Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a25122711b3ec235

Jump to content

Talk:Fluxys

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 8 months ago by Tristandlc in topic page update
[edit]

Hello fellow Wikipedians,

I have just modified one external link on Fluxys. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 5 June 2024).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 00:08, 3 October 2017 (UTC)Reply

A Commons file used on this page has been nominated for deletion

[edit]

The following Wikimedia Commons file used on this page has been nominated for deletion:

Participate in the deletion discussion at the nomination page. —Community Tech bot (talk) 18:22, 15 August 2018 (UTC)Reply

page update

[edit]

Hello, I was contacted by Fluxys to update and complete this article as part of a paid contribution. I try to strictly adhere to the principles of neutrality and to rely solely on reliable and independent secondary sources. If you have any concerns about certain additions, please feel free to let me know here or on my discussion page—I will be available to discuss them and make the necessary corrections. Thank you in advance. Tristandlc (talk) 15:35, 27 November 2025 (UTC)Reply

Hello, here are the changes I would like to make to this page. This is the complete text, so it may be a bit difficult to read. I have done my best to indicate the sources. Of course, I will add internal links to Wikipedia when the page is published. Any feedback is welcome.
Thank you in advance! Tristandlc (talk) 15:37, 28 November 2025 (UTC)TristandlcReply
Fluxys
Infobox
Creation : 1929
Company type Public : limited company
Enterprise number : 0827.783.746
Slogan : Shaping together a bright energy future
Services : Transmission, storage and LNG-terminalling infrastructure
Headquarters : Brussels, Belgium
Shareholders : Publigas (77.43%), EIP (15.22%), SFPIM (3.44%), AG Insurance (1.97%), Ethias (1.32%), personnel and management (0.62%)
Key people : Pascal De Buck (CEO)(1), Andries Gryffroy (Chairman)(2)
Affiliates : Fluxys Belgium, Fluxys hydrogen, Fluxys c-grid, Fluxys c-grid Antwerpen, Nextgrid Holding, Interconnector, Dunkerque LNG, Fluxys TENP, Fluxys Byte-it, GMSL, Fluxys Deutschland, FluxSwiss, Fluxys Brasil, Fluxys Chile (non-exhaustive list)
Headcount : 1 381 employees (2024)(3)
Turnover : €1 267 million (2024)
Net profit : €337 million (2024)
Website : www.fluxys.com
Fluxys is an infrastructure group based in Belgium, active in the transmission, storage, and terminalling of natural gas, biomethane, hydrogen, and CO2.
Since the early 2000s, the Fluxys group has expanded its activities beyond Belgium's borders and is now present in Germany, the Netherlands, the United Kingdom, Greece, Switzerland, France, Albania, and Portugal. More recently, the group has become active outside Europe, with holdings in Brazil, Chile, and Oman.
Through its subsidiaries and holdings in various companies, Fluxys operates 28,000 kilometers of pipelines, LNG terminals with a total annual regasification capacity of 485 TWh, and underground natural gas storage facilities with a total capacity of 1.5 billion m³.
Due to reduced production from the Groningen gas field in the Netherlands, Belgium had to switch from low-calorific gas (L-gas) to high-calorific gas (H-gas). The conversion of all affected customers, which began in 2018, was completed by the end of summer 2024, five years earlier than initially planned.
In Belgium, Fluxys' counterpart for the electricity grid is Elia.
History
In Belgium, the purchase, sale, storage, transmission of natural gas and LNG-terminalling activities were historically handled by Distrigaz, a company founded in 1929. In March 2001, the European Commission published a proposal to accelerate the opening up of the internal gas market(4). On 16 July 2001, the Belgian Federal Parliament approved several amendments to the Gas Act of 29 April 1999(5).
On 30 November 2001, the partial demerger of Distrigaz led to the creation of Fluxys. At the time, Fluxys' shares were held by Belgian Shell, Tractebel (a subsidiary of Suez), Fluxhold and Publigaz (a holding company owned by Belgian municipalities), while 16.71% of the shares were listed on the Euronext Brussels Regulated Market. The Belgian State held a specific share, known as a golden share(6).
In 2010, 89.97% of the shares were held by Publigas, while the remainder (10.03%) were traded on the secondary market of Euronext Brussels. That same year, the group's structure was revised to take into account the latest developments in Belgian legislation, following the Third Energy Package of legislative measures regarding the independence of network operators from natural gas suppliers(7).
