Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a446dfd3b8aa0abb

Jump to content

Sabey Data Centers

From Wikipedia, the free encyclopedia

Sabey Data Centers
TypePrivate
IndustryData centers
Headquarters
Tukwila, Washington
,
United States
Key peopleTim Mirick (President)
ParentSabey Corporation
Websitesabeydatacenters.com

Sabey Data Centers is a United States-based company engaged in the development, ownership and operation of multi-tenant data centers. It is the data-center business unit of Sabey Corporation, a privately held real-estate and development group based in Tukwila, Washington.[1] The company reports managing more than 3.5 million square feet of data center space and nearly 400 megawatts of capacity across the U.S.[2]

History

[edit]

Sabey Corporation was founded in 1972 by Dave Sabey and initially focused on commercial real estate development and construction across the Pacific Northwest.[1] The dedicated data-center business emerged in the 2000s and grew through acquisitions and new campus developments.

In June 2011, Sabey acquired the 32-story former Verizon/NY Telephone building at 375 Pearl Street in Manhattan and began its conversion into an urban data-center facility.[3][4] The retrofit opened in 2013.[5]

In April 2020, Sabey issued US$800 million of securitized notes backed by data-center revenues to refinance debt and support expansion.[6][7]

On January 1, 2025, Sabey announced that Tim Mirick would assume the role of president of Sabey Data Centers, succeeding Rob Rockwood.[8]

Structure and ownership

[edit]

Sabey Data Center Properties, LLC is the joint-venture entity between Sabey Corporation and National Real Estate Advisors that owns and operates the data-center assets.[9] In September 2023, the joint venture announced plans for a 100 MW+ campus in Umatilla, Oregon.[10]

Operations

[edit]

Sabey develops and operates carrier-neutral multi-tenant colocation facilities, powered-shell and build-to-suit data centers.[11] Its operations emphasise energy efficiency, modular build-to-suit capability, and a vertically integrated design-build-operate model. A case study by the New York State Energy Research & Development Authority (NYSERDA) documents efficiency upgrades at the Intergate Manhattan facility.[12]

Locations

[edit]

As of 2025, Sabey lists campuses or facilities in the following U.S. markets:

  • Seattle, Washington (formerly Intergate.East): 1.2 million square feet across multiple buildings and 54 MW of capacity. Originally developed (and purchased) by American aerospace company Boeing, but repurchased by Sabey in 1999.[13]
  • Quincy & East Wenatchee, Washington (Intergate): Columbia River region campuses powered primarily by hydroelectricity.
  • Ashburn, Virginia:Third building under construction in 2025, targeting 54 MW for that building and ~85 MW total campus capacity.[14][15]
  • New York City: Intergate Manhattan at 375 Pearl Street, a retrofitted telecom building opened in 2013.[5]
  • Austin metro, Texas (Round Rock): Campus completed first building in October 2024 with 430,000 sq ft and up to 84 MW critical power.[16][17]
  • Umatilla, Oregon: Planned 60-acre, 100 MW+ site in development.[10]

Notable projects

[edit]
  • Intergate Manhattan (375 Pearl Street), New York City — Urban retrofit project converting a former telecom building into a modern data-center facility.[3]
  • SDC Austin (Round Rock), Texas — Campus supporting high-density workloads and liquid cooling, up to 84 MW build-out.[18]

Finance

[edit]

In 2020, Sabey issued approximately US$800 million in securitized notes backed by tenant leases to raise capital for expansion.[6]

Sustainability

[edit]

Sabey emphasises design for energy efficiency and modularity. A NYSERDA case study documents efficiency upgrades at the Intergate Manhattan site.[12] In October 2025, the company announced 70 MW of additional capacity across six U.S. campuses.[19]

Community and regional impact

[edit]

In 2025, a proposed Sabey-affiliated data-center project near San Marcos, Texas, drew local scrutiny over water-supply and environmental impacts.[20]

Sabey is reported to be leasing ICE office space in Tukwila.[21]

See also

[edit]

References

[edit]
  1. 1 2 "About". Sabey Corporation. Retrieved October 21, 2025.
  2. ↑ "Data centers that do more". Sabey Corporation. Retrieved October 21, 2025.
  3. 1 2 "Sabey Acquires Huge Verizon Building in NYC". Data Center Knowledge. June 8, 2011. Retrieved October 21, 2025.
  4. ↑ "Lipstick on a Bunker: 375 Pearl Bought by Seattle Data Centrists". The New York Observer. June 8, 2011. Retrieved October 21, 2025.
  5. 1 2 "Sabey Opens High Rise Manhattan Data Tower". Data Center Knowledge. March 21, 2013. Retrieved October 21, 2025.
  6. 1 2 Moss, Sebastian (May 1, 2020). "Sabey Data Centers issues \$800 million in securitized notes". Data Center Dynamics. Retrieved October 21, 2025.
  7. ↑ "Sabey Data Centers Lines up \$800 Million to Fund Growth". Data Center Frontier. April 30, 2020. Retrieved October 21, 2025.
  8. ↑ "Sabey Data Centers Announces New President" (Press release). Business Wire. January 16, 2025. Retrieved October 21, 2025.
  9. ↑ "National Data Center Fund". National Real Estate Advisors. Retrieved October 21, 2025.
  10. 1 2 "National and Sabey Data Center Properties announce new data center campus in Umatilla, Oregon". National Real Estate Advisors. September 18, 2023. Retrieved October 21, 2025.
  11. ↑ "History & values". Sabey Data Centers. Retrieved October 21, 2025.
  12. 1 2 "Intergate Manhattan case study" (PDF). NYSERDA. 2017. Retrieved October 21, 2025.
  13. ↑ Swinhoe, Dan (April 24, 2025). "Sabey to bring additional capacity online at two Washington campuses". Data Center Dynamics. Retrieved October 21, 2025.
  14. ↑ "Sabey breaks ground on third building at Ashburn, Virginia, campus". Data Center Dynamics. June 26, 2025. Retrieved October 21, 2025.
  15. ↑ "Sabey expands in Ashburn with first three story data center". Converge! Network Digest. June 26, 2025. Retrieved October 21, 2025.
  16. ↑ "Sabey Data Centers completes construction at Austin, Texas data center site". Sabey Data Centers. October 17, 2024. Retrieved October 21, 2025.
  17. ↑ "Sabey starts work on second data center at Texas campus in Austin". Data Center Dynamics. July 30, 2025. Retrieved October 21, 2025.
  18. ↑ "TACC Selects Sabey Data Centers in Round Rock as Colocation Partner for New Supercomputer". Business Wire. August 26, 2024. Retrieved October 21, 2025.
  19. ↑ "Sabey offering more capacity and power at six U.S. data centers". Data Center Dynamics. October 17, 2025. Retrieved October 21, 2025.
  20. ↑ "Plans call for third data center in growing Hill Country cluster". San Antonio Express-News. June 2, 2025. Retrieved October 21, 2025.
  21. ↑ Álvarez, Gustavo Sagrero (February 12, 2026). "ICE eyes new Tukwila office near hub for deportation flights". www.kuow.org. Retrieved February 19, 2026.