Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

Jump to content

Datong Bridge station

Datong Bridge

大通桥
Platform of Line 3
Chinese name
Simplified Chinese大通桥站
Traditional Chinese大通橋站
Transcriptions
Standard Mandarin
Hanyu PinyinDàtōngqiáo Zhàn
General information
LocationShuyun Road (舒云路) × Zhongxing North Road (中兴北路)
Jiangbei District, Ningbo, Zhejiang
China
Coordinates29°54′23.76″N 121°34′39.49″E / 29.9066000°N 121.5776361°E / 29.9066000; 121.5776361
SystemNingbo Rail Transit
OperatorNingbo Rail Transit Co. Ltd.
Lines     Line 2
     Line 3
Platforms4 (2 island platforms)
Tracks4
Construction
Structure type
Underground
Platform levels
2
AccessibleYes
History
Opened26 September 2015 (2015-09-26)
Services
Preceding station Ningbo Rail Transit Following station
Yasaiyan Line 2 Kongpu
towards Honglian
Terminus Line 3 Zhongxing Bridge South
towards Jinhai Road
Location
Map

Datong Bridge (Chinese: 大通桥) is an underground metro station of Line 2 and Line 3 in Ningbo, Zhejiang, China. It situates on the crossing of Qingyun Road and Jintang Road. Construction of the station started in late 2010 and opened to service in September 26, 2015.[1] In June 2019, Datong Bridge Station became a transfer station between Line 2 and Line 3.

Exits

[edit]

Datong Bridge Station has 4 exits.[2]

  • A: Datong North Road (大通北路) Wheelchair user access
  • B: Zhongxing North Road
  • C: Zhongxing North Road, Cangchu Road (仓储路)
  • D: Shuyun Road Wheelchair user access
  • E: Shuyun Road
  • F: Zhongxing North Road, Huancheng North Road (环城北路) Wheelchair user access

References

[edit]
  1. ↑ 陈锦源 (2010-12-23). "2号线车站设计人性化而有宁波味 效果图抢先看". 中国宁波网. Retrieved 2011-01-21.
  2. ↑ "宁波轨道交通 > 乘客服务 > 综合查询". 宁波市轨道交通集团有限公司. Retrieved 2026-06-22.