Edge Rewrite
// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a27688ce7ac8689d

Jump to content

Chisamba Solar Power Plant

Chisamba Solar Power Plant
Map
CountryZambia
LocationChisamba District, Central Province
Coordinates14°36′36″S 28°35′24″E / 14.60992772°S 28.59003929°E / -14.60992772; 28.59003929
StatusOperational
Construction beganJuly 2024
Commission dateJune 2025
Construction costUS$100 million
OwnerKNBEPC (subsidiary of ZESCO)
OperatorZESCO
Solar farm
Type
Power generation
Nameplate capacity100 MW

The Chisamba Solar Power Plant is a 100 megawatt (MW) grid-connected photovoltaic (PV) solar power station in Chisamba District, Central Province, Zambia. It was commissioned in June 2025.[1]

Overview & Capacity

[edit]

The plant was developed by the Kariba North Bank Extension Power Corporation,[2] a subsidiary of ZESCO, and built by Power China International Group. Financing came from a mix of debt and equity: Stanbic Bank Zambia provided a loan of US$71.5 million, while ZESCO and KNBEPC each contributed US$30 million in equity.[3] Total investment in the first phase was approximately US$100 million.[4] The plant has an installed capacity of 100 MW and is estimated to supply enough electricity for 30,000 to 50,000 homes.[5]

Power purchase and usage

[edit]

Electricity from the plant is sold under a 13-year power purchase agreement (PPA) with GreenCo Power Services, with the power supplied primarily to First Quantum Minerals (FQM), a copper mining company operating in Zambia.[6] Under the arrangement, ZESCO redirects an equivalent amount of electricity to domestic consumers.[7]

Economic and social impact

[edit]

Construction created over 1,200 jobs, of which approximately 98% were sourced locally. The plant is expected to employ around 100 people during operations. It is part of Zambia's plan to install 1,000 MW of solar capacity by 2025.[8] A second 100 MW phase at the site is planned.[1]

See also

[edit]

References

[edit]
  1. 1 2 "How Zambia turns to solar to solve energy crisis – DW – 04/11/2025". Deutsche Welle. Retrieved 3 July 2025.
  2. "Zambia plugs 100MW of solar power into national grid". The EastAfrican. 1 July 2025. Retrieved 3 July 2025.
  3. "Zambia: Chisamba solar plant (100 MW) accelerates private energy transition". EnergyNews. 19 May 2025. Retrieved 3 July 2025.
  4. "Zambia completes 100 MW solar farm". PV Magazine International. 26 May 2025. Retrieved 3 July 2025.
  5. "Zambia : ZESCO to Add 500 Megawatts of Solar Power to National Grid". 25 April 2025. Retrieved 3 July 2025.
  6. "Zambia launches 100 megawatt solar plant supplying First Quantum Minerals". Reuters. 30 June 2025. Retrieved 3 July 2025.
  7. "Zambia Launches 100MW Solar Plant for First Quantum Minerals in 2025". Discovery Alert. 30 June 2025. Retrieved 3 July 2025.
  8. "Zambia : Government Targets 1000 MW Electricity From Solar For 2025". 8 March 2025. Retrieved 3 July 2025.