Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a25729434c938cc1

Jump to content

Talk:Orbiter Processing Facility

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 15 years ago by Rod57 in topic How long does processing take

4 shuttles, 3 bays?

[edit]

Can anyone make any mention of how the 3-bay system worked when there were still 4 shuttles in the fleet? —Fumo7887 (talkcontribs) 13:57, 9 August 2006 (UTC)Reply

I was wondering that. Wheter one would be stored in the VAB or something. Maybe they just hoped that one would always be out somewhere else. --GW_SimulationsUser Page | Talk 14:25, 4 November 2006 (UTC)Reply
I think 2 shuttles had to share the same hangar! LOL
I'd just like to post on this again saying that no information has come forth yet. I think this is a huge piece of historical information that should be added if it can be found. Anybody firmiliar with this that either knows the info or knows where it could be found? —Fumo7887 (talkcontribs) 17:44, 25 August 2007 (UTC)Reply
Wouldn't those people have answered you think? I'll take a look around, but my google powers are probably as strong as yours :D --TheDJ (talkcontribs) 00:21, 12 November 2007 (UTC)Reply

I agree, even finding the answer on google would not be sufficient, I think that information belongs here. I would also like to see the information on what the plan is for these buildings when there is no more shuttle fleet. Boufa (talk) 19:54, 10 August 2009 (UTC)Reply

How long does processing take

[edit]

Are there typical or example schedules of orbiter processing showing major tasks, elapsed time, manpower requirements, time and material costs ?

How many people have been employed in the OPF at various times ? Rod57 (talk) 11:36, 9 March 2011 (UTC)Reply