Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a21e6a24f840962d

Jump to content

Talk:EMD SW1

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 1 year ago by 2600:1700:F3D0:23A0:8D8B:3C2A:ABC2:625E in topic SP 1000 Inconsistencies

Untitled

[edit]

Someone should disambig the link to Union Railroad - I have no idea which one is meant. --SPUI (talk) 08:56, 7 May 2005 (UTC)Reply

The first EMC SW1 is the #755 Demonstrator built in December 1938. It was sold to Inland Steel as their #51. Source A.J.Kristopans EMD Serial Number Page http://community-1.webtv.net/ajkristopans/SWITCHERS201Aand567/ --207.69.137.21 17:11, 15 October 2005 (UTC)Reply

Infobox

[edit]

Dorin, Patrick C. (1972). Chicago and North Western Power. Superior Publishing. p. 96. ISBN 0-87564-715-4. has C&NWRy drawings and spec sheets for their loco’s, that’s where most of this comes from. Sammy D III (talk) 18:54, 22 August 2013 (UTC)Reply

Removed the Ballard Terminal Railroad

[edit]

They are not an original owner of this model. Their unit is ex Milwaukee Road, as evidenced by the article's own citations and the Wikipedia's entry for the switching road.  Preceding unsigned comment added by 2604:6000:A645:2100:68B0:A887:A5DB:349C (talk) 11:31, 3 June 2017 (UTC)Reply

Mechanical Details

[edit]

It may be worth noting in a separate section of this article or in the powertrain section that the SW1 does not feature a notched throttle, or at least originally they didn’t. Several models of EMD switchers came this way, featuring an air throttle rather than a notched throttle. Perhaps this is an irrelevant detail that only train geeks like me would really care about, but it was very interesting to find this detail out when I operated Southern Pacific 1006 for the first time. Anyway, should this be added? What does everyone think? GenesisFan99 (talk) 16:07, 15 March 2022 (UTC)Reply

If you can find a reliable source backing this up, it might be worthwhile to mention as part of maybe 1 sentence. We don't want to give disproportionate weight to details. Trainsandotherthings (talk) 00:33, 16 March 2022 (UTC)Reply

SP 1000 Inconsistencies

[edit]

One sentence says that Holly Sugar 1 was built as SP 1000. Another says that SP 1000 was originally demonstrator 804, which would mean that Holly Sugar was built as demonstrator 804. Separately, there is a parenthetical note that SP 1000 is "pictured above" but no picture of SP 1000 is present.  Preceding unsigned comment added by 2600:1700:F3D0:23A0:8D8B:3C2A:ABC2:625E (talk) 18:49, 12 January 2025 (UTC)Reply