Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2432b3978761ef0

Jump to content

Wells Dam

Wells Dam
Map
Interactive map of Wells Dam
Official nameWells Hydroelectric Project[1]
LocationChelan / Douglas counties, Washington
Coordinates47°56′43.44″N 119°51′57.6″W / 47.9454000°N 119.866000°W / 47.9454000; -119.866000
Construction beganJuly 12, 1962[1]
Opening dateAugust 22, 1967
OperatorDouglas County Public Utility District
Dam and spillways
ImpoundsColumbia River
Height (foundation)186 feet (57 m)[2]
Length4,460 feet (1,360 m)[3]
Width (crest)169 feet (52 m)[2]
Spillways11[2]
Reservoir
CreatesLake Pateros
Total capacity331,200 acre⋅ft (0.4085 km3)
Power Station
Turbines
  • 10 Total MW[4]
  • 7x 89.0 MW
  • 3x 77.4 MW
Installed capacity855.2 MW [4]
Annual generation3,502.38 GWh[5]

Wells Dam is a hydroelectric embankment dam located on the Columbia River, downstream from the confluence of the Okanogan River, Methow River, and the Columbia River in Washington state. The dam, associated structures, and machinery make up the Wells Hydroelectric Project. It is owned and operated by Douglas County Public Utility District.

The yellow cranes and other equipment are part of Wells Dam

It has produced electricity since August 22, 1967. Its operating license from the US Federal Energy Regulatory Commission is next up for renewal in 2052.[6] The Wells project has ten generating units rated at a combined 855.2 megawatts.[4] In addition to the Douglas County and Okanogan County public utility districts, the project provides electricity to Puget Sound Energy, Portland General Electric, PacifiCorp, Avista Corporation,[7] and the Confederated Tribes of the Colville Reservation.[8]

Its reservoir is named Lake Pateros. Just below and adjacent is Carpenter Island boat launch and fish hatchery river access. Lake Pateros is not deep but a high volume of water moves through it. Thus, low-head, high-volume Kaplan turbine runners drive generation.[9]

Hydroelectric power capacity

[edit]
GeneratorNameplate Capacity (MW)[4]
U-177.4
U-289.0
U-389.0
U-489.0
U-589.0
U-689.0
U-789.0
U-877.4
U-977.4
U-1089.0
Total855.2

See also

[edit]

References

[edit]
  1. 1 2 "Wells Project License". Douglas County PUD. Public Utility District No. 1 of Douglas County. Retrieved March 21, 2026.
  2. 1 2 3 "Property ID: 710488 Wells Dam Hydrocombine". WISAARD. Washington State Department of Archaeology and Historic Preservation. Retrieved March 27, 2026.
  3. "Wells Project". Douglas County PUD. Public Utility District No. 1 of Douglas County. Retrieved March 21, 2026.
  4. 1 2 3 4 "January 2026: EIA 860M". Preliminary Monthly Electric Generator Inventory. U.S. Energy Information Administration. Retrieved March 21, 2026.
  5. "2024: EIA-923". Form EIA-923 detailed data with previous form data. U.S. Energy Information Administration. Retrieved March 21, 2026.
  6. Christine Pratt (May 30, 2013). "Wells Dam gets new 40-year license". The Wenatchee World. Retrieved May 31, 2018.
  7. "Wells Hydroelectric Project". Foundation for Water & Energy Education. Retrieved December 18, 2021.
  8. "How the Confederated Tribes of the Colville Reservation Balance Hydropower and Natural Resource Protection". Hydro Leader. December 14, 2021. Retrieved December 18, 2021.
  9. "Wells Dam Rehabilitation Project". Toshiba America Energy Systems Corp. Retrieved May 31, 2018.