Edge Rewrite
// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2ae112fbf1f89da

Jump to content

Talk:List of tallest buildings in Delhi-NCR

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 8 months ago by Sawarijoshi in topic Status of Supernova Spira

Move discussion in progress

[edit]

There is a move discussion in progress on Talk:List of tallest bridges in the world which affects this page. Please participate on that page and not in this talk page section. Thank you. RMCD bot 13:17, 22 April 2015 (UTC)Reply

Victory Valley Towers

[edit]

Are the Victory Valley Towers still under construction? I cannot find any photos, only what seems like concept art, and searching on Google seems to indicate that they are not yet complete. If so, they should be moved to the "under construction" table. Nicole Sharp (talk) 23:17, 23 August 2016 (UTC)Reply

If Navi Mumbai has its own page why not Gurgaon?

[edit]

Why the hell should Delhi get the credit for tall buildings built in a totally different state with a different government? Let Mr AK49 build tall buildings in Delhi and improve Delhi. Did the governments of UP and Haryana allow tall buildings to come up to be listed under Delhi? 211.27.120.172 (talk) 15:45, 27 September 2016 (UTC)Reply

"Sikka Dream Height" listed at Redirects for discussion

[edit]

The redirect Sikka Dream Height has been listed at redirects for discussion to determine whether its use and function meets the redirect guidelines. Readers of this page are welcome to comment on this redirect at Wikipedia:Redirects for discussion/Log/2023 August 1 § Sikka Dream Height until a consensus is reached. Hey man im josh (talk) 15:34, 1 August 2023 (UTC)Reply

Lucknow in the list of under construction buildings in Delhi NCR

[edit]

There is one tall building in Lucknow which is included in this list. Lucknow is not in Delhi NCR so that entry should be removed. 203.81.241.241 (talk) 17:04, 23 February 2025 (UTC)Reply

I have removed it. Thank you for reporting this. Sawarijoshi (talk) 10:55, 3 May 2025 (UTC)Reply

Verified source for height of M3M IFC?

[edit]

Does anyone have a verified source which has the precise height of M3M IFC? None of the usual sources like CTBUH or Emporis have the height mentioned. I could not even find this project on the RERA portal. Sawarijoshi (talk) 10:58, 3 May 2025 (UTC)Reply

A Commons file used on this page or its Wikidata item has been nominated for speedy deletion

[edit]

The following Wikimedia Commons file used on this page or its Wikidata item has been nominated for speedy deletion:

You can see the reason for deletion at the file description page linked above. —Community Tech bot (talk) 12:52, 28 June 2025 (UTC)Reply

A Commons file used on this page or its Wikidata item has been nominated for speedy deletion

[edit]

The following Wikimedia Commons file used on this page or its Wikidata item has been nominated for speedy deletion:

You can see the reason for deletion at the file description page linked above. —Community Tech bot (talk) 11:38, 20 September 2025 (UTC)Reply

Status of Supernova Spira

[edit]

Shouldn’t this be listed in the Under-construction section? It is clearly not completed or topped out.

Based on historical Street View imagery and recent pictures of the building posted on its Google listing, it appears that not even a single new floor has been added to the Supernova Spira building in the past year. Construction appears to be on hold. Moreover, the latest images (from a week ago) show only 63 floors above ground, which is significantly lower than the 80 floors mentioned on this page. If the building is indeed topped out, then the height of the building is definitely not 300m.

Does anyone have concerns about moving Spira to the u/c section? Sawarijoshi (talk) 21:11, 22 September 2025 (UTC)Reply

