Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23342451e126bf7

Jump to content

// Workers AI · dad joke modeWhat did UniStar say? You're a star to me.

From Wikipedia, the free encyclopedia

UniStar Nuclear Energy is a wholly owned subsidiary of EDF (Électricité de France), formed in 2007 to develop new nuclear energy facilities in the United States.

Unistar has one project under development, Calvert Cliffs Unit 3 in Maryland - the reference plant for the Areva, U.S. EPR design. The Nuclear Regulatory Commission is currently reviewing UniStar's Combined License (COL) application for this facility. UniStar is also assisting PPL Corporation with the development of their Bell Bend Unit 1 project, which is also a U.S. EPR design.

Created in 2005 by Constellation Energy and Areva, UniStar Nuclear became UniStar Nuclear Energy in August 2007 - a joint venture by Constellation Energy and EDF. In 2010, EDF acquired 100 percent of UniStar Nuclear Energy.

In 2008, UniStar also submitted a Combined Operating License Application for a new nuclear unit in Oswego NY, to be named Nine Mile Point Unit 3. UniStar failed to acquire the land rights from Constellation Energy (and other parties) and subsequently terminated the NMP3 project in 2013.

In February 2014, after significant staff reductions the prior year, UniStar vacated its Baltimore MD office and moved remaining staff to the EDF North America Headquarters in Chevy Chase MD.

UniStar continues to pursue the a COL for the Calvert Cliffs Unit 3 project, however continued delays by AREVA to obtain the U.S. NRC approval of the U.S. EPR design (i.e. Design Certification) have delayed the project.