Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a25113f65fef8020

Jump to content

Talk:Gridlink Interconnector

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 1 year ago by 194.156.223.33 in topic Old technical Data

Old technical Data

[edit]

According to the latest TYNDP, the DC voltage will be 320kV and the transmission capacity 1250MW

TYNDP 2024 Project Collection 194.156.223.33 (talk) 11:50, 30 July 2025 (UTC)Reply