Talk:Cairo Metro Line 1
Add topic| This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||
|
This article contains broken links to one or more target anchors:
The anchors may have been removed, renamed, or are no longer valid. Please fix them by following the link above, checking the page history of the target pages, or updating the links. Remove this template after the problem is fixed | Report an error |
Missing Line 1 extension
[edit]Missing from this article is a the possible Line 1 extension from New El Marg to city of Shebin al-Qanater
This is discussed here by Egypt's National Authority of Tunnels. I think Egypt are in a feasibility study with Spain.
http://www.nat.gov.eg/LocationActivity.aspx?id=2114
The first line will be extended from New Marg north to Shubra El-Kheima, with a length of about 19 km (5.6 miles) and 14 stations. The 23 July - Shubra El-Kheima railway line will be cancelled and replaced with a modern, fast, safe and environmentally friendly means of transportation.
