Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2391d5e0bd8efad

Jump to content

Talk:CE-20

Page contents not supported in other languages.
Add topic
From Wikipedia, the free encyclopedia
Latest comment: 10 years ago by 69.72.92.102 in topic garbled sentence

Removed Current Status section

[edit]

The section content was misleading and not relevant to the article. The readers could have assumed that CE-20 was used in this launch instead of CE-7.5. It was also not written in a proper article fashion. --Suchakra (talk) 18:13, 10 January 2014 (UTC)Reply

A lot of details can be found here

[edit]

garbled sentence

[edit]

In Overview the sentence starting "ISRO tested" is garbled. I suggest (assuming the date is correct): ISRO tested the CE-20 on April 28, 2015 at Mahendragiri test facility with a successful long duration hot test (635 seconds). 69.72.92.102 (talk) 07:26, 9 September 2015 (UTC)Reply