Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a226a0aa1b204b2a

Jump to content

Talk:GWR 2251 Class

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 3 years ago by Redrose64 in topic The first shall be last

Pulling power

[edit]

How many trucks or coaches could these guys pull? I'm asking because I'm writing a story where one of these engines thinks that she herself is stronger than what she was told. Dinoboyaz (talk) 12:52, 22 January 2013 (UTC)Reply

It would depend upon several factors, mainly the gradients on the route and the proportion of vehicles connected to the continuous brake. The railways produced documents with names like "Sectional Appendix to the Working Timetable", showing permitted loads for different types of locomotive over various routes. --Redrose64 (talk) 14:29, 22 January 2013 (UTC)Reply

The first shall be last

[edit]

I can source my claim Nos. 3218 and 3219 were delivered in January 1948, the first locomotives built at Swindon for British Railways. but what I can't source is my opinion that nos. 3218 & 3219 were the only 0-6-0s built for BR, and thus the last of that wheel arrangement built for use in Great Britain. --Redrose64 🌹 (talk) 20:26, 10 August 2022 (UTC)Reply