Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a29b0f1fedf79de8

Jump to content

// Workers AI · dad joke modeWhat did the Wenshan Tram say to its friend? "You're on the right track.

From Wikipedia, the free encyclopedia
Wenshan Tram
Wenshan Tram Line 4 at Jiaolian Plaza
Operation
OpenMay 15, 2021; 5 years ago (2021-05-15)
Infrastructure
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationBattery and supercapacitor powered, overhead line at stops only
Statistics
Route length13.96 km (9 mi)
Stops11

Wenshan Tram is a tram system serving Qiubei County, Wenshan Prefecture, Yunnan, China.

Lines in operation

[edit]

Line 4

[edit]

Line 4 consists of a main line with 8 stops and branch line with 3 stops.[1] Most of the route is grade separated. The trams are powered through a combination of batteries and supercapacitors, which negates the need for continuous overhead line outside of halts. The rolling stock consists of 15 low-floor trams built by CRRC Zhuzhou. The network opened on 15 May 2021.[2][3][1]

In 2023 it had the second lowest passenger numbers of all trams in China (save for the Honghe Tram), with 1,372 passengers daily.[4][5]

Route

[edit]

The tram connects the urban center of Qiubei and the Puzhehei Tourist Service Center to Puzhehei railway station on the Nanning–Kunming high-speed railway.[1] Map

References

[edit]
  1. 1 2 3 "文山普者黑轻轨4号线试运行". Archived from the original on 2021-05-27. Retrieved 2021-05-27.
  2. "Qiubei: Another new tramway in China". Urban Transport Magazine. 2021-05-20. Retrieved 2021-07-25.
  3. "丘北成为国内首个拥有有轨电车项目的县级城市-丘北县人民政府门户网站". www.ynqb.gov.cn. Retrieved 2021-07-25.
  4. "一年运营成本4000万,车票收入仅160万!甘肃天水花24亿修的有轨电车,为啥老百姓不愿坐,还被中央点名? | 每经网". www.nbd.com.cn. Retrieved 2024-09-03.
  5. "严重亏损、停运甚至拆除,有轨电车前期可行性研究为何失效? | 界面新闻". m.jiemian.com. Retrieved 2024-09-03.