In March 2011, the Caisse de dépôt et placement du Québec (CDPQ) acquired a 10% stake in Fluxys G, the parent company of Fluxys, through a €150 million capital increase(8).
On 8 May 2012, Fluxys changed its name to Fluxys Belgium. Regulated by law, Fluxys Belgium is a natural monopoly; it is solely responsible for managing the Belgian gas infrastructure. The government has appointed CREG, the Commission for the regulation of Electricity and Gas, as the regulator for setting tariffs. The parent company Fluxys G was renamed Fluxys(9).
At the end of 2012, Fluxys carried out a capital increase of more than €140 million. The Federal Participation and Investment Company (SFPIM) acquired a stake of approximately 2% in the company(10).
Since the early 2000s, the Fluxys group has been present in several countries with holdings including:
In the United Kingdom: Interconnector pipeline in 2004 and GMSL company in 2002(11)
In the Netherlands: BBL pipeline in 2006(12)
In France: Dunkerque LNG regasification terminal in 2011(13)
In Switzerland: FluxSwiss company in 2011
In Germany: NEL and TENP pipelines in 2011, EUGAL in 2017(14), and OAL in 2024, OGE company in 2023(15)
In Albania: TAP pipeline in 2013(16)
In Greece: DESFA company(17) in 2018 and TAP pipeline in 2013(18)
In Portugal: Fluxys Byte It ICT service center in 2024.
Since the 2020s, the group has become active with holdings in Brazil (TBG pipeline in 2021), Chile (Quintero LNG regasification terminal in 2022), and Oman (OQGN company in 2023)(19).
At the end of 2022, Energy Infrastructure Partners (EIP), AG Insurance, Ethias and the Société Fédérale de Participations et d'Investissement have acquired CDPQ's shares in Fluxys(20).
Shareholders (situation on 31 December 2024)
Publigas-Publigaz : 77.43%
Energy Infrastructure Partners : 15.22%
AG Insurance : 1.97%
Ethias : 1.32%
SFPIM : 3.44%
Personnel and Management : 0.62%
Zoom on a few projects
In mid-2013, Fluxys acquired a 16% stake in the Trans Adriatic Pipeline (TAP), which transports natural gas from Azerbaijan to Europe via Turkey, Greece and Italy. In September 2014, Fluxys increased its stake by 3% to 19% and in January 2023 by 1% to 20% following the acquisition of the AXPO stake(21). Work began in 2016, and the first gas flowed through the pipeline at the end of 2020. The initial capacity is about 10 billion m³ per year and can be increased to 20 billion in function of market developments.
Fluxys holds a 16.5% stake in the EUGAL (European Gas Pipeline Link) project in Germany. The two gas pipelines transport gas from northern Germany to the border with the Czech Republic. Construction of the first gas pipeline began in August 2018 and the second in mid-2019. The pipeline was commissioned between 2020 and 2021(22).
Between 2023 and 2025, Fluxys Belgium worked on doubling its pipeline between Zeebrugge and Brussels to increase natural gas transport capacity both to the hinterland and to Germany, while also enabling the transport of hydrogen(23).
Role in the energy transition
Fluxys develops infrastructure for the transport of hydrogen, CO₂, and biomethane. In 2019, Fluxys partnered with Colruyt Group on a project to install a 25 MW (expandable) electrolyser plant to convert offshore wind power into hydrogen at industrial scale. Fluxys has since withdrawn from the Hyoffwind project(24).
At the end of 2023, Germany decided to build a central hydrogen network (Kernnetz) covering nearly 9,000 km by 2032. The plans were drawn up by FNB Gas, the German association of gas transmission system operators, in which OGE, Fluxys TENP and Fluxys Deutschland play an active role(25).
On 26 April 2024, Fluxys hydrogen (subsidiary of Fluxys Belgium), is appointed as the operator responsible for developing and operating Belgium's hydrogen transmission network(26).
On 23 October 2024, the first volumes of biomethane produced by Green Logix Biogas in Lommel are injected directly into Fluxys Belgium's natural gas transmission network(27).
In mid-2025, Fluxys Belgium, Pipelink and Air Liquide join forces within Fluxys c-grid Antwerp, a joint venture that is currently building a network of CO₂ pipelines in the Antwerp port area, with a view to connecting industrial players to permanent underground storage solutions.
Fluxys is involved in CO2 export projects in Belgium (Antwerp@C(28) & Zeebrugge CO2 Highway Europe(29)) and abroad (in the port of Dunkirk – D’Artagnan(30))
Early 2025, Fluxys established Nextgrid Holding in partnership with Publi-T(31). Through Nextgrid Holding, the Fluxys group holds a minority stake in the Belgian electricity transmission group Elia.
References
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
25)
26)
27)
28)
29)
29)
30) Tristandlc (talk) 15:37, 28 November 2025 (UTC)Reply