Silvan Dam

Silvan Dam
Silvan Dam is located in Turkey
Silvan Dam
Silvan Dam
Location within Turkey
Official nameSilvan Barajı
LocationSilvan, Turkey
Coordinates38°17′38″N 41°01′18″E / 38.29389°N 41.02167°E / 38.29389; 41.02167
PurposeIrrigation, power
StatusUnder construction
Construction began2011
OwnerState Hydraulic Works
Dam and spillways
Type of damEmbankment, concrete-face rock-fill
ImpoundsBatman River
Height174.5 m (573 ft)
Length440 m (1,444 ft)
Dam volume8,500,000 m3 (6,891 acre⋅ft)
Reservoir
CreatesSilvan Reservoir
Total capacity7,300,000,000 m3 (5,900,000 acre⋅ft)
Surface area178 square kilometres (69 mi2)
Power Station
Commission date2026
Turbines4 x 40 MW Francis-type
Installed capacity160 MW

Silvan Dam is an embankment concrete-face rock-fill currently under construction on the Batman River in the district of Silvan, Diyarbakır Province in southeastern Turkey. It is part of the Southeastern Anatolia Project and located upstream of the Batman Dam.

Construction

[edit]

Construction began on 26 July 2011. The purpose of the dam is hydroelectric power production and irrigation. It is designed to irrigate an area of 245,000 ha (610,000 acres). The power station will have an installed capacity of 160 MW.[1][2]

In 2014, the dam, as well as other in southeast Turkey such as the Ilisu Dam, became a prime target of Kurdistan Workers' Party (PKK) militants after peace talks collapsed with the government. Attacks on the dam, supporting structures and workers are part of the PKK's efforts to stop construction. These attacks delayed construction by 2 years.[3]

In December 2017, Diyarbakır Governor Hasan Basri Güzeloğlu inspected the Silvan Dam site, where State Hydraulic Works (DSİ) officials reported that the project was nearing completion with final works continuing before operation and integration with the associated irrigation and hydropower facilities.[4] The construction of the Silvan Tunnel which brings the water from the dam to the surrounding plains started in June 2019.[5] The dam body was completed in January 2021 and some sources say the entire project was completed in the end of 2022.[6][7][8]

In April 2024, Turkey's Ministry of Agriculture and Forestry reported that the Silvan Dam had reached 96% physical completion.[9] In June 2024, Andritz announced that it had been selected by Turkey's State Hydraulic Works to supply the electro-mechanical equipment for the 160 MW Silvan Hydroelectric Power Plant, including four 40 MW turbines, generators, and related systems. The plant is expected to produce 681 GWh of electricity annually once operational.[10]

In May 2026, the DSİ conducted a technical inspection of the Silvan Project components under construction, including the Silvan Dam Completion Works and the Silvan Tunnel Completion Phase 2 works. The inspection confirmed that final-stage activities were continuing on the dam infrastructure and water conveyance systems.[11] A month later, installation works at the Silvan Hydroelectric Power Plant reached key milestones, with all four draft tubes installed and the first spiral case completed, as the project moved closer to commissioning.[12]

In July 2026, construction continued on the Taşköprü Viaduct and connecting roads associated with the Silvan Dam project to maintain transportation links after reservoir filling. The State Hydraulic Works reported that the project had reached 68% physical completion, with completion targeted for 2027.[13]

References

[edit]
  1. "Initiated the construction of the dam is SİLVAN" (in Turkish). GAP. Archived from the original on 22 May 2013. Retrieved 21 May 2013.
  2. "Silvan Dam Due Date Moved Up" (in Turkish). Ilke Haber Ajansi. 4 April 2013. Archived from the original on 29 July 2013. Retrieved 21 May 2013.
  3. "Turkey's Biggest Dam Project Victim of Faltering Peace". Bloomberg Business. 12 November 2014. Retrieved 25 November 2015.
  4. "Vali Güzeloğlu, Silvan Barajı çalışmalarını yerinde inceledi" [Governor Güzeloğlu inspected the Silvan Dam construction works on site] (in Turkish). Governorate of Diyarbakır. 27 December 2017.
  5. "Yapımı 1 milyar 200 milyon liraya mal olacak olan Silvan Tüneli'nin yapımına başlandı". haberler.com (in Turkish). 10 June 2019.
  6. "Silvan Barajı teröre inat yükseliyor!". hilal Haber (in Turkish). 28 March 2017.
  7. "Physical realization of Diyarbakır's 'crazy project' reached 73 percent" (in Turkish). TRT Haber. Retrieved 5 May 2021.
  8. "Turkish president inaugurates 34 hydroelectric power plants". Hydro Review. 2022-08-16. Retrieved 2024-02-04.
  9. "Bakan Yumaklı: "Silvan Barajı ve HES'te elektrik üretimi için sözleşme imzalandı"" (in Turkish). tarimorman.gov.tr. 25 April 2024.
  10. "ANDRITZ to equip the new Silvan hydropower plant in Türkiye". Andritz. 6 June 2024.
  11. "İç Denetim Birimi Başkanlığı tarafından DSİ 10. Bölge Müdürlüğü (Diyarbakır) sorumluluğundaki bazı projelere yönelik teknik inceleme ziyareti gerçekleştirildi" [A technical trip covering some projects under the responsibility of the DSI 10th Regional Directorate (Diyarbakır) was organized by the Internal Audit Unit] (in Turkish). DSİ Internal Audit Unit. 18 May 2026.
  12. "ANDRITZ Türkiye achieves key milestones at Silvan HEPP". Andritz. 25 June 2026.
  13. "Silvan Barajı'nda Kritik Ulaşım Projesi Hız Kazandı" (in Turkish). diyarbakirolay.com.tr. 7 July 2026.