Edge Rewrite
// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a29922388b9a4652

Jump to content

Talk:Shetland HVDC Connection

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 14 years ago by Beagel in topic Background

Background

[edit]

It might be worth mentioning if it can be referenced, that the connector will remove the Islands dependency on oil generated electricity eg http://www.shetland.gov.uk/splan/ene.htm also for exceptions see http://www.ofgem.gov.uk/Networks/ElecDist/Policy/Documents1/SHEPD_NINES_CONSULTATION.pdf section 1.16 p.9 Oranjblud (talk) 13:25, 9 April 2012 (UTC)Reply

I can't find it right now, but one of these background documents explained that due to be being built as single circuit connection (for economic reasons to reduce building and transmission cost), the diesel generation facilities should remain in use as reserve capacities in the case of transmission interruption. Beagel (talk) 13:46, 9 April 2012 (UTC)Reply
http://www2.env.uea.ac.uk/energy/energy_links/transmission/tnei-grid-study-june-07.pdf says at the page 37 that to avoid replacement existing generation [due to nearing end of economic life] interconnector needs two independent circuit. According to developer, the connector will be sinle circuit. http://www.ssepd.co.uk/uploadedFiles/TPCR5_Green_Paper.pdf Beagel (talk) 14:12, 9 April 2012 (UTC)Reply