Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a22fc0a5f93f4e12

Jump to content

Talk:Spot contract

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 14 years ago by Nekiko in topic The example doesn't mention the subject

UFH and cost of carry can't work at same time?

[edit]

(moved from User talk:Garylhewitt)

Gary: On spot price, you seem to be saying that both the unbiased forward hypothesis and the cost of carry model can't be true at the same time. Am I reading this right? If so I don't agree. Smallbones 15:03, 23 December 2005 (UTC)Reply

I see how that this opposition might be implied by separating those paragraphs. Not my intention, so it makes sense to disentangle the models from the contrasting cases of perishable vs. unperishable commodities. The basic idea in this context is that spot prices may or may not already carry an estimate of future spot prices; the perishable commodity case is just the extreme (carrying cost -> commodity price) case of the cost-of-carry model. Maybe put the base case (zero carry cost, non-perishable) first -> spot price already contains future price estimate; vs. extreme case (high carry cost, perishable); spot price doesn't reflect future price estimate. Gary 16:46, 23 December 2005 (UTC)Reply

Is spot rate effective annual rate?

[edit]

Is spot rate the effective annual rate (EAR), or bond equivalent rate (APR), or the period effective rate? Feel free to change this. and remove my signature. For example, a spot rate for a 6 months bond. How is the spot rate calculated?

EAR=(P1/P0)^2-1
APR=(P1/P0-1)*2
effective rate=P1/P0-1

Similarly, If the term is 18 months, how is the spot rate quoted? Jackzhp 00:53, 12 October 2006 (UTC)Reply

HOW TO CALCULATE A ZERO RATE? AND WHAT IS THE MEANING OF THAT WORD? —Preceding unsigned comment added by 134.155.36.20 (talk) 16:20, 6 May 2008 (UTC)Reply

The example doesn't mention the subject

[edit]

The example doesn't actually mention the term "Spot price" anywhere. Please improve the example to explain what part of it is meant to exemplify the spot price. — Preceding unsigned comment added by Nekiko (talkcontribs) 22:42, 18 September 2011 (UTC)Reply