Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23f7977dacaf54b

Jump to content

Talk:Evidence-based scheduling

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 17 years ago by Irrevenant in topic Recreation of Page

Recreation of Page

[edit]

The previous page describing the approach was deleted on the grounds of it being blatant advertising (Spolsky's company sells a tool which includes it as a feature). It was recreated on the grounds that this technique is an important software engineering technique for the community and Spolsky's original blog posting [1] of the idea is sufficiently clear for anyone to implement it. --Andy Dent, Jan 31, 02009. [Note: I moved this here from the article page --Irrevenant [ talk ] 12:26, 6 March 02009 (UTC)]

References

  1. , Evidence-based Scheduling blog posting 2007

Montecarlo techniques

[edit]

Another important property of Joel's exposition on EBS is the use of Monte Carlo techniques to provide a statistical distribution of schedule times, rather than a single schedule.

  • Agreed. I came here to say exactly the same thing. I've added a comment to the page to that effect. --Irrevenant [ talk ] 12:26, 6 March 02009 (UTC)