point for Floating 'Boxes' to City Trip Starts This Month Time Will Be Chosen When the Best Tide and Weather Conditions Prevail". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "3 Pier Boxes Ready for Down-river Tow". The New York Times. July 25, 1952. ISSN 0362-4331. Retrieved September 13, 2026.
- ↑ Molleson, John (July 30, 1952). "Tugs Pull Huge Concrete Bos Down Hudson: 13,000-Ton Base for Pier. Built in Clay Pit, Floats as Engineers Said It Would Bathtub Regatta – Wading Pool Sailors Race Their Craft". New York Herald Tribune. p. 17. ISSN 1941-0646. ProQuest 1322256908; "13,550-Ton Pier Box Starts Down River; 6 Tugs Inch Concrete Caisson Out of Pit Near Haverstraw for 38-Mile Trip to City Crowds Wave Bon Voyage Towing Boss Sees Harder Job With 2 Other Structures Weighing Twice as Much". The New York Times. July 30, 1952. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "13,550-Ton Box Floated Into Place for New Pier". New York Herald Tribune. August 5, 1952. p. 8. ISSN 1941-0646. ProQuest 1322454256; "Caisson Put in Place at Pier 57 on Hudson". The New York Times. August 5, 1952. ISSN 0362-4331. Retrieved September 13, 2026.
- 1 2 "Pier 57 Base Put in Place". The Reporter Dispatch. Associated Press. August 5, 1952. p. 6. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "Talks Fail to End Pier Strike". The New York Times. August 26, 1952. ISSN 0362-4331. Retrieved September 14, 2026; "Parley Today on Pier Stoppage". New York Daily News. August 21, 1952. p. 39. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Smith, Edward (August 29, 1953). "Tappan Zee Bridge 'Boxes' Ready at Grassy Point". The Journal News. pp. 1, 3. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Burns, Robert S. (December 17, 1952). "Contract Is Let At $3,900,000 On Pier 57 Job: Lowest Bidder to Build Superstructure in Hudson". New York Herald Tribune. p. 36. ISSN 1941-0646. ProQuest 1319918594.
- ↑ "City Gives Grace 8-Year Lease On New Pier 57: Charges $2,000,000; Line Also Rents Piers 58, 65". New York Herald Tribune. January 30, 1953. p. 20. ISSN 1941-0646. ProQuest 1322475288; "Industry Praises City Pier Rental; Estimate Board Approval of a Lease for Grace Line Seen as Scrapping Old Formula". The New York Times. February 1, 1953. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 National Park Service 2004, p. 8.
- ↑ "Two Suffocate In Freak Fire Under New Pier: Workmen Trapped When Spark Ignites Oil Slicks on Water; Third Injured Watching Rescue Operations in Freak Pier Fire". New York Herald Tribune. March 27, 1953. p. 9. ISSN 1941-0646. ProQuest 1322301381; "2 Men Die, 3d Hurt in Flash Pier Fire; Heroic Rescue Efforts by Two Fire Department Officers and Workman in Vain". The New York Times. March 27, 1953. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Heliport Studied for 15th St. Pier; $12,250,000 Structure Built on 3 Huge Cement Boxes Is Nearing Completion". The New York Times. July 28, 1953. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 "Last Pier 57 Contracts Authorized". New York Herald Tribune. July 28, 1953. p. 24. ISSN 1941-0646. ProQuest 1322339157.
- ↑ Littell, Blaine (February 22, 1953). "Why Is Port Losing Trade? Crime Not a Major Reason: Real Factors Are Rail Rates, Poor Piers, High Rent, Traffic". New York Herald Tribune. p. A5. ISSN 1941-0646. ProQuest 1313596830.
- ↑ Kihss, Peter (August 13, 1953). "Port Growth Here Far Behind Rivals; Survey Finds 42% Rise Over Pre-war Tonnage Outpaced by Atlantic-gulf Average Priorities Pose Problem Harbor Must Vie With Transit, Spans, Courts and Prisons for Capital Budget Share". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Dedicates New Pier". New York Daily News. March 5, 1954. p. 266. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "Three-Story Piers". Telegraph-Journal. July 14, 1954. p. 4. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "New Pier Opened". New York Daily News. December 29, 1954. p. 61. Retrieved September 14, 2026 – via Newspapers.com; "New Marine Terminal Is Opened, Replacing Pier That Burned in '47; Mayor Turns Over $12,000,000 City-Built Edifice at Hudson River and 15th St. to Grace Line – Use Next Month Set". The New York Times. December 29, 1954. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 3 4 "Pier Can Double as Heliport: Grace Line Gets Keys From City". New York Herald Tribune. December 29, 1954. p. 19. ISSN 1941-0646. ProQuest 1322574644.
