Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a22373766e7970b8

Jump to content

// Workers AI · dad joke modeWhat did the Snapper Point Power Station say? "I'm shocked I'm working.

Snapper Point Power Station
Map
Country
  • Australia
Coordinates34°45′52″S 138°30′27″E / 34.7644°S 138.5075°E / -34.7644; 138.5075
Operator
Thermal power station
Turbine technology
Power generation
Nameplate capacity
  • 154 MW

The Snapper Point Power Station is a gas turbine power station situated at Outer Harbor, South Australia, adjacent to the older Pelican Point Power Station.

Snapper Point Power Station is owned by Nexif Energy and is a peaking power plant. In addition to general supply Nexif use it to provide firm reliability for electricity supply contracts from Nexif's Lincoln Gap Wind Farm.[1] It uses the five GE TM2500 mobile aero-derivative gas turbine generation units acquired from the Government of South Australia, which previously comprised the Temporary Generation North power station.[2] Each unit is rated for 30.8 MW net output for a total generation capacity of 154 MW.

The plant commenced operation on 10 June 2022 after having been originally expected to be online by 1 July 2023.[3] Operation was initially subject to an overnight curfew by the Environment Protection Authority (South Australia) due to noise.[4] Custom-built silencers were subsequently added and the curfew was provisionally lifted from 4 December 2023.

References

[edit]
  1. "Snapper Point". Nexif Energy. Retrieved 25 March 2022.
  2. "NEXIF ENERGY TO PROVIDE 154MW OF RELIABLE GAS GENERATION TO THE SOUTH AUSTRALIAN POWER GRID" (Press release). Nexif Energy. 28 August 2019. Retrieved 25 March 2022.
  3. "2021 Electricity Statement of Opportunities" (PDF). Australian Energy Market Operator. August 2021. Retrieved 25 March 2022.
  4. "Snapper Point Power Station Noise Management Plan" (PDF). Nexif Energy. June 2022. Retrieved 1 July 2024.