Fort Martin Power Station

Fort Martin Power Station
Fort Martin Power Station in 2026
Map
CountryUnited States
LocationFort Martin, near Maidsville, Monongalia County, West Virginia
Coordinates39°42′39″N 79°55′39″W / 39.710833°N 79.9275°W / 39.710833; -79.9275
StatusOperational
Commission dateUnit 1: October 1967
Unit 2: December 1968
OwnerFirstEnergy
OperatorMonongahela Power Company
Thermal power station
Primary fuelBituminous coal
Turbine technologySteam turbine
Cooling sourceMonongahela River
Power generation
Nameplate capacity1,152 MW

Fort Martin Power Station is a coal-fired power station on the Monongahela River at Fort Martin, near Maidsville, West Virginia. It is owned and operated by Monongahela Power Company, a subsidiary of FirstEnergy. The station's two units have a combined nameplate capacity of 1,152 megawatts (MW) and a net summer capacity of 1,098 MW.[1][2]

History

[edit]

Plans for the first 500 MW unit estimated a cost of $57.5 million and annual consumption of about 1.35 million tons of coal from nearby mines. The planned site was about three-quarters of a mile upstream from the Pennsylvania state line.[3] Unit 1 entered commercial service in October 1967, followed by Unit 2 in December 1968. The units have net capacities of 552 MW and 546 MW.[1]

Fort Martin is planned to remain operational through 2035.[4] In February 2026, Mon Power and Potomac Edison proposed a separate 1,200 MW combined-cycle natural-gas plant adjacent to Fort Martin, with operation proposed for late 2031. A public hearing on the proposal was held in July 2026.[5][6]

Environmental controls

[edit]

In 2006, the West Virginia Public Service Commission approved construction of wet flue-gas desulfurization systems for both units.[7] The systems entered service in 2009 and were designed to remove 98 percent of the sulfur dioxide from the flue gas using limestone forced oxidation, producing gypsum as a byproduct.[8] The plant also uses electrostatic precipitators to collect fly ash. Scrubbed flue gas is discharged through a 550-foot (170 m) chimney, while two hyperbolic cooling towers recirculate water with makeup supplied from the Monongahela River.[2]

See also

[edit]

References

[edit]
  1. 1 2 "Preliminary Monthly Electric Generator Inventory, June 2026" (XLSX). U.S. Energy Information Administration. July 23, 2026. Operating tab, plant 3943. Retrieved August 5, 2026.
  2. 1 2 Fort Martin Power Station (PDF) (Report). FirstEnergy. 2014. Retrieved August 5, 2026.
  3. "Aerial View of Site of Fort Martin Power Plant, Monongalia County, W. Va". West Virginia History OnView. West Virginia University Libraries. Retrieved August 5, 2026.
  4. Proctor, Darrell (October 13, 2025). "FirstEnergy Plan Calls for New Gas-Fired Plant, Continued Coal-Fired Generation". POWER Magazine. Retrieved August 5, 2026.
  5. "Mon Power and Potomac Edison Select Maidsville, West Virginia, Site for New Natural Gas Power Plant" (Press release). FirstEnergy. February 13, 2026. Retrieved August 5, 2026.
  6. Hughart, Chase (July 16, 2026). "Public opposition dominates PSC hearing on FirstEnergy's proposed $2.48 billion Fort Martin gas plant". WV News. Retrieved August 5, 2026.
  7. Commission Order, Case Nos. 05-0402-E-CN and 05-0750-E-PC (Report). Public Service Commission of West Virginia. April 7, 2006. Retrieved August 5, 2026 via U.S. Securities and Exchange Commission.
  8. "Fort Martin Case Study". Babcock & Wilcox. Retrieved August 5, 2026.