- 1 2 Mulligan, Arthur (March 9, 1955). "ILA Walkout Over; Grace's Pier 57 Opens". New York Daily News. p. 261. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Hamshar, Walter (January 21, 1955). "Pact Sought On Pier 57 Hiring Boss: Union Meeting With Grace Line". New York Herald Tribune. p. 24. ISSN 1941-0646. ProQuest 1328066581.
- ↑ Hamshar, Walter (February 18, 1955). "Grace Line Pier Accord Seen Near: Solution Likely On Hiring Boss". New York Herald Tribune. p. 21. ISSN 1941-0646. ProQuest 1328092104; "Grace Line Nears a Settlement Of Labor Dispute Over Pier 57; Draft of Compromise Lets the Company and Union Choices Share Hiring Function at New Port Facility". The New York Times. February 18, 1955. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ Horne, George (March 3, 1955). "Grace Line Opening New Pier 57 On Monday Despite Union Row: $12,000,000 Dock, Finished in December, Kept Idle by Hiring-Boss Fight" (PDF). The New York Times. Archived from the original on August 27, 2023. Retrieved September 10, 2016.
- ↑ Hamshar, Walter (March 8, 1955). "Grace Pier 57 Still Shut, Dockers Refuse to Work". New York Herald Tribune. p. 29. ISSN 1941-0646. ProQuest 1328108494; "9 Weeks of Pier 'Harmony' End As 300 Strike Over Hiring Boss; I. L. A. Workers Ignore Peace Machinery in Contract—Dock Board Subpoenas Union Heads in 'Wildcat' Dispute". The New York Times. March 8, 1955. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ Hamshar, Walter (March 9, 1955). "Shaky Pier Truce Opens Terminal: New Pier 57's Gangs Work Ship". New York Herald Tribune. p. 29. ISSN 1941-0646. ProQuest 1328111004; "Grace Terminal Gets Workers As Dispute Over Hiring Is Ended; Regular and Extra Men Go to Piers 57 and 58 in Chelsea After Plea by Leaders of Union for Observance of Contract". The New York Times. March 9, 1955. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Court Restrains Striking Dockers; Grace Line Gets Injunction in Bid to End Stoppage on 2 Piers – 2 Vessels Idle". The New York Times. April 15, 1955. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 3 Levinson, Marc (Spring 2006). "Container Shipping and the Decline of New York, 1955–1975". Business History Review. Vol. 80, no. 1. p. 63. ProQuest 274369387.
- ↑ "Godfrey Finally Lands That Copter". New York Herald Tribune. September 21, 1955. p. A1. ISSN 1941-0646. ProQuest 1327057215; "Godfrey Does His Helicopter Stunt at Last". Chicago Daily Tribune. Associated Press. September 21, 1955. p. 65. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "Italian Line Cancels Its Lease Of Pier 56, Citing Narrow, Slip; Concern's Chief Says Liners Now Building Would Not Have Maneuvering Room-- New Terminal Farther North Wanted Forties Site Preferred Questions Left Open". The New York Times. January 27, 1956. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "O'Connor Denies City Will Get Too Little for Rent of New Pier; Assails Port Authority Charge That Line Will Underpay $458,770 a Year --Calls Project Self-Sustaining O'Connor Cites Principle Propaganda Effort Seen". The New York Times. September 20, 1957. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Grace Line Terminal Dedicated by O'Connor". New York Herald Tribune. November 15, 1956. p. A8. ISSN 1941-0646. ProQuest 1326858934; "Terminal Dedicated". New York Daily News. November 15, 1956. p. 93. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Hamshar, Walter (September 14, 1958). "Test Ship Models in Pier Tank: Scheme Is Used By Graee Line". New York Herald Tribune. p. 6C. ISSN 1941-0646. ProQuest 1323381640.
- ↑ Lewis, John (January 30, 1965). "Rebuilding Piers to Cost $1 Billion Over Fifty Years". New York Daily News. p. 12. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "Grace to Use Port Newark". The New York Times. December 19, 1966. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Longshore Leaders Discuss Declining Job Opportunities (Published 1967)". The New York Times. November 21, 1967. Retrieved September 14, 2026.
