Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a265089f0babcf7b

Jump to content

Talk:SAm-1

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 14 years ago by 190.16.105.121

Does the Las Toninas -Valparaíso leg go submarine or through the andes? Max Legroom (talk) 15:25, 16 August 2010 (UTC)Reply

To answer your question you can look in this schematic map, which appears to imply that the cable goes thru the Andes. --190.16.105.121 (talk) 21:47, 10 November 2011 (UTC)Reply


Another issue is who ordered, built and operates the cable. In the linked documents from the FCC it's clear that Telefónica is the one seeking permission to build it, and it's safe to assume the operate it, but they might have local affiliates for each part of the construction, I don't know about that but verifiable information could be added to the article.

--190.16.105.121 (talk) 21:46, 10 November 2011 (UTC)Reply