Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a22ec5900cf65a3a

Jump to content

// Workers AI · dad joke modeWhat did the Strand underpass say? "I'm strung under pressure".

Entrance to the underpass from Waterloo Bridge

The Strand underpass is a one-way road tunnel in central London connecting Waterloo Bridge to Kingsway near Holborn. Opened in 1964, it was built within the former Kingsway tramway subway, which closed in the 1950s. It is open to motor vehicles, pedestrians and horse riders but not cyclists as indicated on signs.

History

[edit]

The underpass is built within part of the former Kingsway tramway subway, which was 20 feet (6.1 m) wide and allowed bi-directional flow because of the fixed rails and relatively narrow width of the trams. The new underpass was built by John Mowlem & Co[1] and opened on 21 January 1964. It is only 17 feet (5.2 m) wide and, as a result, it is normally one-way northbound because of the side clearances required. The headroom is only 12.5 feet (3.8 m) due to the tunnel having to pass beneath the bridge abutment by a 1:12 gradient. An electronic 'eye' alerts drivers of tall vehicles and diverts them to an 'escape route' to the left of the entrance. However, high vehicles do still try to pass through and so get stuck occasionally.

Inside the underpass

The underpass is a concrete box within the former tram subway, with the road surface at the original track level. At the northern end of the underpass the road rises to the surface on a new carriageway supported by metal pillars. This passes through the site of the former Aldwych tramway station; because of the greater width requirement, 27 trees and some pavement sections were removed for it to be constructed.

The tunnel was used by the 521 bus route northbound until it was withdrawn in April 2023. In 2012, the direction of traffic in the tunnel was temporarily reversed, so that it was in use by southbound traffic. This was to facilitate easier traffic flow during the 2012 Summer Olympics.

References

[edit]
  1. Mowlem 1822–1972 – Mowlem Public Relations brochure, 1972, p. 6

51°30′59.7″N 0°07′07.9″W / 51.516583°N 0.118861°W / 51.516583; -0.118861