- 1 2 3 4 Phalon, Richard (April 7, 1972). "Groups Block Use Of Pier as Garage". The New York Times. p. 70. ISSN 0362-4331. ProQuest 119558661.
- ↑ "Classical Music: Cheer Covers Waterfront". The Billboard. Vol. 80, no. 21. May 25, 1968. p. 43. ProQuest 1286308821.
- 1 2 Morrison, Hobe (September 3, 1969). "Legitimate: Nix Pier for N.Y. Show Biz". Variety. Vol. 256, no. 3. pp. 63, 66. ProQuest 1014853791.
- ↑ Kushner, Trucia D. (September 3, 1970). "The Features: Fun City To Get Revival With Party Time On Piers". Women's Wear Daily. Vol. 121, no. 46. p. 16. ProQuest 1523580075; Gent, George (September 3, 1970). "City Plans to Use Piers as a Cultural Playground". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ Bamberger, Werner (September 4, 1970). "4 Piers Picketed by Dock Workers". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026; Lieberman, Mark (September 4, 1970). "Pickets Halt Pier Project". New York Daily News. p. 254. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 Hanrahan, Michael (September 27, 1970). "Pier Festival Plan Downgrades City as a Port, Says Sutton". New York Daily News. pp. M1, M6. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Burks, Edward C. (September 26, 1970). "Mayor, Scoring I. L. A. Pickets, Moves Pier Fete to Central Park". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 Prial, Frank J. (September 10, 1972). "Bus-Garage Plan Still Weighed". The New York Times. p. 76. ISSN 0362-4331. ProQuest 119390764.
- 1 2 3 4 Nichols, Mary Perot (May 25, 1972). "Bus depot on Pier 57 opposed". The Village Voice. Retrieved March 29, 2016.
- ↑ "Garelik Raps Pier 57 Plan". New York Daily News. May 7, 1972. p. 102. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 3 Bamberger, Werner (September 12, 1972). "Ship Traffic Last Month Was Up Over Year Ago". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 Lieberman, Mark (October 13, 1972). "City Rejects Taxi Testing for L.I. City". New York Daily News. p. 179. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 Swertlow, Eleanor (April 23, 1974). "MTA Delays Hospital: Sutton". New York Daily News. p. 285. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 3 Anders, Marjorie (February 21, 1987). "Floating bus depot proposed in Hudson". The Reporter Dispatch. Associated Press. p. 8. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 Goldstein, Steve (April 23, 1978). "Westway: More than just a road". New York Daily News. p. 48. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 McKenna, Ken (January 15, 1982). "MTA board to vote on bus garage plan". New York Daily News. p. 98. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Roberts, Sam (June 5, 1984). "For Stalled Westway, a Time of Decision". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ Roberts, Sam (May 16, 2006). "After 20 Years of Delays, a River Park Takes Shape". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 Levine, Richard (February 21, 1987). "Floating Depot for Buses Is Proposed for Hudson". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026; Harney, James (February 21, 1987). "TA floats an idea". New York Daily News. p. 47. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Tyre, Peg (December 14, 1989). "Sweeper Swept With the Fishes". Newsday. p. 6. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ Pristin, Terry (November 1, 2000). "Flower District Considers a Repotting; Wholesale Market Feels Pressure As Neighborhood Is Transformed". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026; Reyes, Sonia (October 4, 1993). "Seeking new arrangement: Flower biz cultivates city accord". New York Daily News. p. 19. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 3 4 5 Chen, David W. (October 15, 2003). "Hoping for a Waterfront Makeover Just South of Chelsea Piers". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- ↑ "Special Report Commercial Real Estate: On the Waterfronts". Crain's New York Business. Vol. 19, no. 19. May 12, 2003. p. 25. ProQuest 219196874.
- 1 2 3 4 5 6 Lombardi, Chris (September 18, 2007). "'Guantanamo' suits vs. Hudson Park gain steam 3 years later". amNewYork. Retrieved September 14, 2026.
- 1 2 3 4 Rayman, Graham (September 17, 2004). "Convention Aftermath, Cops Say Test Showed Lockup Air Was Safe". Newsday. p. A.02. ISSN 2574-5298. ProQuest 279912141. Retrieved September 14, 2026 – via Newspapers.com.
- 1 2 3 4 Jurgensen, John (August 31, 2004). "Protesters' Rite of Passage: Lockup". Hartford Courant. p. 7. Retrieved September 15, 2026 – via Newspapers.com.
