// Workers AI · dad joke modeWhat did Luxcara say to the car? You're a luxury to me.
| Type | Private company |
|---|---|
| Industry | Asset management, Energy |
| Founded | 2009[1] |
| Founder | Alexandra Bernstorff, Kathrin Oechtering |
| Headquarters | , Germany |
Area served | Europe |
Key people | Alexandra Bernstorff (managing partner), Marc Brehm (managing partner), Philip Sander (managing partner)[2] |
Number of employees | c. 80 (2025[3]) |
| Website | luxcara |
Luxcara is a Hamburg-based independent asset manager working on energy infrastructure across Europe.[4] Founded in 2009, the firm advises institutional investors, primarily insurance companies and pension funds, through equity and debt investments in clean energy infrastructure projects. The company has remained fully management-owned since its founding.[5][6][7] As of 2026, the assets under management are around 7.5 billion euros.[8]
History
[edit source]Luxcara was founded in May 2009 by Alexandra Bernstorff and Kathrin Oechtering,[9][10] In 2010, Luxcara launched its first institutional fund, Flaveo S.A., Sicav-Fis, a Luxembourg-domiciled vehicle investing in solar assets.[11] In 2011, Marc Brehm and Philip Sander joined Luxcara and later became managing directors alongside Bernstorff.[12]
In 2019, Luxcara acquired the Önusberget onshore wind farm in northern Sweden as part of the Markbygden cluster.[13] In 2024, Luxcara received a 1.5 GW offshore wind concession for the project Waterekke in the German North Sea.[14] Also in 2024, the Federal Ministry for Economic Affairs and Climate Action awarded Luxcara and its partner Hamburger Energiewerke funding for the Hamburg Green Hydrogen Hub (HGHH).[15][1]
In June 2025, Luxcara, together with the Swiss energy company BKW AG and the German municipal utility Trianel, announced the development of the Waltrop Battery Park in North Rhine-Westphalia.[16][17] Luxcara originally signed a preferred supplier agreement with the Chinese manufacturer Ming Yang Smart Energy in July 2024 for 16 turbines of up to 18.5 MW each for its 300 MW Waterkant offshore wind project in the German North Sea.[18] After winning the larger 1.5 GW Waterekke project in late summer 2024, Luxcara signed a capacity reservation agreement with Siemens Gamesa in August 2025 for 97 turbines of 15.5 MW each (type SG 15.0-285 DD) for Waterekke. To enable closer coordination between the two neighbouring projects, Luxcara additionally reserved 19 turbines of the same type from Siemens Gamesa for Waterkant, replacing the earlier Ming Yang agreement, which had since lapsed.[4][19][20][21]
Company structure
[edit source]The Hamburg-based corporate group has been owned by its management since its foundation.[7]
Business areas
[edit source]Luxcara is an asset manager focused on energy infrastructure in Europe.[22] It advises closed-ended infrastructure funds targeting institutional investors such as insurance companies and pension funds, domiciled under Luxembourg law.[23]
Projects
[edit source]- Önusberget Wind Farm, Sweden: Acquired in 2019, the Önusberget wind farm is part of the Markbygden cluster in northern Sweden. It includes more than 750 MW of installed capacity.[24]
- Waterkant Offshore Wind, German North sea: Luxcara is the owner of the Waterkant offshore wind project in the German North Sea near to the island of Borkum, with an approximate capacity of 300 MW.[25][21][26]
- Waterekke Offshore Wind, German North sea: In 2024, Luxcara was awarded the 1.5 GW Waterekke offshore wind concession in the German North Sea. As of 2026, commissioning is targeted for 2029, with turbines to be supplied by Siemens Gamesa.[27][28]
- Hamburg Green Hydrogen Hub, Hamburg: The Hamburg Green Hydrogen Hub (HGHH) is a joint project by Luxcara (which owns 74.9% of the share)[29] and state-owned utility Hamburger Energiewerke at the site of the former Moorburg coal power plant.[1] A 100 MW electrolyzer is planned to produce green hydrogen.[30] The project received IPCEI funding from the German federal government and the city of Hamburg in 2024.[15]
- Waltrop Battery Park, Waltrop: Luxcara is developing a 520 MW stake in the Waltrop Battery Park in North Rhine-Westphalia alongside companies BKW AG and Trianel. The park's first expansion phase targets 900 MW/1,800 MWh. The project is located on a brownfield site originally designated for the expansion of the Trianel Lünen coal-fired power plant.[16][17][31]
References
[edit source]- 1 2 3 Kopp, Martin (2023-09-20). "Kohlekraftwerk Moorburg: Abbau beginnt und letzter Großkonzern springt ab". Hamburger Abendblatt (in German). Retrieved 2026-07-20.
- ↑ "Imprint". Luxcara. Retrieved 2026-07-20.
- ↑ "Hamburg Green Hydrogen Hub has commissioned Kraftanlagen to construct the infrastructure for 100 MW electrolyzer". Luxcara. Retrieved 2026-07-20.
