Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23d6a1dfe2fcf79

Jump to content

Talk:Port Walcott

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 2 years ago by 2406:5A00:BC23:4300:DCC1:36E8:3B6:C129 in topic Port Walcott Upgrades

Port Walcott Upgrades

[edit]

Rio Tinto started a port, rail and mine upgrade in 2012. This include a brand new ore handling facility at Cape Lambert and a second, 4 berth ore wharf approximately 1 kilometer west of the of the existing 4 berth wharf. This took capacity through Cape Lambert to about 203 M tonnes annually by 2015 2406:5A00:BC23:4300:DCC1:36E8:3B6:C129 (talk) 08:28, 22 August 2023 (UTC)Reply