- ↑ Roberts, Sam (May 16, 2006). "After 20 Years of Delays, a River Park Takes Shape". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 Satow, Julie (June 18, 2007). "Cash crunch threatens Hudson River Park project". Crain's New York Business. Vol. 23, no. 25. p. 1. ProQuest 219182574.
- 1 2 Henderson, C W (August 14, 2008). "New Section of Hudson River Park Opens in Tribeca". Women's Health Weekly. pp. a388, a389, a390. ProQuest 2494149665.
- 1 2 Karni, Annie (June 3, 2013). "Advocates eye levy to save a park". Crain's New York Business. Vol. 29, no. 22. p. 1. ProQuest 1365216138.
- 1 2 De Avila, Joseph (April 19, 2012). "Struggling Trust Seeks Funds for Hudson Shore". The Wall Street Journal. ISSN 0099-9660. ProQuest 1002466504.
- 1 2 Brown, Eliot (October 21, 2008). "Ross, Durst In Battle For Pier 57 Development". Observer. Retrieved September 17, 2026.
- 1 2 3 De Avila, Joseph; Grant, Peter (November 24, 2011). "Hudson River Park Nears Key Phase". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026.
- 1 2 3 Fox, Tom (February 25, 2016). "Pier 57 project kept changing, without new bids". amNewYork. Retrieved September 16, 2026.
- 1 2 3 4 Healy, Patrick; Saulny, Susan (August 31, 2004). "The Republicans: the Convention in New York – Arrests; Demonstrators Held at Pier 57 Complain of Conditions and Long Waits". The New York Times. ISSN 0362-4331. Retrieved September 14, 2026.
- 1 2 3 Pilkington, Ed (January 15, 2014). "New York agrees $18m settlement with 2004 Republican convention protesters". The Guardian. Retrieved September 15, 2026.
- ↑ Dodd, Jody (Fall 2004). "WILPF at the DNC and the RNC". Peace and Freedom. Vol. 65, no. 3. p. 22. ProQuest 197457929.
- 1 2 "Infiltration, Mass Arrests Mark Policing Of Protests". City Limits. July 4, 2008. Retrieved September 15, 2026.
- 1 2 Purnick, Joyce (September 6, 2004). "A Setback for the City of Tolerance". The New York Times. ISSN 0362-4331. Retrieved September 15, 2026.
- ↑ Beekman, Daniel; Durkin, Erin (January 15, 2014). "City pays $18 million to settle lawsuits stemming from 2004 Republican National Convention at Madison Square Garden". New York Daily News. Retrieved September 15, 2026; "City To Pay $18 Million To Settle 'Wrongful' Arrests During 2004 RNC". CBS New York. January 15, 2014. Retrieved September 15, 2026; Draznin, Haley (January 16, 2014). "New York to pay $17.9 million to 2004 Republican Convention protesters". CNN. Retrieved September 15, 2026.
- ↑ "Hudson River pier may soon get facelift". The Ithaca Journal. October 16, 2003. p. 19. Retrieved September 15, 2026 – via Newspapers.com.
- ↑ Amateau, Albert (May 25, 2004). "Pier 57 Proposal List Trimmed to Four Options". amNewYork. Retrieved September 15, 2026.
- ↑ Amateau, Albert (September 28, 2004). "Pier 57 proposals bring different visions forward". amNewYork. Retrieved September 15, 2026.
- ↑ Amateau, Albert (September 24–30, 2004). "Trust Considers Two Plans for Pier 57". Downtown Express. Archived from the original on July 24, 2008. Retrieved July 16, 2009.
- 1 2 Bagli, Charles V. (February 5, 2005). "On the Waterfront, Dueling Developers". The New York Times. ISSN 0362-4331. Retrieved September 15, 2026.
- ↑ Bagli, Charles V. (April 7, 2005). "Cipriani Wins Bid for Italian Makeover of a West Side Pier". The New York Times. ISSN 0362-4331. Retrieved September 15, 2026.
- ↑ Anderson, Lincoln (January 2, 2007). "Pier 57 Process Is Barely Afloat Three Years Later". The Villager. Archived from the original on September 1, 2013. Retrieved August 14, 2014.
- 1 2 Gray, Geoffrey (June 9, 2006). "Did Restaurateur Giuseppe Cipriani Drop Pier Project to Dodge the Mob Question?". New York. Retrieved September 15, 2026.
