Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a41194f008ddf557

Jump to content

STS-46

From Wikipedia, the free encyclopedia

STS-46
Atlantis's Canadarm grapples the European Space Agency's EURECA satellite, prior to its deployment.
NamesSpace Transportation System-46
Mission typeEURECA satellite deployment
TSS-1 operation
Technology research
OperatorNASA
COSPAR ID1992-049A Edit this at Wikidata
SATCAT no.22064Edit this on Wikidata
Mission duration7 days, 23 hours, 15 minutes, 2 seconds
Distance travelled5,344,643 km (3,321,007 mi)
Orbits completed127
Spacecraft properties
SpacecraftSpace Shuttle Atlantis
Launch mass116,134 kg (256,032 lb)
Landing mass94,676 kg (208,725 lb)
Payload mass12,164 kg (26,817 lb)
Crew
Crew size7
Members
Start of mission
Launch dateJuly 31, 1992, 13:56:48 (1992-07-31UTC13:56:48Z) UTC (9:56:48 am EDT)
Launch siteKennedy, LC-39B
ContractorRockwell International
End of mission
Landing dateAugust 8, 1992, 13:11:50 (1992-08-08UTC13:11:51Z) UTC (9:11:50 am EDT)
Landing siteKennedy, SLF Runway 33
Orbital parameters
Reference systemGeocentric orbit
RegimeLow Earth orbit
Perigee altitude425 km (264 mi)
Apogee altitude437 km (272 mi)
Inclination28.46°
Period93.2 minutes
Instruments
  • Consortium for Materials Development in Space Complex Autonomous Payload (CONCAP II and CONCAP III)
  • Evaluation of Oxygen Integration with Materials/Thermal Management Processes (EOIM-III/TEMP 2A)
  • IMAX Cargo Bay Camera (ICBC)
  • Limited Duration Space Environment Candidate Materials Exposure (LDCE)
  • Pituitary Growth Hormone Cell Function (PHCF)
  • Ultraviolet Plume Instrument (UVPI)

STS-46 mission patch

Standing: Ivins, Nicollier, Hoffman, Chang-Díaz and Malerba
Seated: Allen and Shriver
← STS-50 (48)
STS-47 (50) →

STS-46 was a NASA Space Shuttle mission using Atlantis and was launched on July 31, 1992, and landed on August 8, 1992.

Crew

[edit]
Position Astronaut
Commander United States Loren Shriver
Third and last spaceflight
Pilot United States Andrew M. Allen
First spaceflight
Mission Specialist 1 Switzerland Claude Nicollier, ESA
First spaceflight
Mission Specialist 2
Flight Engineer
United States Marsha Ivins
Second spaceflight
Mission Specialist 3 United States Jeffrey A. Hoffman
Third spaceflight
Mission Specialist 4 United States/Costa Rica Franklin Chang-Díaz
Third spaceflight
Payload Specialist 1 Italy Franco Malerba, ASI
Only spaceflight
Robert L. Gibson had originally been selected to command STS-46, however, after he was involved in an air-race collision, he was suspended from training for this mission.[1] Gibson would fly again on STS-47.
Backup crew
Position Astronaut
Payload Specialist 1 Italy Umberto Guidoni, ASI

Crew seat assignments

[edit]
Seat[2] Launch Landing
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1 Shriver
2 Allen
3 Nicollier Hoffman
4 Ivins
5 Hoffman Nicollier
6 Chang-Díaz
7 Malerba

Mission highlights

[edit]

Mission's primary objectives were the deployment of ESA's European Retrievable Carrier (EURECA) and the joint NASA/Italian Space Agency Tethered Satellite System (TSS). EURECA was deployed a day later than scheduled because of a problem with its data handling system. Seven and a half hours after deployment, the spacecraft's thrusters were fired to boost EURECA to its planned operating altitude of around 31O miles. However, thruster firing was cut to six minutes from 24 minutes because of unexpected attitude data from the spacecraft. The problem was resolved and EURECA was successfully boosted to its operational orbit on the mission's sixth day. TSS deployment also was delayed one day because of the problems with EURECA. During deployement, the satellite reached a maximum distance of only 86O feet from the orbiter instead of the planned 12.5 miles because of a jammed tether line. After numerous attempts over several days to free the tether, TSS operations were curtailed and the satellite was stowed for return to Earth. Seconday payloads included: Evaluation of Oxygen Integration with Materials/Thermal Management Processes (EOIM-III/TEMP 2A), Consortium for Materials Development in Space Complex Autonomous Payload (CONCAP II and CONCAP III), IMAX Cargo Bay Camera (ICBC), Limited Duration Space Environment Candidate Materials Exposure (LDCE), Air Force Maui Optical Site (AMOS), Pituitary Growth Hormone Cell Function (PHCF), and Ultraviolet Plume Instrument (UVPI). Mission extended extra day to complete scientific objectives.[citation needed]

[edit]

See also

[edit]

References

[edit]

Public Domain This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. ↑ Harwood, William (July 9, 1990). "Two shuttle commanders disciplined, grounded". UPI Archive. Retrieved January 18, 2022. Gibson also was barred from T-38 jet trainer flights for one year while Walker was grounded for 60 days. Neither pilot will be eligible for reassignment to a shuttle mission until they are back on T-38 flight status.
  2. ↑ "STS-46". Spacefacts. Retrieved March 4, 2014.

Further reading

[edit]
[edit]