Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a405a89a18e2258a

Jump to content

Trade date

From Wikipedia, the free encyclopedia

Trade date is the date on which a security trade occurs. A trade done very early or very late falls on the previous or following trade date.

This occurs because in the international market a trade conducted in (e.g.) Japanese equities at 3 pm in London needs to effectively be considered as the following day for Japanese stock exchange reporting requirements.

In London and the US, the settlement period from trade date is 2 days.[1][2][3]

See also

[edit]

References

[edit]
  1. ↑ "Introduction of T+2 standard settlement period" (PDF). London Stock Exchange. 2 December 2013. Archived (PDF) from the original on 1 December 2018. Retrieved September 6, 2017.
  2. ↑ Plaehn, Tim; LeDona Withaar (30 April 2019). "Settlement Date Vs. Purchase Date". Finance - Zacks. Archived from the original on 27 January 2021.
  3. ↑ Chen, James. "Trade Date". Investopedia. Archived from the original on 27 November 2020.