- ↑ Hartocollis, Anemona (November 16, 2007). "Former Manhattan G.O.P. Leader Admits Tax Evasion". City Room. Retrieved September 15, 2026; "GOP fund-raiser pleads guilty for not reporting consult fees". New York Daily News. November 16, 2007. Retrieved September 15, 2026.
- 1 2 Anderson, Lincoln (November 30, 2007). "Former Trust chairperson pleads guilty to tax fraud". amNewYork. Retrieved September 15, 2026.
- 1 2 Marks, Andrew (October 16, 2006). "Waterfront projects get graded". Crain's New York Business. Vol. 22, no. 42. p. 25. ProQuest 219156480.
- ↑ Gray, Geoffrey (December 11, 2009). "A Timeline of the Cipriani Family's Troubles -- New York Magazine". New York. Retrieved September 15, 2026.
- 1 2 Brown, Eliot (February 5, 2008). "Tears for Piers! West Side Development Stalls". Observer. Retrieved September 15, 2026.
- ↑ "NYC Police Blotter, Scoopy's Notebook 200 NYC Scoop". amNewYork. January 22, 2008. Retrieved September 17, 2026.
- ↑ Timm, Jane C. (May 29, 2008). "Pier 57 to get new proposals". The Real Deal. Retrieved September 15, 2026.
- ↑ "Trust releases Pier 57 proposals". The Real Deal. November 20, 2008. Retrieved September 15, 2026; Brown, Eliot (November 20, 2008). "Related, Durst, YoungWoo Vie to Turn Pier 57 Into Vendor Wonderland". The New York Observer. Retrieved September 15, 2026; "Related, Durst, YoungWoo Vie to Turn Pier 57 Into Vendor Wonderland". NBC New York. November 20, 2008. Retrieved September 17, 2026.
- 1 2 Faynshteyn, Marianna (July 30, 2009). "And the Pier 57 Rights Go to ... Young Who?". Observer. Retrieved September 15, 2026.
- ↑ "Pier 57 / LOT-EK + Young Woo & Associates". ArchDaily. August 7, 2009. Archived from the original on March 25, 2016. Retrieved March 31, 2016.
- ↑ "Manhattan's Pier 57 to be transformed into $210 million cultural center". Building Design & Construction. Vol. 50, no. 9. September 2009. p. 9. ProQuest 210934070.
- ↑ Naidoo, Ridhika (August 18, 2009). "LOT EK, Beyer Blinder Belle, West 8 to Design Pier 57, New York". designboom. Retrieved September 17, 2026.
- 1 2 3 4 Stukane, Eileen (May 1, 2013). "Innovative Pier 57 Plan Approved". amNewYork. Retrieved September 17, 2026.
- 1 2 Gardner, Eriq (October 22, 2013). "Tribeca Film Festival Sues N.Y. Developer for $100 Million". The Hollywood Reporter. Retrieved September 16, 2026; "Tribeca film fest hits Young Woo with $100M SuperPier suit". The Real Deal. October 22, 2013. Retrieved September 16, 2026; Ross, Barbara; Brown, Stephen Rex (October 22, 2013). "Tribeca Film Festival sues developer over Pier 57 renovation". New York Daily News. Retrieved September 16, 2026.
- ↑ "Pier 57 plans enter land use approval process". The Real Deal. November 28, 2011. Retrieved September 17, 2026.
- ↑ See, for example: Grant, Drew (November 9, 2011). "Versace's H&M Show: A Prince, a Coppola, and a 'Gossip Girl' [Slideshow]". Observer. Retrieved September 17, 2026; Harrison, Lily (September 11, 2011). "The Making of the Helmut Lang Show". T Magazine. Retrieved September 17, 2026; Heyman, Marshall (October 7, 2011). "The Whitney Shifts the Party Downtown". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026.
- ↑ See, for example: Vilensky, Mike (October 3, 2013). "Hope for Hurting Hudson River Park". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026; Bratburd, Rebecca (May 16, 2013). "Friends Fete High Line Co-Founder". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026.
- ↑ Goldfield, Hannah (May 24, 2013). "New York Piers -- New York Magazine". New York. Retrieved September 17, 2026; "Retailers set up shop at Young Woo's Pier 57". The Real Deal. May 24, 2013. Retrieved September 17, 2026.
- ↑ Maggio, Vincenza Di (April 23, 2013). "Redevelopment of Manhattan's Pier 57 Moved Forward With City Council Approval". The Architect's Newspaper. Retrieved September 17, 2026; Hall, Christine (April 10, 2013). "NYC Council approves Pier 57 redevelopment". The Business Journals. Retrieved September 17, 2026.