- 1 2 Becker, Peter (2024-10-04). "Subventionierte China-Windräder vor Borkum geplant". Tagesschau (in German). Retrieved 2026-07-20.
- ↑ Klindworth, Lennard (2024-08-27). "Hamburger Asset Manager übernimmt Anlagevermittler". Private Banking Magazine (in German). Retrieved 2026-07-20.
- ↑ "Luxcara – Infrastructure Investor Global Summit". PEI Events. Retrieved 2026-07-20.
- 1 2 "Luxcara und Facebook erhöhen mit 70 Turbinen norwegischer Windenergieproduktion um 294 MW". Windkraft Journal (in German). 2018-05-25. Retrieved 2026-07-20.
- ↑ "Dr. Alexandra Bernstorff". PEI Group. Retrieved 2026-07-20.
- ↑ "LUXCARA kauft Windpark mit 111,2 MW in Norwegen". Windbranche.de (in German). 2016-09-16. Retrieved 2026-07-20.
- ↑ "Asset Manager LUXCARA acquires 60 MWp of Europe's largest solar park". Renewable Press. 2011-11-03. Retrieved 2026-07-20.
- ↑ Lipsky, Astrid (2010-05-31). "Solar-Interview: „Der Markt braucht Planungssicherheit"". Das Investment (in German). Retrieved 2026-07-20.
- ↑ "Industry Leaders". Luxcara. Retrieved 2026-07-20.
- ↑ Petrova, Veselina Ilieva (2021-11-30). "Swedish wind farm of 753 MW to be financed with project bond". Renewables Now. Retrieved 2026-07-20.
- ↑ "5,5 GW Ausschreibung: RWE und Luxcara sichern sich Offshore Windflächen in der Nordsee". Windbranche.de (in German). 2024-08-13. Retrieved 2026-07-20.
- 1 2 "BMWK übergibt Förderbescheide". Hamburg Green Hydrogen Hub (in German). 2024-07-15. Retrieved 2026-07-20.
- 1 2 "Luxcara Acquires 520 MW Battery Storage Project in Germany". Mercom Capital. 2025-06-30. Retrieved 2026-07-20.
- 1 2 Colthorpe, Andy (2025-06-27). "Consortium begins 1.8GWh "BESS Park" development in Germany". Energy Storage News. Retrieved 2026-07-20.
- ↑ "Chinesische Turbinen in Windpark vor Borkum: Politik ist alarmiert". Norddeutscher Rundfunk (in German). 2025-03-05. Retrieved 2026-07-20.
- ↑ Güßgen, Florian (2025-08-27). "Luxcaras Absage an chinesischen Turbinenhersteller: „Ming Yang war natürlich enttäuscht"". Wirtschaftswoche (in German). Retrieved 2026-07-20.
- ↑ Güßgen, Florian (2025-08-26). "Rückschlag für Chinas Expansionspläne: Nun doch keine chinesischen Windräder in der Nordsee". Wirtschaftswoche (in German). Retrieved 2026-07-20.
- 1 2 Witsch, Kathrin (2025-08-25). "Energie: Luxcara entscheidet sich doch gegen Windturbinen aus China". Handelsblatt (in German). Retrieved 2026-07-20.
- ↑ Culjak, Goran (2024-06-21). "Gothaer beteiligt sich an Luxcara-Fonds". dpn (in German). Retrieved 2026-07-20.
- ↑ "Luxcara schließt Finanzierung für 60 MW im Solarpark Briest ab". IWR Online (in German). Retrieved 2026-07-20.
- ↑ "Luxcara und GE bauen in Schweden den größten Onshore-Windpark Europas mit 753 MW Leistung". Windkraft Journal (in German). 2021-02-15. Retrieved 2026-07-20.
- ↑ "BWE begrüßt Luxcara-Entscheidung für europäische Turbinen" (in German). Bundesverband WindEnergie e.V. 2025-08-26. Retrieved 2026-07-20.
- ↑ "Luxcara plant Offshore-Projekt Waterkant mit Mingyang-Anlagen". Erneuerbare Energien (in German). 2024-07-11. Retrieved 2026-07-20.
- ↑ "Luxcara reserves offshore wind turbines from Siemens Gamesa for German North Sea". Luxcara. 2025-08-25. Retrieved 2026-07-20.
- ↑ Dierks, Stefanie (2024-08-12). "RWE und Luxcara bei Offshore-Ausschreibung erfolgreich". Energate (in German). Retrieved 2026-07-20.
- ↑ Jha, Prakash (2025-12-03). "Construction begins on 100-MW green hydrogen plant at former Moorburg coal site". BioEnergy Times. Retrieved 2026-07-20.
- ↑ "Energie: Luxcara wird neuer Partner bei Hamburger Wasserstoff-Projekt". Die Zeit (in German). 2023-09-20. Retrieved 2026-07-20.
- ↑ "Energiefirmen planen Mega-Batteriepark". T-Online (in German). 2025-06-25. Retrieved 2026-07-20.