Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a24c0e6a9831a87d

Jump to content

Talk:Viking Link

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 2 years ago by Lklundin in topic Criteria for completion

Apologies if this is a stupid suggestion, but should the page somewhere make clear which direction the electricity is intended to flow - i.e. what is the purpose of the interconnect? Is it to supply the UK with power from Denmark, or the other way round, or both? Many thanks  Preceding unsigned comment added by 2A02:C7F:202:B900:80E5:8EA:2DFD:9628 (talk) 12:59, 1 October 2021 (UTC)Reply

Criteria for completion

[edit]

The Viking Link cable has been physically installed. The company has announced its commissioning plans, these are expected to start and finish later this year, with first actual operations starting in the new year.

Until the commissioning has been done, no one actually knows whether the link as such has been completed, the whole point of the commissioning is exactly to establish this as a fact (possibly after hardware interventions that the commissioning demonstrates are necessary).

So until we have a WP:RS that the commissioning is done, we cannot write that the cable is complete. And actual operations is when the first electricity is delivered as part of a delivery contract w. payment. Lklundin (talk) 10:38, 6 September 2023 (UTC)Reply