- ↑ Heyman, Stephen (August 1, 2013). "A New York Pier With Shops in a Box". In Transit. Retrieved September 17, 2026; McCroy, Winnie (July 31, 2013). "From Holding Pen to Hot Spot: Pier 57 has Bustle, Before Construction Begins". amNewYork. Retrieved September 17, 2026.
- 1 2 Katz, Mathew (September 4, 2013). "Pier 57 Renamed 'SuperPier,' Will Have Rock-Climbing Wall". DNAinfo New York. Retrieved September 17, 2026; Wilson, Marianne (September 4, 2023). "NYC's new Pier 57 complex renamed SuperPier". Chain Store Age. Archived from the original on August 4, 2025. Retrieved September 17, 2026.
- 1 2 3 Carlson, Jen (September 4, 2013). "Photos: Pier 57 Was Dubbed "SuperPier" In 1952". Gothamist. Retrieved September 17, 2026.
- 1 2 3 4 Piore, Adam (December 1, 2013). "Young Woo and Associates – SuperPier NY". The Real Deal New York. Archived from the original on April 12, 2016. Retrieved March 31, 2016.
- ↑ Hughes, C. J. (December 11, 2013). "New Projects on the Horizon at Manhattan's Piers". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026.
- 1 2 3 4 Morris, Keiko (December 23, 2015). "Lease Deals Take Shape on Pier 57". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026.
- ↑ "RXR Realty enters joint venture to bring offices to Pier 57". The Real Deal. September 17, 2014. Retrieved September 16, 2026; Geiger, Daniel (September 16, 2014). "Pier 57 developer adds partner to build offices". Crain's New York Business. Retrieved September 16, 2026.
- 1 2 Hylton, Ondel (November 16, 2015). "New Renderings of SuperPier: Google's New NYC Digs + Bourdain Food Market To Arrive in 2018". 6sqft. Retrieved September 17, 2026.
- ↑ Stern, Fishman & Tilove 2025, pp. 238–239.
- ↑ "Google taking 250K sf at RXR and Youngwoo's Pier 57". The Real Deal. May 12, 2015. Retrieved September 15, 2026.
- 1 2 Fabricant, Florence (September 28, 2015). "Anthony Bourdain's Food Market Takes Shape". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026; "Revealed: Anthony Bourdain's vision for Pier 57". The Real Deal. September 29, 2015. Retrieved September 17, 2026.
- ↑ McShane, Larry (December 13, 2015). "Google to anchor $350M redevelopment of Manhattan's Pier 57". New York Daily News. Retrieved September 15, 2026; "Google officially inks 15-year lease deal for Pier 57". The Real Deal. December 26, 2015. Retrieved September 15, 2026.
- 1 2 Senison, Heather (December 23, 2015). "Google signs lease for Pier 57 at Hudson River Park". amNewYork. Retrieved September 17, 2026.
- ↑ Morabito, Greg (December 17, 2015). "Cuomo Gives an Enthusiastic Thumb's Up to Bourdain Market". Eater NY. Retrieved September 17, 2026; "No reservations: Cuomo backs Bourdain's global food hall". The Real Deal. December 16, 2015. Retrieved September 17, 2026.
- 1 2 "State Approves Redevelopment Plan for Pier 57 in Hudson River Park". Spectrum News NY1. December 13, 2015. Retrieved September 17, 2026; Rajamani, Maya (December 15, 2015). "Anthony Bourdain's International Food Market on Pier 57 Approved by Cuomo". DNAinfo New York. Retrieved September 17, 2026.
- ↑ Balbi, Danielle (March 29, 2016). "RXR Scooping Up $225M PNC Loan for Pier 57 Revamp". Commercial Observer. Retrieved September 17, 2026; "RXR Realty to take $225M loan for Pier 57: report". The Real Deal. March 30, 2016. Retrieved September 17, 2026.
- ↑ "Google Begins Construction Work to Revitalize Pier 57 at Hudson River Park". Spectrum News NY1. May 6, 2016. Retrieved September 17, 2026.
- ↑ Dai, Serena (July 21, 2016). "FYI: Bourdain Market Team Still Hasn't Signed a Lease at the SuperPier". Eater NY. Retrieved September 17, 2026.
- ↑ Passy, Charles (July 5, 2016). "The Feed: Bourdain World Market Delayed". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026; Rajamani, Maya (June 24, 2016). "Anthony Bourdain's Food Market Delays Pier 57 Opening By Two Years". DNAinfo New York. Retrieved September 17, 2026.
