Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2a63fe8e9e0cf67

Jump to content

Talk:Thorold Tunnel

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 20 years ago by Qviri in topic construction

construction

[edit]

This just occurred to me -- does anyone know if during construction they were digging under the existing canal, or did they wait until winter when shipping season was over, block off and drain a section of the canal, dig the tunnel in the bottom and then cover it up? The former makes more sense, especially when considering that the tunnel also passes under some service reservoirs, but the presence of a downhill lock nearby would make potential draining simplified...

Just out of curiosity, and to make sure what I wrote on Townline Tunnel (... the Thorold Tunnel had to be dug underneath the existing waterway) is correct. --qviri 09:10, 8 November 2005 (UTC)Reply