Draft:The Connecting Miami Project

From Wikipedia, the free encyclopedia


The Connecting Miami Project is a now $866 million project that will overhaul the 836/I-95/395 interchange.[1]

In July 2018, Archer Western – de Moya Group Joint Venture did a announcement announcing the connecting miami project, originally $802 million, The project would expand the I-95/SR 836/I-395 interchange, and also completely overhalling the entire I-395 highway.[2]

The main focus is the I-395 Signature Bridge that will have 6 arches peaking at 330 ft, and will span 1025 ft, will go over Biscayne Boulevard and NE 2 Ave, and have a park below of it.[3]

In 2023, The budget grew to $818 Million and in 2026 the budget is now $866 Million.[4]

References

[edit]
  1. "Connecting Miami". I-395/SR 836/I-95 Design Build Project. Retrieved 2026-07-25.
  2. I-395 Miami Project (2023-09-28). I-395/SR 836/I-95 DESIGN BUILD PROJECT, CONNECTING MIAMI. Retrieved 2026-07-25 via YouTube.{{cite AV media}}: CS1 maint: numeric names: authors list (link)
  3. "Project Video". I-395/SR 836/I-95 Design Build Project. Retrieved 2026-07-25.
  4. https://www.miamiherald.com/opinion/editorials/article315074605.html. {{cite web}}: Missing or empty |title= (help)