- 1 2 Dai, Serena (December 22, 2017). "Bourdain Market Plans Nixed at Pier 57". Eater NY. Archived from the original on December 9, 2018. Retrieved December 9, 2018; Repanich, Jeremy (January 1, 2018). "Anthony Bourdain's Food Hall Will Not Open in 2018 (And Probably Not Ever)". Robb Report. Retrieved September 17, 2026.
- ↑ Dai, Serena (March 30, 2017). "Bourdain Market CEO Steps Down From Highly Anticipated Project". Eater NY. Retrieved September 17, 2026.
- ↑ Bleyer, Bill (January 3, 2019). "Famed ocean liner SS United States eyed as Hudson River attraction". amNewYork. Retrieved September 17, 2026; Adelman, Jacob (December 12, 2018). "NYC developer with Manhattan pier project in deal to explore reviving SS United States". The Philadelphia Inquirer. Retrieved September 17, 2026.
- ↑ Warerkar, Tanay (March 13, 2017). "Pier 57's Renovation Is Moving Forward in Chelsea". Curbed NY. Archived from the original on October 19, 2018. Retrieved December 9, 2018.
- ↑ Schulz, Dana (May 1, 2017). "Google's Pier 57 Tops out Ahead of Summer 2018 Opening". 6sqft. Archived from the original on December 9, 2018. Retrieved December 9, 2018.
- ↑ Schulz, Dana (December 22, 2017). "Anthony Bourdain cancels plans for food market at Google's Pier 57". 6sqft. Retrieved September 17, 2026.
- 1 2 "Google upping its footprint at Pier 57". The Real Deal. February 9, 2018. Retrieved September 12, 2026; Gannon, Devin (February 9, 2018). "Google to expand footprint at Chelsea's Pier 57". 6sqft. Retrieved September 12, 2026; McCroy, Winnie (February 21, 2018). "Google Keeps Gobbling up Space in Chelsea; Takes More of Pier 57". The Villager Newspaper. Archived from the original on December 9, 2018. Retrieved December 9, 2018; Warerkar, Tanay (February 9, 2018). "New Look at Pier 57 as Google Takes over Former Bourdain Market Spaces". Curbed NY. Archived from the original on December 9, 2018. Retrieved December 9, 2018.
- 1 2 Geiger, Daniel (February 9, 2018). "On heels of megadeal, Google reaches agreement for major expansion on West Side pier". Crain's New York Business. Retrieved September 12, 2026.
- ↑ Sun, Kevin (May 8, 2019). "These were the 10 largest Manhattan loans in April". The Real Deal. Retrieved September 16, 2026; Cunningham, Cathy (April 12, 2019). "RXR Refinances Pier 57 With $375M Loan From Nuveen Real Estate". Commercial Observer. Retrieved September 16, 2026.
- ↑ Cooper, Laura (August 10, 2020). "Coronavirus Has Left New York City's Music Scene in Discord". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026.
- ↑ Passy, Charles (March 17, 2021). "New York Raises the Curtain for Live Events". The Wall Street Journal. ISSN 0099-9660. Retrieved September 17, 2026.
- ↑ Fabricant, Florence (October 20, 2020). "City Winery Opens in Hudson River Park". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026; Ong, Bao (October 13, 2020). "NYC's Largest Wine Bar Opens This Week on the Hudson River at Pier 57". Time Out New York. Archived from the original on October 16, 2020. Retrieved October 14, 2020.
- ↑ "NYC Restaurant to Require Customers to Take $50 Covid Test Before Indoor Dining". NBC New York. November 19, 2020. Retrieved September 17, 2026; Yakas, Ben (November 20, 2020). "City Winery Offering $50 Rapid COVID Tests In Attempt To Lure Indoor Diners". Gothamist. Retrieved September 17, 2026.
- ↑ Pozarycki, Robert (September 21, 2021). "Google spending $2.1 billion to buy St. John's Terminal in Hudson Square for new campus". amNewYork. Retrieved September 17, 2026.
- ↑ Adams, Erika (January 28, 2022). "A James Beard-Backed Food Hall Is Headed to Chelsea This Fall". Eater NY. Retrieved September 17, 2026; Ginsburg, Aaron (January 31, 2022). "New food hall at Pier 57 will be curated by the James Beard Foundation". 6sqft. Retrieved September 17, 2026.
