Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a224e38eaa3e258a

Jump to content

Talk:Merchants Bridge

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 8 years ago by 74.112.104.250

The bridge was not completed in 1889. The last span connected with the east pier a day or two before the end of the year. [1]

The formal opening of the bridge occurred on Saturday, 3 May 1890, with imposing ceremonies. [2]

74.112.104.250 (talk) 14:26, 7 July 2018 (UTC)Reply

  1. St. Louis Post- Dispatch, 1 Jan 1890, page 2.
  2. St. Louis Post- Dispatch, 4 May 1890, page 20.