Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a227a5281e378a31

Jump to content

Talk:Dual electrification

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 2 years ago by Johnson.Xia in topic Both systems live

Track versus train

[edit]

I have removed the section beginning: "The building of the Channel Tunnel between England and France required triple electrification of the motive power..." This is not relevant to double electrification of the track. Biscuittin (talk) 18:41, 8 June 2012 (UTC)Reply

Dual Electrification

[edit]

The term "double electrification" is one that I have never come across in over 20 years of designing electric traction systems. The term "Dual Electrification" is a recognised term. If this article is to remain (dubious), then it really needs to be renamed. --Bhtpbank (talk) 10:41, 31 July 2012 (UTC)Reply

I agree. Here is a link. Roberttherambler (talk) 23:55, 7 August 2017 (UTC)Reply

Both systems live

[edit]

"Premagnetisation of the substation transformers of the AC system can occur". I don't see how, because there is no electrical connection between the third rail and the overhead line, and premagnetisation seems to be a good thing anyway. I always thought the objection to dual electrification was possible interference with signalling track circuits. When the traction supply is DC, the track circuits are AC and vice-versa. If there are both AC and DC traction supplies, then one of them is liable to interfere with the track circuits. Roberttherambler (talk) 08:50, 8 August 2017 (UTC)Reply

A Neutral Zone between 2 sections will solve this. A recent example would be Jiangtiao line in Chongqing, CN. Johnson.Xia (talk) 17:18, 28 May 2024 (UTC)Reply