- 1 2 "As Pier 57's rooftop park opens, anchor office tenant Google says it's ahead of its NYC hiring goals". New York Business Journal. April 19, 2022. Retrieved September 17, 2026; "Google opens new Pier 57 to employees, public". The Real Deal. April 23, 2022. Retrieved September 17, 2026.
- ↑ Noto, Anthony (May 22, 2019). "Google buys another Chelsea property, report says". The Business Journals. Retrieved September 12, 2026.
- ↑ Eisenpress, Cara (March 30, 2023). "Google Pier 57 waterfront public space and food hall to open April 1". Crain's New York Business. Retrieved April 17, 2026; Ginsburg, Aaron (March 31, 2023). "See the waterfront food hall opening at Hudson River Park's Pier 57". 6sqft. Retrieved April 17, 2026.
- ↑ Margolies, Jane; Vázquez, Lucía (September 19, 2023). "How Hudson River Park Helped Revitalize Manhattan's West Side". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026.
- ↑ "City Winery Inks 14K SF of Dining, Entertainment Leases at Pier 57". Connect CRE. April 29, 2024. Retrieved September 17, 2026; Nehring, Abigail (April 29, 2024). "City Winery Expanding by 14K-SF at Pier 57". Commercial Observer. Retrieved September 17, 2026.
- ↑ Fabricant, Florence (September 30, 2025). "OfCorsica! (Pun Intended) Is a Vacation That Became a Restaurant". The New York Times. ISSN 0362-4331. Retrieved September 17, 2026.
- ↑ Robbins, William (August 9, 1964). "Concrete Given Added Strength". The New York Times. p. R1. ISSN 0362-4331. ProQuest 115880571.
- ↑ Heathcote, Edwin (April 25, 2025). "Elizabeth Diller's High Line remade Manhattan. Now she's taking on the world". Financial Times. ProQuest 3207355207.
- ↑ "Boro Man Named to Receive First Engineers Award". Brooklyn Eagle. May 14, 1953. p. 6. Retrieved September 14, 2026 – via Newspapers.com; "Society Here Chooses 'Civil Engineer of Year'". The New York Times. May 13, 1953. ISSN 0362-4331. Retrieved September 14, 2026; "Engineer of Year to Get Award Next Week". New York Daily News. May 15, 1953. p. 83. Retrieved September 14, 2026 – via Newspapers.com.
- ↑ "The Record Reports: Meetings and Miscellany" (PDF). Architectural Record. 1955. p. 18. Archived (PDF) from the original on December 22, 2015. Retrieved December 16, 2015.
{{cite magazine}}: Cite magazine requires|magazine=(help) - ↑ "New York Landmarks Conservancy Announces 2023 Lucy G. Moses Award Winners – Mann Report". Mann Publications. March 17, 2023. Retrieved September 14, 2026.
- ↑ "AssetDetail". Archived from the original on March 8, 2016. Retrieved March 31, 2016.
Sources
[edit]- National Park Service (2004). Historic Structures Report: Pier 57 (PDF) (Report). National Register of Historic Places, National Park Service.
{{cite report}}: CS1 maint: ref duplicates default (link) - Pier 57 EIS (February 22, 2013). Pier 57 Redevelopment Project: Final Environmental Impact Statement (PDF) (Report). Hudson River Park Trust; Hudson Eagle, LLC; AKRF, Inc.; Sam Schwartz Engineering. Retrieved September 10, 2026.
{{cite report}}: CS1 maint: numeric names: authors list (link) CS1 maint: ref duplicates default (link)- "Chapter 7: Historic and Cultural Resources". Pier 57 Redevelopment Project: Final Environmental Impact Statement (PDF) (Report). Hudson River Park Trust; Hudson Eagle, LLC; AKRF, Inc.; Sam Schwartz Engineering. February 22, 2013. Archived from the original (PDF) on March 11, 2013. Retrieved September 10, 2016.
- Stern, Robert A. M.; Fishman, David; Tilove, Jacob (2025). New York 2020: Architecture and Urbanism at the Beginning of a New Century (2020 ed.). New York: Monacelli Press. pp. 237–239. ISBN 978-1-58093-694-1.
External links
[edit]- Chelsea, Manhattan
- Eleventh Avenue (Manhattan)
- Google buildings and structures
- Hudson River Park
- New York State Register of Historic Places in New York County
- Piers in New York City
- Piers on the National Register of Historic Places
- Transportation buildings and structures on the National Register of Historic Places in Manhattan
- West Side Highway