Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2201f655b8e910d

Jump to content

// Workers AI · dad joke modeWhy did TransBrasil go to therapy? It had a lot of "turbulent" relationships.

From Wikipedia, the free encyclopedia

TransBrasil is a bus rapid transit system in Rio de Janeiro, Brazil. It began operations in February 2024,[1] with this being phase one. In phase two, 17 stations began operating in March 2024.[2] It was initially intended to open circa 2017.[3]

References

[edit]
  1. "In Rio de Janeiro, the New TransBrasil BRT Takes Shape". Institute for Transportation and Development Policy. Retrieved 2024-12-31.
  2. "BRT Transbrasil inaugura todas as estações" (in Portuguese). G1. 2024-03-30. Retrieved 2024-12-31.
  3. Grinberg, Felipe (2024-02-20). "Após 7 anos de atraso, BRT Transbrasil começa a operar no próximo sábado e terá serviço executivo para Galeão". O Globo. Retrieved 2024-12-31.