FullFlo Joy Goel Thoughts? Sawarijoshi (talk) 11:45, 25 September 2025 (UTC)Reply
@Sawarijoshi firstly, i want to apologize for such a late reply to your post which i see was on 22nd September, I see you had mentioned me here but somehow i didn't get notified . To get to the point Supernova Spira is indeed On Hold, however it had topped out in the time between 2020-2022 as mentioned here this Delhi NCR page does include on hold buildings with the precondition that they have atleast topped out, as mentioned in the fist paragraph of the tallest buildings list.
Similar buildings include Raheja revanta also Bahria Icon tower in Pakistan note that the Bahria icon tower finds itself present in all pages including this List of tallest buildings in South Asia page despite being on hold for over 5 years. Joy goel (talk) 08:15, 4 October 2025 (UTC)Reply
@Joy goel No apology necessary; we’ve all got a life outside of Wiki.
Thank you for confirming the building status. If the building was indeed topped out prior to construction being put on hold in 2022, then the claimed height (300m) and claimed floor count (80) are very likely incorrect. If you look at any recent picture of Spira, you’ll find that there are only 63 floors above ground. This is much lower than the claimed floor-count of 80 in every single Wiki page where Spira is listed. Do we have a verifiable source which confirms that construction did indeed reach 300m before being put on hold in/prior to 2022? The floor count certainly didn’t reach anywhere close to 80. Sawarijoshi (talk) 15:31, 4 October 2025 (UTC)Reply
@Sawarijoshi I have gone through various sources all of them say that spira is 300m with 80 floors this is the CTBUH link .
This is another link from the website 'Skyscraper Page', i think this would be more helpful as it states the year of topping out, the height and floor count with diagrams please see this Joy goel (talk) 17:46, 4 October 2025 (UTC)Reply
@Joy goel Thank you for sharing these links. The top portion of the building structure (as of today) looks nothing like these elevation drawings or digital renders. The slab work in the actual building has only been completed till just below the helipad level. When compared to this, the actual building seems to be completed till only around the 260m level. None of the floors above the helipad (with the sloping facade) appear to have actually been built.
While there is absolutely no doubt that the architectural drawings and renders of Spira all clearly state 300m and 80 floors, I suspect that all 80 floors haven’t actually been built yet.
One can easily compare these proposed elevation drawings with the actual building (in reality) and notice that there are at least 10-12 floors missing at the top (look above the double-height refuge floor at the top). Here’s one example video of Spira from earlier this month in which you can clearly count less than 70 floors built. Sawarijoshi (talk) 19:03, 4 October 2025 (UTC)Reply
@Sawarijoshi thanks for sharing that YouTube video, however I don't think we can use a YouTube video to ascertain the metrics of a buildings as that would fail WP:VERIFY I'm sure you would know that we need verifiable sources for information here, CTBUH and Skyscraper Page both say that the building is 300m with 80 floors, so as of now we need to go by that, when i can find a verifiable source which gives the actual height and floor count of the building i will update this page with that data, if you have any verifiable source for the metrics of Spira please share it here with me and i will update the info accordingly.Thanks. Joy goel (talk) 07:34, 5 October 2025 (UTC)Reply
@Joy goel I totally agree. I’m not suggesting the use of that YouTube video as a citation. All I’m saying is that although these elevation diagrams do state the proposed height as 300m and proposed number of floors as 80, it is evident beyond any doubt that the building hasn’t actually been topped out with 80 floors. Wouldn’t you agree? Sawarijoshi (talk) 11:34, 5 October 2025 (UTC)Reply
@Sawarijoshi Yes I agree. However until we find a Reliable source for the actual metrics of the building the height and floor count will stand as 300m and 80fl, as that is the only available data. Joy goel (talk) 12:38, 5 October 2025 (UTC)Reply
Makes sense. Sawarijoshi (talk) 16:32, 5 October 2025 (UTC)Reply
@Joy goel RK Arora, the chairman of Supertech Group, stated in June 2024 that only “68 floors of the Spira building had been built”. [Source: Hindustan Times] This count of 68 floors aligns exactly with the architectural elevation, when you compare the actual building with the proposed elevation and digital renders.
Construction on Spira had already halted prior to 2024 and there is no evidence (neither documentary through news publications nor visual through real-life images/videos) that construction has resumed beyond the 68th floor. Sawarijoshi (talk) 06:16, 6 October 2025 (UTC)Reply
@Joy goel, the revised elevation plans of Spira (with the reduced number of floors) are also available on the Supertech website, with the floor numbers clearly mentioned. The revised elevation plan is as follows:
Level 0-4: Parking
Level 5-17: Spira Residences
Level 18: Refuge floor
Level 19-43: Spira Suites
Level 44: Refuge floor
Level 45: Clubhouse / Club S
Level 46-58: Spira Offices
Level 59-66: Spira Sky Villas
Level 67: Space S
Level 68: Helipad and Observatory
Despite being marketed as the "80th floor observatory," the actual structure comprises only 68 floors, as confirmed by multiple credible sources. The elevation plans (linked above) available on the official Supertech website align precisely with recent construction images and corroborate the statement made by the Supertech Chairman in 2024, who confirmed that only 68 floors have been built.
In my view, the Hindustan Times article is a highly credible and recent source, particularly because it directly quotes the Supertech Chairman. Moreover, the revised floor count of 68 is further validated by the Supertech website itself and on-ground visual evidence. All indicators consistently point to a floor count of G+68.
While the 300m height figure was accurate according to older documents published prior to 2024, those plans have since been revised. Even the digital renders of the building published on the Supertech website now show fewer floors than the initial drawings and also a changed terrace and observatory design. For reference, here is an example of the older elevation design - the building looks nothing like this anymore and the entire top section of about 10 floors doesn't exist in the revised building plans. Therefore, any references to the outdated height or floor count should no longer be considered reliable. Sawarijoshi (talk) 10:08, 14 October 2025 (UTC)Reply
@Sawarijoshi Is there any mention of Spira's current height in any of these documents? I have gone through some of them but couldn't find any mention of its height. However its quite evident that the floor count is actually 68 and not 80, for a Mixed use building 68 floors generally means a height in the range of 265 - 275m. A source for the height is still needed for it to be updated here. Joy goel (talk) 12:44, 14 October 2025 (UTC)Reply
@Joy goel I agree that it would be around 270m. Unfortunately, I couldn’t find the revised height mentioned anywhere either. Sawarijoshi (talk) 14:43, 14 October 2025 (UTC)Reply
@LivinAWestLife Any recommendations on how to proceed? The TLDR is that Supernova Spira, which is supposedly the third-tallest building in India at 300m and 80 floors, doesn’t actually have 80 floors. Its plans were revised (details above) and only 68 floors have been completed with no further floors being added. Architectural drawings of the revised plans have not been published online but estimates (based on floor-rise calculations and comparisons with its neighbouring skyscrapers) put the height around 270m. As of now, every single wiki list mentions Spira’s height as 300m and 80 floors. In the absence of a reliable source for the revised height, what should be done? Sawarijoshi (talk) 00:33, 24 November 2025 (UTC)Reply
Since it's not a completed building it should be on the under construction section and marked as on hold, and with the revised estimated height instead of the former height of 300 m and 68 floors, reflecting the most up to date information. This should be changed for every tallest building list with the Supernova Spira. LivinAWestLife (talk) 00:40, 24 November 2025 (UTC)Reply
@Sawarijoshi This information should be cited of course, if the citation is unavailable keep the former height but it should remain in the on hold section. LivinAWestLife (talk) 00:41, 24 November 2025 (UTC)Reply
There is a reliable citation for the revised floor count of 68 but none for the revised height. Sawarijoshi (talk) 00:46, 24 November 2025 (UTC)Reply
Even though construction on the upper floors have been halted, there are residents living in the lower floors. Could the building still be considered “on hold”? Sawarijoshi (talk) 00:48, 24 November 2025 (UTC)Reply