Edge Rewrite
Jump to content

Shigu station

Shigu

石鼓
Shenzhen Metro
Platform
Chinese name
Chinese石鼓
Transcriptions
Standard Mandarin
Hanyu PinyinShígǔ
Yue: Cantonese
Yale RomanizationSehkgú
Jyutpingsek6 gu2
General information
LocationTongfa South Road (同发南路), located between Dashi 2nd Road (打石二路) and Liuxin 1st Road (留新一路)
Xili Subdistrict, Nanshan District, Shenzhen, Guangdong
China
Coordinates22°34′41″N 113°56′21″E / 22.57806°N 113.93917°E / 22.57806; 113.93917
Operated byMTR China Railway Electrification Rail Transit (Shenzhen) Co., Ltd
(MTR Rail Transit (Shenzhen) Co., Ltd. and China Railway Electrification Bureau Group Co., Ltd.)
Line     Line 13
Platforms2 (1 island platform)
Tracks2
Construction
Structure type
Underground
AccessibleYes
History
Opened28 December 2025 (7 months ago) (2025-12-28)
Former namesChaguang (茶光)
Services
Preceding station SZM Shenzhen Metro Following station
Hi-Tech North Line 13 Liuxiandong
towards Lisonglang
Location
Map

Shigu station (Chinese: 石鼓站; pinyin: Shígǔ Zhàn; Cantonese Yale: Sehkgú Jaahm) is a station on Line 13 of Shenzhen Metro.[1] It opened on 28 December 2025, and is located in Xili Subdistrict in Nanshan District.[2]

Station layout

[edit]
G - Exits A1, B, C, D1, D2
M - (Exits A2, B, C, D2) Mezzanine[a]
B1F South Exit Mezzanine Toilets, Nursery
North Exit Mezzanine -
B2F
Concourse
Lobby Ticket Machines, Customer Service, Station Control Room
B3F
Platforms
Platform 1 arrow for L 13 towards Shenzhen Bay Checkpoint (Hi-Tech North)
Island platform, doors will open on the left
Platform 2 13 towards Lisonglang (Liuxiandong) arrow for R
[edit]

Entrances/exits

[edit]

The station has 6 points of entry/exit. Exits B and D1 are equipped with elevators.

  • A1  A2 : Tongfa South Road, Liuxin 1st Road, Vanke Cloud City Phase VI, Nanshan Cloud Technology Building
  • B  : Dashi 2nd Road, Tongfa South Road, Xiangu Road, Vanke Cloud City Design Commune Area D
  • C : Dashi 2nd Road, Tongfa South Road, Xiancha Road, Vanke Cloud City Design Commune Area C
  • D1   D2 : Tongfa South Road, Liuxin First Road, Dashi First Road, Vanke Cloud City Phase V, Xili Subdistrict Convenience Service Center

Construction timeline

[edit]
  • On 26 July 2017, Shenzhen Metro Group Co., Ltd. issued the "Environmental Impact Report of Shenzhen Urban Rail Transit Line 13 Project", which includes this station, and the project was named Chaguang Station.[3]
  • On 22 April 2022, the Shenzhen Municipal Bureau of Planning and Natural Resources issued the Announcement on the Approval of the Plan for the Station Names of Relevant Lines of the Fourth Phase of Shenzhen Metro, and the station was renamed from "Chaguang Station" to the official station name, "Shigu Station".[4]
  • On 28 December 2025, the station officially opened along with the new stations of Line 13's Phase 1 North Section (except Xili HSR station).[2]

Notes

[edit]
  1. The exit mezzanines are not connected to each other.

References

[edit]
  1. "新线探站 石鼓站" [New Line Station Exploration: Shigu Station] (in Simplified Chinese). 28 December 2025.
  2. 1 2 "深圳地铁13号线一期全线通车 上屋站37分钟可抵达深圳湾口岸站" [The first phase of Shenzhen Metro Line 13 is now fully operational. Shangwu Station is a 37-minute walk from Shenzhen Bay Port Station.]. Shenzhen News Network (in Simplified Chinese). 28 December 2025. Archived from the original on 16 April 2026. Retrieved 29 June 2026.
  3. 深圳大事 (26 July 2017). "深圳地铁13号线开始第一次环评公示!车站数不少于14座,全走地下…" [Shenzhen Metro Line 13 begins first environmental impact assessment announcement! There will be no less than 14 stations, all underground…] (in Simplified Chinese). Archived from the original on 15 January 2023. Retrieved 29 June 2026.
  4. 深圳市规划和自然资源局. "关于《深圳市轨道四期相关线路站名规划》批准方案的公告" [Announcement on the Approval of the "Shenzhen Metro Phase IV Related Line Station Name Planning"]. Shenzhen Government Online (in Simplified Chinese). Archived from the original on 28 October 2022. Retrieved 29 June 2026.
[edit]