Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2502fa90fa94603

Jump to content

Talk:Future Combat Air System

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 1 month ago by Arado in topic Cancellation

Weight info

[edit]

"the NGF is projected to be 40 metric tons" claims https://aviationweek.com/defense/budget-policy-operations/france-envisions-larger-future-aircraft-carrier-more-uas They don't give a source for this (it doesn't read as if the article is a verbatim transscript of the interview with Adm Vaujour), and a few lines on they say that the EMALS catapult system allows planes between two and 40 tons to be launched, so I'm not sure if they just deducted that from this number or if they had indeed another info directly on NGF (which is how it reads). Just for comparison, that would be a tad heavier than the F-15EX. In any case, a new info that could be put into the article (not sure where, as we have no tech specs paragraph yet).--OBrian (talk) 20:49, 12 September 2025 (UTC)Reply

Combat Fighter System Nucleus

[edit]

Mentioned here: https://www.euronews.com/2025/11/17/is-europes-mega-defence-project-fcas-in-danger-of-failing-over-germany-france-disagreement Kaihsu (talk) 17:35, 11 April 2026 (UTC)Reply

Cancellation

[edit]

Only the manned fighter was canceled. The Combat Cloud will continue to be developed.@Arado Arado (talk) 06:21, 9 June 2026 (UTC)Reply